Currently,light-transmitting,energy-saving,and electromagnetic shielding materials are essential for reducing indoor energy consumption and improving the electromagnetic environment.Here,we developed a cellulose compo...Currently,light-transmitting,energy-saving,and electromagnetic shielding materials are essential for reducing indoor energy consumption and improving the electromagnetic environment.Here,we developed a cellulose composite with excellent optical transmittance that retained the natural shape and fiber structure of bamboo.The modified whole bamboo possessed an impressive optical transmittance of approximately 60%at 6.23 mm,illuminance of 1000 luminance(lux),water absorption stability(mass change rate less than 4%),longitudinal tensile strength(46.40 MPa),and surface properties(80.2 HD).These were attributed to not only the retention of the natural circular hollow structure of the bamboo rod on the macro,but also the complete bamboo fiber skeleton template impregnated with UV resin on the micro.Moreover,a multilayered device consisting of translucent whole bamboo,transparent bamboo sheets,and electromagnetic shielding film exhibited remarkable heat insulation and heat preservation performance as well as an electromagnetic shielding performance of 46.3 dB.The impressive optical transmittance,mechanical properties,thermal performance,and electromagnetic shielding abilities combined with the renewable and sustainable nature,as well as the fast and efficient manufacturing process,make this bamboo composite material suitable for effective application in transparent,energy-saving,and electromagnetic shielding buildings.展开更多
Utilizing the hydrazine-assisted water electrolysis for energy-efficient hydrogen production shows a promising application, which relies on the development and design of efficient bifunctional electrocatalysts. Herein...Utilizing the hydrazine-assisted water electrolysis for energy-efficient hydrogen production shows a promising application, which relies on the development and design of efficient bifunctional electrocatalysts. Herein, we reported a low-content Pt-doped Rh metallene(Pt-Rhene) for hydrazine-assisted water electrolysis towards energy-saving hydrogen(H_(2)) production, where the ultrathin metallene is constructed to provide enough favorable active sites for catalysis and improve atom utilization.Additionally, the synergistic effect between Rh and Pt can optimize the electronic structure of Rh for improving the intrinsic activity. Therefore, the required overpotential of Pt-Rhene is only 37 mV to reach a current density of-10 mA cm^(-2) in the hydrogen evolution reaction(HER), and the Pt-Rhene exhibits a required overpotential of only 11 mV to reach a current density of 10 mA cm^(-2) in the hydrazine oxidation reaction(HzOR). With the constructed HER-HzOR two-electrode system, the Pt-Rhene electrodes exhibit an extremely low voltage(0.06/0.19/0.28 V) to achieve current densities of 10/50/100 mA cm^(-2) for energy-saving H_(2) production, which greatly reduces the electrolysis energy consumption. Moreover,DFT calculations further demonstrate that the introduction of Pt modulates the electronic structure of Rh and optimizes the d-band center, thus enhancing the adsorption and desorption of reactant/intermediates in the electrocatalytic reaction.展开更多
The long-term and effective implementation of the existing building energy efficiency renovation depends on the development of the existing building energy efficiency renovation market.The key to the development of th...The long-term and effective implementation of the existing building energy efficiency renovation depends on the development of the existing building energy efficiency renovation market.The key to the development of the existing building energy efficiency renovation market is the joint role of the market players.Starting with the analysis of the externalities and information asymmetry of the existing building energy efficiency renovation market,this paper analyzes the behavioral characteristics and influencing factors of the existing building energy efficiency renovation market entities(central government,local government,owners,energy conservation service enterprises,third-party evaluation institutions,and other market entities),and reveals the problems of the existing building energy efficiency renovation market,such as the absence of government,the lack of main power,and the lack of financing channels,Thus,it lays a platform foundation for the research on the behavior strategy and security system of the existing building energy-s aving renovation market.展开更多
The core of the healthy and orderly operation of the existing residential building energy-saving renovation market lies in the exploration of the implementation mechanism of multi-subject and multi-objective integrate...The core of the healthy and orderly operation of the existing residential building energy-saving renovation market lies in the exploration of the implementation mechanism of multi-subject and multi-objective integrated optimization.The multi-agent and multi-objective integrated optimization system framework is a powerful tool to guide the scientific decision-making of the market core structural entities in the future market practice. This paper analyzes the practical dilemma of energy-saving renovation of theexisting residential buildings in China, summarizes the practical experience of multi-subject and multi-objective integrated optimization of energy-saving renovation of the existing residential buildings in foreign countries, and puts forward beneficial practical enlightenment on the basis of comparison at home and abroad;The design principles of the target integrated optimization system have established a multi-subject and multi-objective integrated optimization system framework for the energy-saving renovation of the existing residential buildings, from six aspects: government guidance, trust consensus, value co-creation, risk sharing, revenue sharing, and social responsibility sharing. This paper proposes a multi-subject and multi-objective integrated practice strategy, in order to promote the efficient and orderly development of China's existing residential building energy-saving renovation market.展开更多
