The rapid economic development has promoted the construction of infrastructure,such as highways and water conservancy projects.The establishment of highways has facilitated people's lives and made the distance bet...The rapid economic development has promoted the construction of infrastructure,such as highways and water conservancy projects.The establishment of highways has facilitated people's lives and made the distance between regions shorter and shorter.However,the construction of highway engineering is a big project,which not only has a long cycle,but also has a high economic cost.During the construction process,a large number of construction materials and personnel will be applied.If the project cost management is not implemented for the highway construction,it will easily affect the final quality and profit of the entire project.This article expounds the significance of dynamic management and control of highway engineering cost,and analyzes the strategy of dynamic management and control of highway engineering cost.展开更多
With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the c...With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the cost control of construction projects can be greatly improved[1].The use of this technology can not only reduce the project approval time but also improve the quality of the project.In addition,it can also help the construction personnel to solve the project changes,maintenance costs,insurance rates,and other related issues,so that the operation of the project is more efficient and economical.This paper will discuss the role of BIM technology in depth,and explore the advantages and disadvantages of each link through the research of the project,to provide a reference for the promotion of this new project.By constantly adjusting the application strategy,the goal is to meet the current market demand.展开更多
With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into th...With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into the stage of rapid development. The construction of water conserv ancy & hydropower engineering promotes social and economic development, so in order to safeguard the benefits of the engineering, cost management shall be done well, which is also an important channel for companies engaging in water conservancy & hydropower engineering to obtain economic benefits. Based on this the paper firstly investigates the problems in water conserv ancy & hydropower engineering cost management and then brings up relevant solutions.展开更多
The eXtensible markup language (XML) is a kind of new meta language for replacing HTML and has many advantages. Traditional engineering documents have too many expression forms to be expediently managed and have no dy...The eXtensible markup language (XML) is a kind of new meta language for replacing HTML and has many advantages. Traditional engineering documents have too many expression forms to be expediently managed and have no dynamic correlation functions. This paper introduces a new method and uses XML to store and manage engineering documents to realize the format unity of engineering documents and their dynamic correlations.展开更多
Against the backdrop of rapid development in China’s construction and infrastructure sectors,discrepancies between project budgets and actual costs have become pronounced,manifesting in project overruns and suspensio...Against the backdrop of rapid development in China’s construction and infrastructure sectors,discrepancies between project budgets and actual costs have become pronounced,manifesting in project overruns and suspensions,posing significant challenges.To address inaccuracies in investment targets and operational complexities,this study focuses on a beam-bridge construction project in a district of Shijiazhuang city as a case study.Drawing upon historical analogs,the project employs a Work Breakdown Structure(WBS)to decompose the engineering works.Building on theories of Cost Significant(CS)and Whole Life Costing(WLC),the study constructs Cost Significant Items(CSIs)and develops a CNN-BiLSTM-Attention neural network for nonlinear prediction.By identifying significant cost drivers in engineering projects,this paper presents a streamlined cost estimation method that significantly reduces computational burdens,simplifies data collection processes,and optimizes data analysis and forecasting,thereby enhancing prediction accuracy.Finally,validation with real-world cost fluctuation data demonstrates minor errors,meeting predictive requirements across project execution phases.展开更多
The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The ma...The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The main body of the construction project needs to strengthen the management and control of funds.In this regard,this paper analyzes the importance of cost management in highway projects by clarifying and analyzing the current cost management status quo problems and causes.The highway engineering cost control strategy and implementation methods are summarized to provide references for improving the quality of highway engineering.展开更多
With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovo...With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.展开更多
Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction sta...Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction stage of a highway.The effective development of cost management in the construction phase of highway engineering under the list pricing model can avoid unnecessary waste and help control the cost of highway engineering.However,there are still some problems in the development of cost management in the construction phase of highway engineering,which will affect the role of the list-based pricing mode in cost management.This paper explores and analyzes the advantages of the list pricing model and the problems existing in the cost management of the highway engineering construction stage under the list pricing model,and proposes effective management strategies to improve cost management of the highway engineering construction stage.展开更多
To improve mesh quality for KIVA-3V a method has been developed for rapid mesh generation and dynamic mesh management with moving valves for internal combustion engines. Two phases are included in rapid mesh generatio...To improve mesh quality for KIVA-3V a method has been developed for rapid mesh generation and dynamic mesh management with moving valves for internal combustion engines. Two phases are included in rapid mesh generation: the initial mesh generation and the mesh pre-treatment. In the second step (pre-treatment), the connectivity of those cells is generated by a new algorithm added to the KIVA-3V code after the initial mesh generated. In dynamic mesh management phase, a new rezoning algorithm is developed and the basic principle is that the rezoning starts from the moving part. The movement of the adjustment is treated as an "earth quake wave" propagating to the surrounding vertexes. The amount of coordinate adjustment of the surrounding vertexes is determined by the movement of the epicenter and the distance between the vertexes and the "epicenter". Finally, a real IC engine mesh is generated and managed aceording to the new method. It gives a new theory and a new method for creating and managing the mesh in IC engine.展开更多
