期刊文献+
共找到733篇文章
< 1 2 37 >
每页显示 20 50 100
Water-saving potential evaluation of water-receiving regions in Shandong province on the East Route of the South-to-North Water Transfer Project of China
1
作者 YIN Xiao-lin GAO Yuan-yuan +1 位作者 WU Hai-ping ZHAO Xue-ming 《Journal of Groundwater Science and Engineering》 2020年第3期287-297,共11页
Taking 13 water-receiving areas on the East Route of the South-to-North Water Diversion Project(ERSNWDP)in Shandong Province as the study area,and comparing it with Jiangsu Province on the ERSNWDP and the Middle Route... Taking 13 water-receiving areas on the East Route of the South-to-North Water Diversion Project(ERSNWDP)in Shandong Province as the study area,and comparing it with Jiangsu Province on the ERSNWDP and the Middle Route of the South-to-North(MRSNWDP),the current water-saving potential of the water-receiving areas within the municipalities of Shandong was analyzed.Different water-saving scenarios were constructed and analyzed with key water-saving indexes in various industries.These indexes include the effective utilization coefficient of farmland irrigation water,total water consumption of industrial sectors with an added value of over 10000 RMB,average leakage rate of the urban public water supply pipe network and the penetration rate of water-saving appliances.Based on the scenarios,comprehensive water-saving potential of the 13 water-receiving area cities was calculated.The results show that the water-saving potential of the study area is at a relative high level.However,some cities still have a certain amount of water-saving potential for agriculture and industry to be elevated.Under the recommended water-saving scenario,the water-saving potential is 1.134 billion m3,accounting for 5.33%of the current total water consumption,of which 460 million m3 is in agriculture,600 million m3 in industry,is and 74.20 million m3 in urban domestic sector.Comprehensive water-saving measures for the study area were proposed from the aspects of agricultural,industrial and domestic water uses.Agricultural and industrial water saving are more significant.The major cities for agricultural water saving include Jining City,Heze City,Weifang City and Jinan City;the focus cities of industrial water saving mainly include Weihai City,Jining City and Qingdao City and etc.;the key water-saving areas for urban use mainly include Zaozhuang City,Jining City and Heze City. 展开更多
关键词 east route of south-to-north water Diversion project Shandong water receiving area water-saving level water-saving potential
下载PDF
Geological conditions and key rock mechanics issues in the Western Route of South-to-North Water Transfer Project 被引量:2
2
作者 XuechaoWang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第3期234-243,共10页
In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel... In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed. 展开更多
关键词 the Western route of south-to-north water transfer project rock mechanics issues classification of surrounding rocks stability of surrounding rocks excavation-induced damage lining design
下载PDF
Estimating minimum ecological water required of the western route first stage project of China's south-to-north water transfer scheme for water exporting rivers
3
作者 MEN Bao-hui 《Journal of Environmental Science and Engineering》 2007年第1期19-24,共6页
下载PDF
Land Cover Changes and Drivers in the Water Source Area of the Middle Route of the South-to-North Water Diversion Project in China from 2000 to 2015 被引量:2
4
作者 GAO Wenwen ZENG Yuan +2 位作者 ZHAO Dan WU Bingfang REN Zhiyuan 《Chinese Geographical Science》 SCIE CSCD 2020年第1期115-126,共12页