Intelligent greenhouse can promote the development of modern agriculture, realize the high quality and high yield of crops, and also bring greater economic benefits. In accordance with the climate conditions in northw...Intelligent greenhouse can promote the development of modern agriculture, realize the high quality and high yield of crops, and also bring greater economic benefits. In accordance with the climate conditions in northwest China, a set of intelligent control system for diversified environment of solar greenhouse was designed. The system divides the annual greenhouse control into six stages according to the optimal energy saving. It uses modern detection technology to collect the greenhouse environmental temperature, environmental humidity, soil humidity, CO_(2) concentration and illumination parameters under different working modes. It uses programmable logic control technology to realize the data processing of various parameters and the action control of rolling film, wet curtain fan and other actuators. It uses KingView monitoring software to realize the monitoring and manual control of greenhouse environment parameters. The operation results indicate that the control system runs stably and basically meets the control requirements.展开更多
In this study,we investigated on the application of planar lightwave circuit(PLC)technology in energy-saving control of tunnel lighting.The application status of PLC in the field of energy saving followed by the neces...In this study,we investigated on the application of planar lightwave circuit(PLC)technology in energy-saving control of tunnel lighting.The application status of PLC in the field of energy saving followed by the necessity of energy saving in tunnel lighting was analyzed.Finally,the application of PLC in tunnel lighting energy-saving control around the three dimensions of system overall architecture design,control scheme,and program control process was investigated.The results showed that the system meets the requirements of control effect,robustness,and visual effect after trial operation,and is suitable for practical applications.展开更多
Cu-Zn, Cu-Zn-Sn, Cu-Zn-Ni alloys were melted by vacuum smelter. The effect factors to the surface free energy of the alloys such as chemical composition, crystal structure and surface crystal lattice distortion etc. w...Cu-Zn, Cu-Zn-Sn, Cu-Zn-Ni alloys were melted by vacuum smelter. The effect factors to the surface free energy of the alloys such as chemical composition, crystal structure and surface crystal lattice distortion etc. were investigated by OCA30 automatic contact angle test instrument, metallography microscope and XRD instrument etc. Results suggests: adding alloy element to Cu may increase its surface free energy, and the more kinds of alloy elements are added, the more surface free energy increases; the alloy element Sn an increase the surface free energy of Cu-Zn alloy; Cu-Zn alloy with fir-tree crystal structure, great phase discrepancy and obvious composition aliquation has greater surface free energy; Cu-Zn alloy with compounds and serious surface crystal lattice distortion has greater surface free energy.展开更多
In order to acquire the most energy-saving luminairedistribution-parameters(LDPs)of highway tunnel interior zone backlighting,the parameters optimization model(POM)of backlighting for tunnel interior zone was establis...In order to acquire the most energy-saving luminairedistribution-parameters(LDPs)of highway tunnel interior zone backlighting,the parameters optimization model(POM)of backlighting for tunnel interior zone was established.Yanlieshan tunnel of Jiujing highway was taken as an example for the optimization.The optimal LDPs of the backlighting system of the tunnel interior zone were obtained by the POM,a comparison between the optimization results and those of Yanlieshan tunnel’s actual lighting system was performed,which showed that the optimized backlighting system with LED lamps installed according to the optimized LDPs could save energy remarkablely even under full capacity lighting condition.Illuminance and illuminance uniformity of the tunnel road surface still met the lighting demands even the LED lamp’s luminance decreased by 30%.A backlighting simulation experiment with the optimized backlighting LDPs for Yanlieshan tunnel was accomplished in the software Dialux.The simulation results basically agreed with the optimization calculated results from the POM which proved the correctness of the backlighting POM.展开更多
Li_(4)Ti_(5)O_(12)(LTO) anode material demonstrates superior cycling performance due to its stable spinel structure and high lithiation/de-lithiation potential.Herein,a novel energy-saving solid-phase synthesis route ...Li_(4)Ti_(5)O_(12)(LTO) anode material demonstrates superior cycling performance due to its stable spinel structure and high lithiation/de-lithiation potential.Herein,a novel energy-saving solid-phase synthesis route for LTO has been successfully designed,employing the cheap industrial intermediate product of metatitanic acid (HTO) as titanium source.Through the in-situ Fourier transform infrared spectroscopy (FTIR)and ex-situ X-ray diffraction (XRD),it is revealed for the first time that the amorphous crystal structure of HTO is more conducive for the Li+insertion,making it possible to prepare LTO at a relatively lower sintering temperature.Utilizing the dehydration carbonization reaction between glucose and sulfuric acid,an ingenious strategy of glucose pre-coating is adopted to avoid the generation of Li_(2)SO_(4) impurity caused by the residual sulfuric acid on the surface of HTO,which meanwhile enhances the conductivity and inhibits the particle growth of LTO.The obtained ALTO@C anode material consequently exhibits excellent electrochemical performance that 132.0 m Ah g^(-1)is remained even at 20 C,and ultra low decay rate of 0.015% per cycle is achieved during 1000 cycles at 2 C.Remarkably,LiCoO_(2)//ALTO@C full cell delivers conspicuous low-temperature property (130.7 m Ah g^(-1)at 0.5 C and almost no attenuation after 300 cycles under-20℃).展开更多