LCM (life cycle management) is a systematic approach, mindset and culture that considers economic, social, and environmental factors among other factors in the decision making process throughout various business or ...LCM (life cycle management) is a systematic approach, mindset and culture that considers economic, social, and environmental factors among other factors in the decision making process throughout various business or organizational decisions that affect both inputs and outputs of a product or service life cycle. It is a product, process, or activity management system aimed at minimizing environmental and socio-economic burdens associated with an organization's product or process during its entire life cycle and value chain. LCM's application is gaining wider acceptance both in the corporate and governmental organizations as an approach to reduce ecological footprints and to improve the sustainability of human activities. But where and how can it be used in agricultural engineering applications? This study highlights the potential areas of LCM application in agricultural and allied sectors and how it can be utilized. The study revealed that LCM tools such as design for environment and life cycle analysis can be used to evaluate the environmental impacts of-and to improve the products, equipment, and structures produced by biosystems engineers as well as the processes used to generate them.展开更多
Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. T...Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget.展开更多
In the social development,bidding agency plays an important part,providing services for the development of construction project bidding,and endows the development of construction project bidding with a diversified cha...In the social development,bidding agency plays an important part,providing services for the development of construction project bidding,and endows the development of construction project bidding with a diversified characteristic.The cost management of a construction project bidding stage has a dynamic characteristic.The bidding agency can provide bidding related business for the construction enterprises to ensure the quality and the effect of the bidding service,leading to the foundation for the sustainable development of the construction enterprises.This paper analyzes the deficiency in the bidding agency,and cost management in the bidding stage of the construction projects,as well provide some effective countermeasures or recommendation,to improve the value,and the role of the bidding agency in managing and controlling the construction project cost within the scope allowed by the law,and regulations,and also to ensure the comprehensive benefits of construction projects for the construction enterprise.展开更多
At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role...At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role and value in improving the ability of project management.Earned value method,which is an important way in the field of project management,enables whole project management to rise to a new height.The specific principle of earned value method will be elaborated by fully introducing the specific role of earned value method in engineering projects to provide a reference and basis for practitioners to improve their management ability.展开更多
One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e...One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.展开更多
Concerning the demands in networked collaborative innovative design, a knowledge-based collaborative design model is introduced the model of knowledge integration along with its relevant supporting techniques ...Concerning the demands in networked collaborative innovative design, a knowledge-based collaborative design model is introduced the model of knowledge integration along with its relevant supporting techniques are presented. After illustrating the general knowledge search paradigm, a kind of dynamic user model is proposed to improve knowledge search efficiency. At last a short introduction of the system’s implementation is described.展开更多
文摘The rapid economic development has promoted the construction of infrastructure,such as highways and water conservancy projects.The establishment of highways has facilitated people's lives and made the distance between regions shorter and shorter.However,the construction of highway engineering is a big project,which not only has a long cycle,but also has a high economic cost.During the construction process,a large number of construction materials and personnel will be applied.If the project cost management is not implemented for the highway construction,it will easily affect the final quality and profit of the entire project.This article expounds the significance of dynamic management and control of highway engineering cost,and analyzes the strategy of dynamic management and control of highway engineering cost.
文摘With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the cost control of construction projects can be greatly improved[1].The use of this technology can not only reduce the project approval time but also improve the quality of the project.In addition,it can also help the construction personnel to solve the project changes,maintenance costs,insurance rates,and other related issues,so that the operation of the project is more efficient and economical.This paper will discuss the role of BIM technology in depth,and explore the advantages and disadvantages of each link through the research of the project,to provide a reference for the promotion of this new project.By constantly adjusting the application strategy,the goal is to meet the current market demand.
文摘With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into the stage of rapid development. The construction of water conserv ancy & hydropower engineering promotes social and economic development, so in order to safeguard the benefits of the engineering, cost management shall be done well, which is also an important channel for companies engaging in water conservancy & hydropower engineering to obtain economic benefits. Based on this the paper firstly investigates the problems in water conserv ancy & hydropower engineering cost management and then brings up relevant solutions.
文摘The eXtensible markup language (XML) is a kind of new meta language for replacing HTML and has many advantages. Traditional engineering documents have too many expression forms to be expediently managed and have no dynamic correlation functions. This paper introduces a new method and uses XML to store and manage engineering documents to realize the format unity of engineering documents and their dynamic correlations.