The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial u... The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas. 展开更多
关键词 remote sensing land cover change object-based classification Middle route of the south-to-north water Diversion project(MR-SNWDP) China
下载PDF
Eco-environmental benefit assessment of China's South-North Water Transfer Scheme——the middle route project
5
作者 DUANGuang-ming ZHAOJing-zhu LIUGuo-hua KEBing XIAOHan WUGang DENGHong-bing 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2004年第2期308-315,共8页
This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of ... This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of SNWT's middle route project. Some benefits were calculated in monetary units. To make sure that the results can be comparable with normal monetary indices, concrete assessment objects and the parameters are prudently selected according to the major characteristics of the project and its water import region. Primary assessment revealed that in different project construction stages, the benefit could be more than 13 07 billion RMB Yuan in 2010 and 19 79 billion RMB Yuan in 2030, respectively. The monetary value tends to increase with social-economic development. To realize these potential benefits, however, calls for more endeavors. 展开更多
关键词 China's South-North water transfer Scheme(SNWT) the middle route project of South-North water transfer(MRPSNWT) assessment ecosystem services monetary indices
下载PDF
LONG AND DEEP DIVERSION TUNNELS OF 1^(ST) STAGE PROJECT IN WEST ROUTE OF SOUTH-NORTH WATER TRANSFER PROJECT
6
作者 Shen Fengsheng,Liu Xin (Reconnaissance,Planning,Design and Research Institute,Yellow River Construction Commission, Ministry of Water Resources, Zhengzhou 450003 China) 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2003年第9期1527-1532,共6页
West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze... West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze River to the upper reaches of the Yellow River. It is to be constructed in 3 stages, of which the 1st stage project includes delivering 4 billion m3 of water by gravity from two tributaries of Yalong River and three tributaries of Dadu River. The project consists of 5 dams,7 tunnels and a channel in series,with the dam height of 63~123 m and water transfer length of 260.3 km,of which the tunnels measure 244.1 km. The special climatic,environmental and geologic conditions make the project much more complicated in construction,especially 3 tunnels with the length longer than 50 km each create challenges to the technical requirements of engineering survey,design and construction. 展开更多
关键词 南水北调工程 西线工程 引水隧洞 TBM
下载PDF
Critical discharge at Datong for controlling operation of South-to-North Water Transfer Project in dry seasons 被引量:3
7
作者 Wang Yigang Huang Huiming Li Xi 《Water Science and Engineering》 EI CAS 2008年第2期47-58,共12页
关键词 saltwater intrusion critical discharge at Datong water diversion the south-to-north water transfer project
下载PDF
Forecasting Loss of Ecosystem Service Value Using a BP Network: A Case Study of the Impact of the South-to-north Water Transfer Project on the Ecological Environmental in Xiangfan, Hubei Province, China 被引量:1
8
作者 YUN-FENG CHEN, JING-XUAN ZHOU, JIE XIAO, AND YAN-PING LIEnvironmental Science and Engineering College, Huazhong University of Science and Technology, Wuhan 430074, Hubei, China 《Biomedical and Environmental Sciences》 SCIE CAS CSCD 2003年第4期379-391,共13页
Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific... Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific countermeasures. Methods A three-layer BP network was built to simulate topology and process of the eco-economy system of Xiangfan. Historical data of ecological environmental factors and socio-economic factors as inputs, and corresponding historical data of ecosystem service value (ESV) and GDP as target outputs, were presented to train and test the network. When predicted input data after 2001 were presented to trained network as generalization sets, ESVs and GDPs of 2002, 2003, 2004... till 2050 were simulated as output in succession. Results Up to 2050, the area would have suffered an accumulative total ESV loss of RMB 104.9 billion, which accounted for 37.36% of the present ESV. The coinstantaneous GDP would change asynchronously with ESV, it would go through an up-to-down process and finally lose RMB89.3 billion, which accounted for 18.71% of 2001. Conclusions The simulation indicates that ESV loss means damage to the capability of socio-economic sustainable development, and suggests that artificial neural networks (ANNs) provide a feasible and effective method and have an important potential in ESV modeling. 展开更多
关键词 Artificial neural network BP Ecosystem service value south-to-north water transfer project
下载PDF
Price Analysis of Water Supply for South-to-North Water Transfer Project
9
作者 QIU Zhong enProfessor, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China Tan Chang liSenior Engineer, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China ZHU Qin Engineer, Design Institute, Chan 《人民长江》 北大核心 2001年第S1期29-32,共4页
The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from ... The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from the viewpoint of economic policies. It is considered that if the project is assigned as a profitable one and built depending on commercial loan from bank completely or mostly, the water price will be too high to be undertaken by users,and if the project places the public good at first while considering the economic benefit, its investment mainly relies on the state (national or local governments) appropriation and self-raised funds and a little from the bank loan on favorable terms, the price determined according to the principle of satisfying the cost and reasonable profit will be relatively lower and can be undertaken by the users in the North China where water shortage is serious. The problem of higher water price of agricultural irrigation to the north of the Yellow River can be tackled by taking measures such as "compensating agriculture by industry" according to foreign practical experiences and relevant suggestions. 展开更多
关键词 PRICE of water supply water PRICE estimation FUND RAISING schemes water transfer cost Middle-route project of south-to-north water transfer
下载PDF
Coupling interaction between biodiversity and aquatic habitat area in Western Route Project vicinity 被引量:1
10
作者 Shi-min TIAN Zhao-yin WANG +1 位作者 Xiang-jun LIU Shi-kui LIANG 《Water Science and Engineering》 EI CAS 2010年第3期354-360,共7页
The Western Route of the South-to-North Water Transfer Project will divert water from the upper Yangtze River and its tributaries, the Dadu River and Yalong River, to the upper Yellow River. The project may ease the w... The Western Route of the South-to-North Water Transfer Project will divert water from the upper Yangtze River and its tributaries, the Dadu River and Yalong River, to the upper Yellow River. The project may ease the water shortage in the Yellow River Basin. However, it may also have some effects on the ecosystem in the upper Yangtze River Basin. Benthic invertebrates play