Electrocatalytic water splitting is a viable technique for generating hydrogen but is precluded from the sluggish kinetics of oxygen evolution reactions(OER).Small molecule oxidation reactions with lower working poten...Electrocatalytic water splitting is a viable technique for generating hydrogen but is precluded from the sluggish kinetics of oxygen evolution reactions(OER).Small molecule oxidation reactions with lower working potentials,such as methanol oxidation reactions,are good alternatives to OER with faster kinetics.However,the typically employed Ni-based electrocatalysts have poor activity and stability.Herein,a novel three-dimensional(3D)-networking Modoped Ni(OH)_(2) with ultralow Ni-Ni coordination is synthesized,which exhibits a high MOR activity of 100 mA cm^(−2) at 1.39 V,delivering 28 mV dec^(−1) for the Tafel slope.Meanwhile,hydrogen evolution with value-added formate co-generation is boosted with a current density of more than 500 mA cm^(−2) at a cell voltage of 2.00 V for 50 h,showing excellent stability in an industrial alkaline concentration(6 M KOH).Mechanistic studies based on density functional the-ory and X-ray absorption spectroscopy showed that the improved performance is mainly attributed to the ultralow Ni-Ni coordination,3D-networking structures and Mo dopants,which improve the catalytic activity,increase the active site density and strengthen the Ni(OH)_(2)3D-networking structures,respectively.This study paves a new way for designing electrocatalysts with enhanced activity and durability for industrial energy-saving hydrogen production.展开更多
Many researches discussing reduced energy consumption for environmental protection focus on machine efficiency or process redesign. To optimize the machine operation time can also save the energy, and these researches...Many researches discussing reduced energy consumption for environmental protection focus on machine efficiency or process redesign. To optimize the machine operation time can also save the energy, and these researches have received great interests in recent years. This study considers three different states of machines, among processing there are two different speeds, to solve the problem of minimizing energy costs under time-of-use tariff with no tardy jobs in flexible flow shop. This problem is basically NP-hard, we proposed a hybrid genetic algorithm (GA) to solve problems in reasonable timeliness. The result shows that to optimize different states of machines under time-of use tariff can reduce energy costs significantly in on-time delivery.展开更多
Changeful and complex rural family structure and climatic features of transitional areas in China make the application of variable strategy in energy-saving rural residence designs possible.Aiming at the low cost,seve...Changeful and complex rural family structure and climatic features of transitional areas in China make the application of variable strategy in energy-saving rural residence designs possible.Aiming at the low cost,several effective and reasonable variable strategies were proposed for the design of interior spaces,main bedroom,sunshine room,staircase,west wall,door and window design to satisfy changing structure of a family during different periods and their different thermo-technical requirements in winter and summer.In this way,thermal comfort of rural indoor spaces will be improved,more energy saved,useful experience and thoughts provided for the energy-saving residence design in cold regions and regions hot in summer and cold in winter.展开更多
The investment risk management of the existing building energy-saving renovation project for ESCO cannot be separated from the scientific risk measurement and evaluation. The investment risk assessment is the basis of...The investment risk management of the existing building energy-saving renovation project for ESCO cannot be separated from the scientific risk measurement and evaluation. The investment risk assessment is the basis of investment decision and project implementation. Based on the content analysis and balance of evaluation principle of investment risk evaluation on the existing building energy-saving renovation project, we set up three levels of existing building energy-saving renovation project investment risk evaluation index system, use fuzzy comprehensive evaluation method to evaluate the quantitative process, get the scientific assessment of the investment risk of existing building energy-saving renovation project, and support the investment risk response strategy and control measures of existing building energy-saving renovation project for ESCO.展开更多
this paper suggested a model to address two important but unexplored questions-how EPC affects the buildings energy-saving performance and how institutional legitimacy of ESCOs moderates the relationship between EPC a...this paper suggested a model to address two important but unexplored questions-how EPC affects the buildings energy-saving performance and how institutional legitimacy of ESCOs moderates the relationship between EPC and buildings energy-saving performance.The results indicate that the implementation of EPC has a positive effect on building senergy-saving performance.And also,the sociopolitical legitimacy positively moderates the relationship between the implement of EPC and buildings energy-saving performance and the cognitive legitimacy positively moderates the relationship between the implement of EPC and buildings energy-saving performance.展开更多
The market development and policy matching of existing building energy-saving retrofits determine the effectiveness of policies in promoting the operation of existing building energy-saving retrofit market.Based on th...The market development and policy matching of existing building energy-saving retrofits determine the effectiveness of policies in promoting the operation of existing building energy-saving retrofit market.Based on the perspective of market development to evaluate the effectiveness of existing building energy-saving transformation policy,it is necessary to clarify the basic connotation of the effectiveness of existing building energy-saving transformation policy,systematically analyze the evaluation content,construct a multi-level evaluation index system,and select scientific and effective quantitative evaluation methods to implement a strict evaluation process.展开更多
