It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime...It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.展开更多
The introduction of several small and large-scale industries,malls,shopping complexes,and domestic applications has significantly increased energy consumption.The aim of the work is to simulate a technically viable an...The introduction of several small and large-scale industries,malls,shopping complexes,and domestic applications has significantly increased energy consumption.The aim of the work is to simulate a technically viable and economically optimum hybrid power system for residential buildings.The proposed micro-grid model includes four power generators:solar power,wind power,Electricity Board(EB)source,and a Diesel Generator(DG)set,with solar and wind power performing as major sources and the EB supply and DG set serving as backup sources.The core issue in direct current to alternate current conversion is harmonics distortion,a five-stage multilevel inverter is employed with the assistance of an intelligent control system is simulated and the optimum system configuration is estimated to reduce harmonics and improve the power quality.The monthly demand for residential buildings is 13-15 Megawatts.So,almost 433 Kilo-Watts(KW)of electricity is required every day,and if it is used for 8 h per day,50-60 KW of electricity is needed per hour.The overall micro-grid model’s operation and performance are established using MATLAB/SIMULINK software,and simulation results are provided.The simulation results show that the developed system is both cost-effective and environment friendly resulting in yearly cost reductions.展开更多
Reliable load frequency control(LFC) is crucial to the operation and design of modern electric power systems. Considering the LFC problem of a four-area interconnected power system with wind turbines, this paper prese...Reliable load frequency control(LFC) is crucial to the operation and design of modern electric power systems. Considering the LFC problem of a four-area interconnected power system with wind turbines, this paper presents a distributed model predictive control(DMPC) based on coordination scheme.The proposed algorithm solves a series of local optimization problems to minimize a performance objective for each control area. The generation rate constraints(GRCs), load disturbance changes, and the wind speed constraints are considered. Furthermore, the DMPC algorithm may reduce the impact of the randomness and intermittence of wind turbine effectively. A performance comparison between the proposed controller with and without the participation of the wind turbines is carried out. Analysis and simulation results show possible improvements on closed–loop performance, and computational burden with the physical constraints.展开更多
随着电力行业的快速发展,电气设备在火电厂中发挥着越来越重要的作用,火电厂电气设备的安全稳定运行对保障电力供应具有重要的意义。文章基于控制器局域网络(Controller Area Network,CAN)技术,设计了一种适用于火电厂电气监控系统的解...随着电力行业的快速发展,电气设备在火电厂中发挥着越来越重要的作用,火电厂电气设备的安全稳定运行对保障电力供应具有重要的意义。文章基于控制器局域网络(Controller Area Network,CAN)技术,设计了一种适用于火电厂电气监控系统的解决方案。该设计利用CAN实现气设备之间的高效通信和数据传输。CAN作为通信媒介,连接各个电气设备,包括发电机、变压器、开关设备等。通过这些设备可以实时传输监测数据和控制命令,从而实现对电气设备的实时监控和控制,提高火电厂电气监控的可靠性、实时性以及安全性。展开更多
文摘It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.
文摘The introduction of several small and large-scale industries,malls,shopping complexes,and domestic applications has significantly increased energy consumption.The aim of the work is to simulate a technically viable and economically optimum hybrid power system for residential buildings.The proposed micro-grid model includes four power generators:solar power,wind power,Electricity Board(EB)source,and a Diesel Generator(DG)set,with solar and wind power performing as major sources and the EB supply and DG set serving as backup sources.The core issue in direct current to alternate current conversion is harmonics distortion,a five-stage multilevel inverter is employed with the assistance of an intelligent control system is simulated and the optimum system configuration is estimated to reduce harmonics and improve the power quality.The monthly demand for residential buildings is 13-15 Megawatts.So,almost 433 Kilo-Watts(KW)of electricity is required every day,and if it is used for 8 h per day,50-60 KW of electricity is needed per hour.The overall micro-grid model’s operation and performance are established using MATLAB/SIMULINK software,and simulation results are provided.The simulation results show that the developed system is both cost-effective and environment friendly resulting in yearly cost reductions.
基金supported by National Natural Science Foundation of China(61533013,61273144)Scientific Technology Research and Development Plan Project of Tangshan(13130298B)Scientific Technology Research and Development Plan Project of Hebei(z2014070)
文摘Reliable load frequency control(LFC) is crucial to the operation and design of modern electric power systems. Considering the LFC problem of a four-area interconnected power system with wind turbines, this paper presents a distributed model predictive control(DMPC) based on coordination scheme.The proposed algorithm solves a series of local optimization problems to minimize a performance objective for each control area. The generation rate constraints(GRCs), load disturbance changes, and the wind speed constraints are considered. Furthermore, the DMPC algorithm may reduce the impact of the randomness and intermittence of wind turbine effectively. A performance comparison between the proposed controller with and without the participation of the wind turbines is carried out. Analysis and simulation results show possible improvements on closed–loop performance, and computational burden with the physical constraints.
文摘随着电力行业的快速发展,电气设备在火电厂中发挥着越来越重要的作用,火电厂电气设备的安全稳定运行对保障电力供应具有重要的意义。文章基于控制器局域网络(Controller Area Network,CAN)技术,设计了一种适用于火电厂电气监控系统的解决方案。该设计利用CAN实现气设备之间的高效通信和数据传输。CAN作为通信媒介,连接各个电气设备,包括发电机、变压器、开关设备等。通过这些设备可以实时传输监测数据和控制命令,从而实现对电气设备的实时监控和控制,提高火电厂电气监控的可靠性、实时性以及安全性。