文摘Against the backdrop of rapid development in China’s construction and infrastructure sectors,discrepancies between project budgets and actual costs have become pronounced,manifesting in project overruns and suspensions,posing significant challenges.To address inaccuracies in investment targets and operational complexities,this study focuses on a beam-bridge construction project in a district of Shijiazhuang city as a case study.Drawing upon historical analogs,the project employs a Work Breakdown Structure(WBS)to decompose the engineering works.Building on theories of Cost Significant(CS)and Whole Life Costing(WLC),the study constructs Cost Significant Items(CSIs)and develops a CNN-BiLSTM-Attention neural network for nonlinear prediction.By identifying significant cost drivers in engineering projects,this paper presents a streamlined cost estimation method that significantly reduces computational burdens,simplifies data collection processes,and optimizes data analysis and forecasting,thereby enhancing prediction accuracy.Finally,validation with real-world cost fluctuation data demonstrates minor errors,meeting predictive requirements across project execution phases.
文摘The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The main body of the construction project needs to strengthen the management and control of funds.In this regard,this paper analyzes the importance of cost management in highway projects by clarifying and analyzing the current cost management status quo problems and causes.The highway engineering cost control strategy and implementation methods are summarized to provide references for improving the quality of highway engineering.
文摘With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.
文摘Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction stage of a highway.The effective development of cost management in the construction phase of highway engineering under the list pricing model can avoid unnecessary waste and help control the cost of highway engineering.However,there are still some problems in the development of cost management in the construction phase of highway engineering,which will affect the role of the list-based pricing mode in cost management.This paper explores and analyzes the advantages of the list pricing model and the problems existing in the cost management of the highway engineering construction stage under the list pricing model,and proposes effective management strategies to improve cost management of the highway engineering construction stage.
基金Sponsored by the Ministerial Level Foundation (1003)Beijing Municipal Commission of Education Foundation (KM200710016013)
文摘To improve mesh quality for KIVA-3V a method has been developed for rapid mesh generation and dynamic mesh management with moving valves for internal combustion engines. Two phases are included in rapid mesh generation: the initial mesh generation and the mesh pre-treatment. In the second step (pre-treatment), the connectivity of those cells is generated by a new algorithm added to the KIVA-3V code after the initial mesh generated. In dynamic mesh management phase, a new rezoning algorithm is developed and the basic principle is that the rezoning starts from the moving part. The movement of the adjustment is treated as an "earth quake wave" propagating to the surrounding vertexes. The amount of coordinate adjustment of the surrounding vertexes is determined by the movement of the epicenter and the distance between the vertexes and the "epicenter". Finally, a real IC engine mesh is generated and managed aceording to the new method. It gives a new theory and a new method for creating and managing the mesh in IC engine.
文摘LCM (life cycle management) is a systematic approach, mindset and culture that considers economic, social, and environmental factors among other factors in the decision making process throughout various business or organizational decisions that affect both inputs and outputs of a product or service life cycle. It is a product, process, or activity management system aimed at minimizing environmental and socio-economic burdens associated with an organization's product or process during its entire life cycle and value chain. LCM's application is gaining wider acceptance both in the corporate and governmental organizations as an approach to reduce ecological footprints and to improve the sustainability of human activities. But where and how can it be used in agricultural engineering applications? This study highlights the potential areas of LCM application in agricultural and allied sectors and how it can be utilized. The study revealed that LCM tools such as design for environment and life cycle analysis can be used to evaluate the environmental impacts of-and to improve the products, equipment, and structures produced by biosystems engineers as well as the processes used to generate them.
文摘Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget.
文摘In the social development,bidding agency plays an important part,providing services for the development of construction project bidding,and endows the development of construction project bidding with a diversified characteristic.The cost management of a construction project bidding stage has a dynamic characteristic.The bidding agency can provide bidding related business for the construction enterprises to ensure the quality and the effect of the bidding service,leading to the foundation for the sustainable development of the construction enterprises.This paper analyzes the deficiency in the bidding agency,and cost management in the bidding stage of the construction projects,as well provide some effective countermeasures or recommendation,to improve the value,and the role of the bidding agency in managing and controlling the construction project cost within the scope allowed by the law,and regulations,and also to ensure the comprehensive benefits of construction projects for the construction enterprise.
文摘At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role and value in improving the ability of project management.Earned value method,which is an important way in the field of project management,enables whole project management to rise to a new height.The specific principle of earned value method will be elaborated by fully introducing the specific role of earned value method in engineering projects to provide a reference and basis for practitioners to improve their management ability.
文摘One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.
基金SupportedbyNationalHi-Tech Research and Development Program of China (Grants No.2001AA412180)
文摘Concerning the demands in networked collaborative innovative design, a knowledge-based collaborative design model is introduced the model of knowledge integration along with its relevant supporting techniques are presented. After illustrating the general knowledge search paradigm, a kind of dynamic user model is proposed to improve knowledge search efficiency. At last a short introduction of the system’s implementation is described.