ESCO is the internal driving force for the development of the existing building energy-saving renovation market,and the driving effect of the ESCO market depends on scientific and effective comprehensive benefit evalu...ESCO is the internal driving force for the development of the existing building energy-saving renovation market,and the driving effect of the ESCO market depends on scientific and effective comprehensive benefit evaluation.Based on analysis of the status qua at home and abroad,this paper reveals the necessity and value of research existing Building Energy Saving ESCO market development driving force effectiveness evaluation.The purpose of ESCO driving force benefit evaluation-oriented,establish the basic principles of evaluation index system of choice.Through the analysis of the evaluation content of the three dimensions of economic benefit,environmental benefit and social benefit,the comprehensive evaluation index system of the target level,criterion level and index level of the benefit evaluation of the existing building energy-saving renovation market development is constructed.AHP and fuzzy comprehensive evaluation of the combination,construct quantitative models of energy-saving drive ESCO market development role in the evaluation of the effectiveness of existing buildings.Based on the quantitative evaluation process of ESCO’s role in the development of our country’s existing building energysaving renovation market,it is necessary to scientifically understand the current status of ESCO’s driving role,and reveal the path to improve the efficiency of ESCO-driven development of the existing building’s energy-saving renovation market,in order to enhance the internal driving force of ESCO to promote.The existing building energy-saving renovation market is developing in a healthy and orderly manner.展开更多
Aiming at a comprehensive assessment of energy-saving retrofitting effect on existing buildings,a calculation method is developed to adjust energy-saving quantity in standard condition for comparison under the same co...Aiming at a comprehensive assessment of energy-saving retrofitting effect on existing buildings,a calculation method is developed to adjust energy-saving quantity in standard condition for comparison under the same conditions. A mathematical model,method theory and calculation steps are given. Error analysis results show that this method can be applied accurately to practical engineering projects. In a case study of energy-saving quantity assessment before and after retrofitting on a certain hospital in Shanghai,with energy simulation software TRNSYS,detailed application of this method is introduced and analyzed. The method is applied to the case of energy-saving quantity assessment to a hospital in Shanghai before and after retrofitting with the energy simulation software TRNSYS.展开更多
An energy consumption analysis based on the heating characteristic of a building with central heat exchanger in a university of Tianjin was done,and the feasibility of intermittent heating with variable speed pumps wa...An energy consumption analysis based on the heating characteristic of a building with central heat exchanger in a university of Tianjin was done,and the feasibility of intermittent heating with variable speed pumps was discussed. By comparing various methods of energy consumption analysis,a modified Bin method based on the weather data in Tianjin was adopted. The heat consumption of the buildings under intermittent heating mode was calculated and compared with continuous heating mode,the result shows that intermittent heating can reduce energy consumption for 1 941 759 kW·h,save standard coal for 341 t,and reduce pump power consumption for 72 679 kW·h annually. Intermittent operation by means of varying the pump frequency not only leads to savings in fuel consumption and reduction in pollutant emissions,but also reduces operating costs significantly and it is an ideal energy-saving method. By analyzing the results,the recommendations of heating operation regulation and the transformation of pipe network were proposed separately to different kinds of buildings in colleges,such as laboratory building,teaching building.展开更多
A reduction of fuel consumption and an increase in efficiency are currently required for river–sea bulk carriers.Pre-swirl and ducted stators are widely used devices in the industry and efficiency gains can be obtain...A reduction of fuel consumption and an increase in efficiency are currently required for river–sea bulk carriers.Pre-swirl and ducted stators are widely used devices in the industry and efficiency gains can be obtained for single-screw and twin-screw vessels.Based on the hydrodynamic characteristics of the 20,000DWT river–sea bulk carrier,in this study,we proposed,designed,and tested a series of pre-swirl energy-saving devices(ESDs).The experimental results demonstrate that the proposed ESDs improved the propulsive efficiency and reduced the delivered power.The results confirm the success of our ESD for the 20,000DWT river–sea bulk carrier.We validated the role of Reynolds-averaged Navier–Stokes(RANS)computational fluid dynamics(CFD)in the twin-skeg river–sea vessel ESD design and found the circumferential arrangement and number of stators to be important factors in the design process.展开更多
In this paper,the effects of loom speed fluctuation on the mean speed and on the power ofdriving motor were investigated and the expressions for these effects were derived.Based on theenergy relationships,a new index ...In this paper,the effects of loom speed fluctuation on the mean speed and on the power ofdriving motor were investigated and the expressions for these effects were derived.Based on theenergy relationships,a new index of equivalent fluctuation was introduced,the connection be-tween this equivalent fluctuation and the energy of speed function on frequency domain was thenfound.In addition to the above theme,the residual kinetic energy of the shuttle and pickingmechanism,taken as a considerable part in the potentiality of loom energy-saving was also ana-lysed.According to the results of theoretical analyses,the ways of energy-saving in looms weresuggested.Finally,taking the loom of 1511 type as a practical example,the potentiality ofenergy-saving was calculated.展开更多