an important role in the river ecosystem, particularly in the circulation of materials and nutrition. Benthic invertebrates are widely used to quickly assess river ecosystems because of their rapid response to changes in the water environment. The diversity of benthic invertebrates is closely associated with the aquatic habitat area. This study examined this interaction by sampling the benthic invertebrates in an expanding area. The conclusions are that the diversity of benthic invertebrates begins to decrease when the aquatic habitat area is reduced to 45% of the original area, and decreases dramatically when the aquatic habitat area is reduced to 10% of the original area. The aquatic habitat area should be kept at more than 45% of the original area in order to maintain the significant diversity of benthic invertebrates. 展开更多
关键词 Western route project south-to-north water transfer project river ecosystem benthic invertebrates BIODIVERSITY aquatic habitat area
下载PDF
Ecological assessment of lakeshore wetland rehabilitation on eastern route of South-to-North Water Transfer Project 被引量:1
11
作者 Jian ZHANG Fei MENG +4 位作者 Yifeng LU Yuming JING Huayong ZHANG Bo ZHANG Chenglu ZHANG 《Frontiers of Environmental Science & Engineering》 SCIE EI CSCD 2008年第3期306-310,共5页
To evaluate the ecological effects of lakeshore wetland rehabilitation on the eastern route of the Southto-NorthWater Transfer Project,species composition,coverage,height,and biomass of wetland communities at 22 sites... To evaluate the ecological effects of lakeshore wetland rehabilitation on the eastern route of the Southto-NorthWater Transfer Project,species composition,coverage,height,and biomass of wetland communities at 22 sites of the study area on the shore of Nansi Lake in April and May 2007 were investigated.The wetlands under investigation were divided into platform fields,transition zones,and shallow water zones according to differences in elevations,water levels,and human activities.The species richness index,Shannon-Wiener index,Simpson index,and Pielou Evenness index were adopted to delineate and discuss the ecological effects of lakeshore wetland rehabilitation in 22 quadrates.Results showed that the species richness of the wetland areas after 2 years’rehabilitation amounted to 47 of 24 families,higher than 25 of 20 families in areas without rehabilitation.The biodiversity index and abundance index of rehabilitated areas were also higher than those of platform fields and fish ponds where there was no rehabilitation.In addition,the Shannon-Wiener index,Simpson index,and community evenness index of platform fields in rehabilitated wetland areas were 1.619,0.745,and 0.860,respectively,higher than those of the platform fields before rehabilitating.The results suggested that the constructed lakeshore wetland played an important role in protecting the diversity of species. 展开更多
关键词 wetland rehabilitation Nansi Lake constructed wetland south-to-north water transfer project
原文传递
Simulation of Transport Channel in China's Middle Route South-to-North Water Transfer Project 被引量:3
12
作者 方神光 魏加华 +1 位作者 吴保生 尚毅梓 《Tsinghua Science and Technology》 SCIE EI CAS 2009年第3期367-377,共11页