基金supported by the National Natural Science Foundation of China (Nos. 32071687 and 52273247)Jiangsu Qinglan Project
文摘Currently,light-transmitting,energy-saving,and electromagnetic shielding materials are essential for reducing indoor energy consumption and improving the electromagnetic environment.Here,we developed a cellulose composite with excellent optical transmittance that retained the natural shape and fiber structure of bamboo.The modified whole bamboo possessed an impressive optical transmittance of approximately 60%at 6.23 mm,illuminance of 1000 luminance(lux),water absorption stability(mass change rate less than 4%),longitudinal tensile strength(46.40 MPa),and surface properties(80.2 HD).These were attributed to not only the retention of the natural circular hollow structure of the bamboo rod on the macro,but also the complete bamboo fiber skeleton template impregnated with UV resin on the micro.Moreover,a multilayered device consisting of translucent whole bamboo,transparent bamboo sheets,and electromagnetic shielding film exhibited remarkable heat insulation and heat preservation performance as well as an electromagnetic shielding performance of 46.3 dB.The impressive optical transmittance,mechanical properties,thermal performance,and electromagnetic shielding abilities combined with the renewable and sustainable nature,as well as the fast and efficient manufacturing process,make this bamboo composite material suitable for effective application in transparent,energy-saving,and electromagnetic shielding buildings.
基金financially supported by the National Natural Science Foundation of China (No. 21972126, 21978264, 21905250, and 22278369)the Natural Science Foundation of Zhejiang Province (No. LQ22B030012 and LQ23B030010)the China Postdoctoral Science Foundation (2021M702889)。
文摘Utilizing the hydrazine-assisted water electrolysis for energy-efficient hydrogen production shows a promising application, which relies on the development and design of efficient bifunctional electrocatalysts. Herein, we reported a low-content Pt-doped Rh metallene(Pt-Rhene) for hydrazine-assisted water electrolysis towards energy-saving hydrogen(H_(2)) production, where the ultrathin metallene is constructed to provide enough favorable active sites for catalysis and improve atom utilization.Additionally, the synergistic effect between Rh and Pt can optimize the electronic structure of Rh for improving the intrinsic activity. Therefore, the required overpotential of Pt-Rhene is only 37 mV to reach a current density of-10 mA cm^(-2) in the hydrogen evolution reaction(HER), and the Pt-Rhene exhibits a required overpotential of only 11 mV to reach a current density of 10 mA cm^(-2) in the hydrazine oxidation reaction(HzOR). With the constructed HER-HzOR two-electrode system, the Pt-Rhene electrodes exhibit an extremely low voltage(0.06/0.19/0.28 V) to achieve current densities of 10/50/100 mA cm^(-2) for energy-saving H_(2) production, which greatly reduces the electrolysis energy consumption. Moreover,DFT calculations further demonstrate that the introduction of Pt modulates the electronic structure of Rh and optimizes the d-band center, thus enhancing the adsorption and desorption of reactant/intermediates in the electrocatalytic reaction.
基金supported by the National Natural Science Foundation of China (Grant No.71872122)Late-stage Subsidy Project of Humanities and Social Sciences of the Education Department of China (Grant No. 20JHQ095)。
文摘The long-term and effective implementation of the existing building energy efficiency renovation depends on the development of the existing building energy efficiency renovation market.The key to the development of the existing building energy efficiency renovation market is the joint role of the market players.Starting with the analysis of the externalities and information asymmetry of the existing building energy efficiency renovation market,this paper analyzes the behavioral characteristics and influencing factors of the existing building energy efficiency renovation market entities(central government,local government,owners,energy conservation service enterprises,third-party evaluation institutions,and other market entities),and reveals the problems of the existing building energy efficiency renovation market,such as the absence of government,the lack of main power,and the lack of financing channels,Thus,it lays a platform foundation for the research on the behavior strategy and security system of the existing building energy-s aving renovation market.
基金supported by the National Natural Science Foundation of China (Grant No.71872122)Late-stage Subsidy Project of Humanities and Social Sciences of the EducationDepartment of China (Grant No. 20JHQ095)。
文摘The core of the healthy and orderly operation of the existing residential building energy-saving renovation market lies in the exploration of the implementation mechanism of multi-subject and multi-objective integrated optimization.The multi-agent and multi-objective integrated optimization system framework is a powerful tool to guide the scientific decision-making of the market core structural entities in the future market practice. This paper analyzes the practical dilemma of energy-saving renovation of theexisting residential buildings in China, summarizes the practical experience of multi-subject and multi-objective integrated optimization of energy-saving renovation of the existing residential buildings in foreign countries, and puts forward beneficial practical enlightenment on the basis of comparison at home and abroad;The design principles of the target integrated optimization system have established a multi-subject and multi-objective integrated optimization system framework for the energy-saving renovation of the existing residential buildings, from six aspects: government guidance, trust consensus, value co-creation, risk sharing, revenue sharing, and social responsibility sharing. This paper proposes a multi-subject and multi-objective integrated practice strategy, in order to promote the efficient and orderly development of China's existing residential building energy-saving renovation market.
基金Supported by Scientific Research Project of Hunan Province in 2020(20C1848)。
文摘Intelligent greenhouse can promote the development of modern agriculture, realize the high quality and high yield of crops, and also bring greater economic benefits. In accordance with the climate conditions in northwest China, a set of intelligent control system for diversified environment of solar greenhouse was designed. The system divides the annual greenhouse control into six stages according to the optimal energy saving. It uses modern detection technology to collect the greenhouse environmental temperature, environmental humidity, soil humidity, CO_(2) concentration and illumination parameters under different working modes. It uses programmable logic control technology to realize the data processing of various parameters and the action control of rolling film, wet curtain fan and other actuators. It uses KingView monitoring software to realize the monitoring and manual control of greenhouse environment parameters. The operation results indicate that the control system runs stably and basically meets the control requirements.
文摘In this study,we investigated on the application of planar lightwave circuit(PLC)technology in energy-saving control of tunnel lighting.The application status of PLC in the field of energy saving followed by the necessity of energy saving in tunnel lighting was analyzed.Finally,the application of PLC in tunnel lighting energy-saving control around the three dimensions of system overall architecture design,control scheme,and program control process was investigated.The results showed that the system meets the requirements of control effect,robustness,and visual effect after trial operation,and is suitable for practical applications.
基金This work was financially supported by the Key Technologies R&D Programme of Tianjin (06YFGZGX02400).
文摘Cu-Zn, Cu-Zn-Sn, Cu-Zn-Ni alloys were melted by vacuum smelter. The effect factors to the surface free energy of the alloys such as chemical composition, crystal structure and surface crystal lattice distortion etc. were investigated by OCA30 automatic contact angle test instrument, metallography microscope and XRD instrument etc. Results suggests: adding alloy element to Cu may increase its surface free energy, and the more kinds of alloy elements are added, the more surface free energy increases; the alloy element Sn an increase the surface free energy of Cu-Zn alloy; Cu-Zn alloy with fir-tree crystal structure, great phase discrepancy and obvious composition aliquation has greater surface free energy; Cu-Zn alloy with compounds and serious surface crystal lattice distortion has greater surface free energy.
基金National Natural Science Foundation of China(No.61463015)
文摘In order to acquire the most energy-saving luminairedistribution-parameters(LDPs)of highway tunnel interior zone backlighting,the parameters optimization model(POM)of backlighting for tunnel interior zone was established.Yanlieshan tunnel of Jiujing highway was taken as an example for the optimization.The optimal LDPs of the backlighting system of the tunnel interior zone were obtained by the POM,a comparison between the optimization results and those of Yanlieshan tunnel’s actual lighting system was performed,which showed that the optimized backlighting system with LED lamps installed according to the optimized LDPs could save energy remarkablely even under full capacity lighting condition.Illuminance and illuminance uniformity of the tunnel road surface still met the lighting demands even the LED lamp’s luminance decreased by 30%.A backlighting simulation experiment with the optimized backlighting LDPs for Yanlieshan tunnel was accomplished in the software Dialux.The simulation results basically agreed with the optimization calculated results from the POM which proved the correctness of the backlighting POM.
基金financial support from the Major Science and Technology Projects of Sichuan Province(2019KJT0078)the National Natural Science Foundation of China(51904193)the Fundamental Research Funds for the Central Universities。
文摘Li_(4)Ti_(5)O_(12)(LTO) anode material demonstrates superior cycling performance due to its stable spinel structure and high lithiation/de-lithiation potential.Herein,a novel energy-saving solid-phase synthesis route for LTO has been successfully designed,employing the cheap industrial intermediate product of metatitanic acid (HTO) as titanium source.Through the in-situ Fourier transform infrared spectroscopy (FTIR)and ex-situ X-ray diffraction (XRD),it is revealed for the first time that the amorphous crystal structure of HTO is more conducive for the Li+insertion,making it possible to prepare LTO at a relatively lower sintering temperature.Utilizing the dehydration carbonization reaction between glucose and sulfuric acid,an ingenious strategy of glucose pre-coating is adopted to avoid the generation of Li_(2)SO_(4) impurity caused by the residual sulfuric acid on the surface of HTO,which meanwhile enhances the conductivity and inhibits the particle growth of LTO.The obtained ALTO@C anode material consequently exhibits excellent electrochemical performance that 132.0 m Ah g^(-1)is remained even at 20 C,and ultra low decay rate of 0.015% per cycle is achieved during 1000 cycles at 2 C.Remarkably,LiCoO_(2)//ALTO@C full cell delivers conspicuous low-temperature property (130.7 m Ah g^(-1)at 0.5 C and almost no attenuation after 300 cycles under-20℃).