The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate t... The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate the effect of many transfer structures on the water levels in the main channel. Various gate operating and control methods were analyzed to study the response to disturbances produced by varying the flow rates through the Tianjin outlet. The results show that when the inflow at the head changes in the same way as the sum of the flow rates through all the outlets, the transition time and the fluctuation of the water levels using the timed gate operation method are less than when using the simultaneous gate operation method, but the variations of the gate openings and flow rates through each control gate are much larger. The flow disturbances produced by the Tianjin outlet can be rectified within several channel sections and the transition time can be greatly shortened by allowing the water levels immediately upstream of the control gates to vary within proscribed ranges, rather than being held constant. 展开更多
关键词 Middle route south-to-north water transfer project unsteady flow open channel control system SIMULATION
原文传递
On conservation and development of architecture and environment in the construction of large-scale national infrastructure——Exemplified by the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project 被引量:1
13
作者 DUAN Jin ,LUO JianLi,WANG XingPing,TANG Jun&YU Gang School of Architecture,Southeast University,Nanjing 210096,China 《Science China(Technological Sciences)》 SCIE EI CAS 2009年第12期3613-3625,共13页
The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through ... The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through proposing and studying the canal culture routes,the water resources heritage corridors,the landscape and recreation corridors,and the town economic corridors.The station areas along the water-diverting route were scientifically zoned and graded through quantitative and qualitative synthetic methods.Both planning compendiums and construction controlling methods were proposed based on the project grades of points,lines,and areas.Conservation and development of architecture and environment in the large-scale national infrastructure construction were explored systemically.Theories and methods of developing harmonious water-supplying functions,ecological functions,landscape effects,and cultural effects of large-scale water resources were examined. 展开更多
关键词 Jiangsu Section of eastern route south-to-north water DIVERSION project CANAL culture routes water resources heritage CORRIDORS landscape and RECREATION CORRIDORS town economic CORRIDORS synthetical ZONING and grading
原文传递
南水北调西线工程水源区可调水量“十问”
14
作者 胡鹏 王浩 +13 位作者 赵勇 宁远 蒋云钟 刘欢 曾庆慧 杨泽凡 周毓彦 董宁澎 闫龙 阿膺兰 张丰博 唐家璇 王玉莲 王建华 《中国工程科学》 CSCD 北大核心 2024年第2期210-223,共14页
南水北调西线工程是我国“四横三纵”国家水网主骨架尚待建设的最后一环,而水源区可调水量是西线工程规划论证面临的焦点和难点问题。本文从水资源本底条件与演变趋势,生态环境与经济社会发展需水,调蓄水库与输水工程规模,调水对水源区... 南水北调西线工程是我国“四横三纵”国家水网主骨架尚待建设的最后一环,而水源区可调水量是西线工程规划论证面临的焦点和难点问题。本文从水资源本底条件与演变趋势,生态环境与经济社会发展需水,调蓄水库与输水工程规模,调水对水源区及其下游水资源开发利用、水生态环境、水力发电、航运等方面影响的角度,提出了与水源区可调水量相关的10个问题;以长江上游分布式水文模型为基础,建立了南水北调西线工程水源区可调水量模拟分析模型,力图系统、定量地回答所提问题。本文的主要研究结论有:在仅考虑满足水源区河道内外生态环境和经济社会需水的前提下,“上线+下线”组合方案多年平均可调水量为1.59×10^(10)m^(3),“完全下线”方案在建设岗托水库进行联调时,多年平均可调水量将达到1.74×10^(10)m^(3);在综合考虑调水对水源区水平衡、水力发电和航运影响及其可接受程度后,南水北调西线水源区可调水量为1.22×10^(10)~1.26×10^(10)m^(3)。长远来看,应谋划西南片区水网与国家水网主骨架、“大动脉”的连接与融合,在减小南水北调西线工程调水影响的同时,提高南水北调西线工程的整体供水能力以及对气候变化等外部条件的适应性。 展开更多
关键词 南水北调西线工程 水源区 可调水量 生态需水 跨流域调水
下载PDF
南水北调东线一期工程受水区生态环境效益演变
15
作者 高媛媛 杨亚锋 +2 位作者 杨荣雪 刘艺欣 王红瑞 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第3期566-574,共9页
研究南水北调东线一期工程通水以来受水区生态环境效益的演变态势,对南水北调后续工程高质量建设、加快构建国家水网以及促进工程综合效益发挥有决策参考作用。以定性定量相结合的方式分析东线一期工程在优化水资源配置、保障饮水安全... 研究南水北调东线一期工程通水以来受水区生态环境效益的演变态势,对南水北调后续工程高质量建设、加快构建国家水网以及促进工程综合效益发挥有决策参考作用。以定性定量相结合的方式分析东线一期工程在优化水资源配置、保障饮水安全、复苏河湖生态环境和畅通南北经济循环等方面的作用,进而结合层次分析法,从直接效益和间接效益2个方面,筛选构建东线一期工程受水区生态环境效益评价指标体系,主要包括工程年供水量、水质改善度、生态补水量、地下水压采量、地下水水位、水域面积、绿地面积和涵养水源等,并采用VlseKriterijumska Optimizacija I Kompromisno Resenje(VIKOR)多准则妥协解排序方法对南水北调东线一期工程通水以来即2013-2022年受水区生态环境效益演变态势进行分析。结果表明:南水北调东线一期工程通水的10年以来,受水区的生态环境整体复苏效果明显,近3年排序值保持在0.8以上;受降水偏枯进而影响地下水开采量和地下水水位等因素影响,2019年间接生态环境效益下降29.2%,之后迅速恢复并保持稳定。在分析直接效益和间接效益演变的基础上,从工程提质增效、提高工程水质状况以及完善体制机制建设等方面提出东线一期工程进一步促进受水区生态环境持续改善的策略和建议,以期为东线工程及受水区生态环境保护及高质量发展相关研究、决策制定等提供参考。 展开更多