基金We gratefully thank the financial support from the National Natural Science Foundation of China(22272108,21975163 and 22003041)Shenzhen Science and Technology Program(No.KQTD20190929173914967,JCYJ20200109110416441)the Senior Talent Research Start-up Fund of Shenzhen University(000263 and 000265).
文摘Electrocatalytic water splitting is a viable technique for generating hydrogen but is precluded from the sluggish kinetics of oxygen evolution reactions(OER).Small molecule oxidation reactions with lower working potentials,such as methanol oxidation reactions,are good alternatives to OER with faster kinetics.However,the typically employed Ni-based electrocatalysts have poor activity and stability.Herein,a novel three-dimensional(3D)-networking Modoped Ni(OH)_(2) with ultralow Ni-Ni coordination is synthesized,which exhibits a high MOR activity of 100 mA cm^(−2) at 1.39 V,delivering 28 mV dec^(−1) for the Tafel slope.Meanwhile,hydrogen evolution with value-added formate co-generation is boosted with a current density of more than 500 mA cm^(−2) at a cell voltage of 2.00 V for 50 h,showing excellent stability in an industrial alkaline concentration(6 M KOH).Mechanistic studies based on density functional the-ory and X-ray absorption spectroscopy showed that the improved performance is mainly attributed to the ultralow Ni-Ni coordination,3D-networking structures and Mo dopants,which improve the catalytic activity,increase the active site density and strengthen the Ni(OH)_(2)3D-networking structures,respectively.This study paves a new way for designing electrocatalysts with enhanced activity and durability for industrial energy-saving hydrogen production.
文摘Many researches discussing reduced energy consumption for environmental protection focus on machine efficiency or process redesign. To optimize the machine operation time can also save the energy, and these researches have received great interests in recent years. This study considers three different states of machines, among processing there are two different speeds, to solve the problem of minimizing energy costs under time-of-use tariff with no tardy jobs in flexible flow shop. This problem is basically NP-hard, we proposed a hybrid genetic algorithm (GA) to solve problems in reasonable timeliness. The result shows that to optimize different states of machines under time-of use tariff can reduce energy costs significantly in on-time delivery.
基金Supported by 2009 Scientific and Technological Program of Zhengzhou Provincial Department of Science and Technology:Study on the Optimal Energy-Conservation Design of Low-cost Rural Residences in Henan Province2011 Undergraduates' Innovative Program of North China University of Water Resources and Electric Power:Study on the Energy-Conservation Design of Regional Rural Residences in Henan Province
文摘Changeful and complex rural family structure and climatic features of transitional areas in China make the application of variable strategy in energy-saving rural residence designs possible.Aiming at the low cost,several effective and reasonable variable strategies were proposed for the design of interior spaces,main bedroom,sunshine room,staircase,west wall,door and window design to satisfy changing structure of a family during different periods and their different thermo-technical requirements in winter and summer.In this way,thermal comfort of rural indoor spaces will be improved,more energy saved,useful experience and thoughts provided for the energy-saving residence design in cold regions and regions hot in summer and cold in winter.
基金supported by the National Natural Science Foundation of China (Grant No. 71573188)the Soft Science Research Project of Ministry of Housing and Urban - Rural Development (Grant No. 2013-R1-14)Tianjin Social Sciences Planning Post-funded Projects (Grant No. TJGLHQ1403)
文摘The investment risk management of the existing building energy-saving renovation project for ESCO cannot be separated from the scientific risk measurement and evaluation. The investment risk assessment is the basis of investment decision and project implementation. Based on the content analysis and balance of evaluation principle of investment risk evaluation on the existing building energy-saving renovation project, we set up three levels of existing building energy-saving renovation project investment risk evaluation index system, use fuzzy comprehensive evaluation method to evaluate the quantitative process, get the scientific assessment of the investment risk of existing building energy-saving renovation project, and support the investment risk response strategy and control measures of existing building energy-saving renovation project for ESCO.
文摘this paper suggested a model to address two important but unexplored questions-how EPC affects the buildings energy-saving performance and how institutional legitimacy of ESCOs moderates the relationship between EPC and buildings energy-saving performance.The results indicate that the implementation of EPC has a positive effect on building senergy-saving performance.And also,the sociopolitical legitimacy positively moderates the relationship between the implement of EPC and buildings energy-saving performance and the cognitive legitimacy positively moderates the relationship between the implement of EPC and buildings energy-saving performance.
基金supported by the National Natural Fund of China(Grant No.71872122)Later Stage Support Project of Philosophy and Social Sciences Research of the Ministry of Education of China(Grant No.16JHQ031)+1 种基金Later Stage Support Project of Tianjin Social Science Planning(Grant No.TJGLHQ1403)Higher Education Innovation Team of Tianjin(Grant No.TD13-5006)。
文摘The market development and policy matching of existing building energy-saving retrofits determine the effectiveness of policies in promoting the operation of existing building energy-saving retrofit market.Based on the perspective of market development to evaluate the effectiveness of existing building energy-saving transformation policy,it is necessary to clarify the basic connotation of the effectiveness of existing building energy-saving transformation policy,systematically analyze the evaluation content,construct a multi-level evaluation index system,and select scientific and effective quantitative evaluation methods to implement a strict evaluation process.
基金supported by the National Natural Science Foundation of China(Grant No.71872122)Late-stage Subsidy Project of Humanities and Social Sciences of the Ministry of Education of China(20JHQ095)Higher Education Innovation Team of Tianjin(TD13-5006).
文摘ESCO is the internal driving force for the development of the existing building energy-saving renovation market,and the driving effect of the ESCO market depends on scientific and effective comprehensive benefit evaluation.Based on analysis of the status qua at home and abroad,this paper reveals the necessity and value of research existing Building Energy Saving ESCO market development driving force effectiveness evaluation.The purpose of ESCO driving force benefit evaluation-oriented,establish the basic principles of evaluation index system of choice.Through the analysis of the evaluation content of the three dimensions of economic benefit,environmental benefit and social benefit,the comprehensive evaluation index system of the target level,criterion level and index level of the benefit evaluation of the existing building energy-saving renovation market development is constructed.AHP and fuzzy comprehensive evaluation of the combination,construct quantitative models of energy-saving drive ESCO market development role in the evaluation of the effectiveness of existing buildings.Based on the quantitative evaluation process of ESCO’s role in the development of our country’s existing building energysaving renovation market,it is necessary to scientifically understand the current status of ESCO’s driving role,and reveal the path to improve the efficiency of ESCO-driven development of the existing building’s energy-saving renovation market,in order to enhance the internal driving force of ESCO to promote.The existing building energy-saving renovation market is developing in a healthy and orderly manner.
基金Project(2006BAJ03A10) supported by the National Key Technologies R & D Program of China
文摘Aiming at a comprehensive assessment of energy-saving retrofitting effect on existing buildings,a calculation method is developed to adjust energy-saving quantity in standard condition for comparison under the same conditions. A mathematical model,method theory and calculation steps are given. Error analysis results show that this method can be applied accurately to practical engineering projects. In a case study of energy-saving quantity assessment before and after retrofitting on a certain hospital in Shanghai,with energy simulation software TRNSYS,detailed application of this method is introduced and analyzed. The method is applied to the case of energy-saving quantity assessment to a hospital in Shanghai before and after retrofitting with the energy simulation software TRNSYS.
文摘An energy consumption analysis based on the heating characteristic of a building with central heat exchanger in a university of Tianjin was done,and the feasibility of intermittent heating with variable speed pumps was discussed. By comparing various methods of energy consumption analysis,a modified Bin method based on the weather data in Tianjin was adopted. The heat consumption of the buildings under intermittent heating mode was calculated and compared with continuous heating mode,the result shows that intermittent heating can reduce energy consumption for 1 941 759 kW·h,save standard coal for 341 t,and reduce pump power consumption for 72 679 kW·h annually. Intermittent operation by means of varying the pump frequency not only leads to savings in fuel consumption and reduction in pollutant emissions,but also reduces operating costs significantly and it is an ideal energy-saving method. By analyzing the results,the recommendations of heating operation regulation and the transformation of pipe network were proposed separately to different kinds of buildings in colleges,such as laboratory building,teaching building.
基金supported by Ministry of Science and Technology of the People’s Republic of China No.2014BAG04B01
文摘A reduction of fuel consumption and an increase in efficiency are currently required for river–sea bulk carriers.Pre-swirl and ducted stators are widely used devices in the industry and efficiency gains can be obtained for single-screw and twin-screw vessels.Based on the hydrodynamic characteristics of the 20,000DWT river–sea bulk carrier,in this study,we proposed,designed,and tested a series of pre-swirl energy-saving devices(ESDs).The experimental results demonstrate that the proposed ESDs improved the propulsive efficiency and reduced the delivered power.The results confirm the success of our ESD for the 20,000DWT river–sea bulk carrier.We validated the role of Reynolds-averaged Navier–Stokes(RANS)computational fluid dynamics(CFD)in the twin-skeg river–sea vessel ESD design and found the circumferential arrangement and number of stators to be important factors in the design process.
文摘In this paper,the effects of loom speed fluctuation on the mean speed and on the power ofdriving motor were investigated and the expressions for these effects were derived.Based on theenergy relationships,a new index of equivalent fluctuation was introduced,the connection be-tween this equivalent fluctuation and the energy of speed function on frequency domain was thenfound.In addition to the above theme,the residual kinetic energy of the shuttle and pickingmechanism,taken as a considerable part in the potentiality of loom energy-saving was also ana-lysed.According to the results of theoretical analyses,the ways of energy-saving in looms weresuggested.Finally,taking the loom of 1511 type as a practical example,the potentiality ofenergy-saving was calculated.