关键词 南水北调东线一期工程 生态环境效益 指标体系 VIKOR
下载PDF
南水北调中线京石段闸门间歇关闭水力响应特性
16
作者 雷毓灵 崔巍 +3 位作者 王磊 丁志楠 穆祥鹏 陈文学 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第3期427-435,共9页
为减小闸门关闭引发的水位壅高,以南水北调中线工程京石段磁河闸至沙河北闸之间的渠池为研究对象,构建一维明渠非恒定渐变流仿真模型,比较分次间歇关闸与一次连续关闸,以及不同闸门间歇方案对闸前壅水峰值、水力振荡稳定时间的影响。研... 为减小闸门关闭引发的水位壅高,以南水北调中线工程京石段磁河闸至沙河北闸之间的渠池为研究对象,构建一维明渠非恒定渐变流仿真模型,比较分次间歇关闸与一次连续关闸,以及不同闸门间歇方案对闸前壅水峰值、水力振荡稳定时间的影响。研究表明:分次间歇关闸可带来更低的闸前壅水水位和更短的水力振荡稳定时间;设置1次间歇相较于多次间歇可减小闸前壅水峰值,将间歇开始时刻设置在上游降水波即将传播至闸前的时刻、设置间歇时长略小于关闸总时间的1/2均可有效降低闸前壅水峰值,缩短稳定时间。闸门分次间歇关闭水力响应特性与水波运动规律紧密关联,合理设置间歇有助于在应急调控阶段减少事故造成的影响。 展开更多
关键词 明渠水力学 南水北调中线工程 闸门分次间歇关闭 水力振荡 应急调度
下载PDF
南水北调西线水源区大型底栖动物的适宜水文条件
17
作者 王玉莲 闫龙 +3 位作者 曾庆慧 唐家璇 张丰搏 胡鹏 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第3期557-565,共9页
为探索南水北调西线工程水源区大型底栖动物群落结构及其适宜的水文条件,于2022年7月(汛期)及11月(非汛期)在南水北调西线工程水源区开展了2次大型底栖动物采样调查,共记录大型底栖动物50个分类单元。结果表明:西线水源区底栖动物群落... 为探索南水北调西线工程水源区大型底栖动物群落结构及其适宜的水文条件,于2022年7月(汛期)及11月(非汛期)在南水北调西线工程水源区开展了2次大型底栖动物采样调查,共记录大型底栖动物50个分类单元。结果表明:西线水源区底栖动物群落组成以节肢动物昆虫纲(Insecta)为绝对优势,占总分类单元数的90.20%。其中,汛期以扁蜉(Heptageniidae sp.,优势度Y=19.9%)为第一优势种,非汛期以襀(Perlidae sp.,优势度Y=13.8%)为第一优势种。时间上,汛期生物密度更高,但非汛期生物多样性及物种均匀度更高;空间上,西线工程上线方案调水河段的生物多样性及生物密度明显高于下线方案。在0~1.0 m/s的流速范围内,不同流速区间的物种数及Margalef多样性指数具有显著差异;且无论是汛期还是非汛期,流速在0.5~1.0 m/s的底栖动物物种数及各项生物多样性指数均处于最高水平。在0~0.6 m的水深范围内,不同水深区间的生物量在汛期或非汛期均具有显著差异,且底栖动物密度整体在0~0.2 m区间内的平均值最高。针对水源区8个优势物种,利用栖境使用模拟法,得到西线工程水源区河流大型底栖动物优势物种的适宜水文条件为水深0.2~0.4 m、流速0.3~0.6 m/s。 展开更多
关键词 南水北调西线工程 水源区 大型底栖动物 群落结构 适宜水文条件
下载PDF
南水北调东线江苏段典型泵站运行效率模拟模型
18
作者 杨靖仁 王超 +1 位作者 雷晓辉 何中政 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第2期388-398,共11页
泵站机组运行受多种因素影响,导致泵站运行理论效率与实际效率误差较大。针对泵站机组运行效率精准模拟难题,运用基于高价多项式回归、回归树、多元线性回归、向量机回归、高斯过程回归、神经网络的10个回归算法,建立泵站机组效率模拟... 泵站机组运行受多种因素影响,导致泵站运行理论效率与实际效率误差较大。针对泵站机组运行效率精准模拟难题,运用基于高价多项式回归、回归树、多元线性回归、向量机回归、高斯过程回归、神经网络的10个回归算法,建立泵站机组效率模拟模型并开展对比分析,优选出有效的泵站运行效率模拟建模方法。讨论分析采用“上下游水位+流量”代替传统“扬程+流量”开展泵站运行模拟的效果。以南水北调东线邳州站和遂宁二站共8台机组的历史数据开展实例分析,相关实验结果表明:在所有方法中,高斯过程回归(Gaussian process regression,GPR)模型在均方根误差(ERMS)、平均绝对误差(EMA)、均方误差(EMS)、决定系数(R2)和最大个体误差(EMI)指标上综合表现最佳,R2逼近0.95;使用站上、站下水位代替传统的扬程对模型进行训练,所有模型的综合评价指标整体有所改善。综合来看,使用GPR模型并使用上游、下游水位代替扬程进行模拟效率表现最好,以邳州站4号机为例,可将模拟效率的EMA和EMI分别从16.49%和20.40%减少至0.41%和2.30%,研究成果具有一定实际意义,可为我国调水工程泵站经济运行提供有力支撑。 展开更多
关键词 机器学习 深度学习 高斯过程回归 泵站效率模拟 南水北调东线
下载PDF
南水北调中线总干渠水情数据智能清洗
19
作者 陈晓楠 顾起豪 +2 位作者 张召 靳燕国 顾沁扬 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第3期436-444,共9页
南水北调中线总干渠水位、流量等实时水情数据受外界扰动、测量系统误差等因素影响而产生的病态水情数据将造成调度模型计算失真,甚至导致计算失败。为此,针对上下游流量数据空间上的逻辑错误和水位数据时间序列的跳变,分别建立基于粒... 南水北调中线总干渠水位、流量等实时水情数据受外界扰动、测量系统误差等因素影响而产生的病态水情数据将造成调度模型计算失真,甚至导致计算失败。为此,针对上下游流量数据空间上的逻辑错误和水位数据时间序列的跳变,分别建立基于粒子群优化的水量平衡模型和指数加权滑动平均模型,对病态水情数据在空间、时间上实施横向、纵向清洗处理。以穿黄节制闸至漳河节制闸间的渠段为典型研究区间,利用模型自动识别流量倒挂点,并对该渠段涉及的12座节制闸、26处分水点的流量数据进行统一修正,实现了上下游逻辑上的合理性。同时,选取研究渠段内的闫河节制闸为代表,在48 h内运行基本稳定状态下,对每2 h的闸前水位数据序列进行分析,自动识别出跳变数据并进行合理修正。结果表明:建立的模型可自动识别病态水情数据并进行智能清洗,处理后的数据能够较好地满足输水调度分析决策的需要,因此该模型具有推广应用的价值。 展开更多
关键词 南水北调中线 数据清洗 输水调度 粒子群优化算法 指数加权滑动平均模型
下载PDF
南水北调东线工程典型供排闸站施工导流分析研究
20
作者 侯钧宇 陈栋 +2 位作者 王凯 杨晨霞 严春华 《江苏水利》 2024年第3期33-36,共4页
南水北调东线工程南起扬州长江,经13个梯级提水入东平湖后,穿黄北送等,线路总长1466.5 km。鉴于南水北调输水干线上水工建筑物的功能多样,加固改造时供排水导流工况复杂,选取输水干线典型闸站即沙集闸站,分功能、分时段、分规模、分方... 南水北调东线工程南起扬州长江,经13个梯级提水入东平湖后,穿黄北送等,线路总长1466.5 km。鉴于南水北调输水干线上水工建筑物的功能多样,加固改造时供排水导流工况复杂,选取输水干线典型闸站即沙集闸站,分功能、分时段、分规模、分方案地进行导流,充分保障施工期工程原供排水充分效益发挥。 展开更多
关键词 南水北调东线工程 闸站 泵站 施工导流 供水 排水
下载PDF
上一页 1 2 37 下一页 到第
使用帮助 返回顶部