A good quality Environmental Impact Statement (EIS) is key for the effectiveness of Environmental Impact Assessment (EIA) processes and consequently to the acceptability of projects subject to EIA. The international l...A good quality Environmental Impact Statement (EIS) is key for the effectiveness of Environmental Impact Assessment (EIA) processes and consequently to the acceptability of projects subject to EIA. The international literature has contributed to the understanding of the essential aspects to be verified regarding the quality of EIS, offering a wide spectrum of good practice examples related to the content of the studies. Even so, there is a need for empirical studies that allow the identification of specific aspects related to the context of application of the EIS, which could lead to the identification of opportunities to improve both the quality of the reports and also the effectiveness of EIA. Therefore, the present paper is focused on the quality review of a number of EIS submitted to the Brazilian Federal Environmental Agency (Ibama) to instruct the assessment of electric power transmission systems. Based on the application of the EIS quality review package as proposed by Lee and Colley (1992), the outcomes reveal opportunities for improving the scope of EIA, analysis of alternatives, prediction of magnitude and the assessment of impact significance. Finally, the development and/or adaptation of a similar tool for the systematic review of the quality of EIA reports is recommended.展开更多
Follow-up of environmental impacts is an integral part of the Environmental Impact Assessment (EIA) process, closely related to the effectiveness of the instrument. EIA follow-up has been receiving a lot of interest f...Follow-up of environmental impacts is an integral part of the Environmental Impact Assessment (EIA) process, closely related to the effectiveness of the instrument. EIA follow-up has been receiving a lot of interest from scientists and practitioners, though it is recognized as one of the weakest points of EIA systems globally. Also, EIA follow-up is influenced by the context, mainly in terms of the types of projects or activities and their related impacts on the environment. Therefore, the present paper is focused on the investigation of the follow-up stage applied to the activity of seismic survey coupled with offshore oil & gas exploitation in Brazil. Research was based on a qualitative approach that included document analysis and semi-structured interviews with analysts involved in EIA processes, and sought to generate evidence of effectiveness of the EIA follow-up as conducted by the Federal Environment Agency (Ibama) in order to situate the practice of follow-up in the broader context of international best practice principles. Based on the findings, it was concluded that, due to the peculiarities of offshore seismic survey, it is necessary to promote adaptations in the procedures for monitoring impacts in order to ensure proper alignment with the principles and conceptual foundations that guide EIA practice. Specifically, the timing of the execution of the activity imposes challenges for its integration into the “conventional” cycle that has guided the monitoring of the impacts in the EIA of projects.展开更多
Since 2015, a “reform storm” of Environmental Impact Assessment (EIA) opened up in China. This study tries to answer the question of whether these reforms improve the effectiveness of EIA. First, we elaborate on the...Since 2015, a “reform storm” of Environmental Impact Assessment (EIA) opened up in China. This study tries to answer the question of whether these reforms improve the effectiveness of EIA. First, we elaborate on the reforms along with three well-acknowledged components, including EIA legislation, administration, and process. Then, evaluate the reformed EIA system against revised Ahmad and Wood’s criteria. The results demonstrate that the revised laws and regulations are more stringent than the old versions. The EIA process is simplified, and its coordination with the pollutant discharge permit system is promoted. The interim and post-event supervision is currently more robust and the penalties are more severe than before. However, the hierarchical position of the Environmental Protection Law is not high enough and the coordination of different government departments is still challenging. In summary, despite the problems occurring at the initial phase of reforms, the effectiveness of the EIA system has largely been improved.展开更多
基于生命周期评价方法研究了矿渣-硫铝酸盐水泥生产过程的环境影响,采用敏感性分析方法探明了全球变暖潜值(global warming potential,GWP)及初级能源消耗(primary energy demand,PED)两种环境影响的主要来源,并分析了矿渣-硫铝酸盐水...基于生命周期评价方法研究了矿渣-硫铝酸盐水泥生产过程的环境影响,采用敏感性分析方法探明了全球变暖潜值(global warming potential,GWP)及初级能源消耗(primary energy demand,PED)两种环境影响的主要来源,并分析了矿渣-硫铝酸盐水泥相比硅酸盐水泥的碳减排效应。结果表明:在矿渣-硫铝酸盐水泥的生产中,熟料煅烧对GWP贡献最高,原料开采对PED贡献最高;敏感性分析显示石灰石用量与煅烧煤炭用量对GWP影响最大,而煤炭与生产过程电力使用对PED影响最大;与硅酸盐水泥相比,矿渣-硫铝酸盐水泥的GWP显著降低,PED略微减少;高矿渣掺量下矿渣-硫铝酸盐水泥力学性能的不足可能影响其应用前景。展开更多
文摘A good quality Environmental Impact Statement (EIS) is key for the effectiveness of Environmental Impact Assessment (EIA) processes and consequently to the acceptability of projects subject to EIA. The international literature has contributed to the understanding of the essential aspects to be verified regarding the quality of EIS, offering a wide spectrum of good practice examples related to the content of the studies. Even so, there is a need for empirical studies that allow the identification of specific aspects related to the context of application of the EIS, which could lead to the identification of opportunities to improve both the quality of the reports and also the effectiveness of EIA. Therefore, the present paper is focused on the quality review of a number of EIS submitted to the Brazilian Federal Environmental Agency (Ibama) to instruct the assessment of electric power transmission systems. Based on the application of the EIS quality review package as proposed by Lee and Colley (1992), the outcomes reveal opportunities for improving the scope of EIA, analysis of alternatives, prediction of magnitude and the assessment of impact significance. Finally, the development and/or adaptation of a similar tool for the systematic review of the quality of EIA reports is recommended.
文摘Follow-up of environmental impacts is an integral part of the Environmental Impact Assessment (EIA) process, closely related to the effectiveness of the instrument. EIA follow-up has been receiving a lot of interest from scientists and practitioners, though it is recognized as one of the weakest points of EIA systems globally. Also, EIA follow-up is influenced by the context, mainly in terms of the types of projects or activities and their related impacts on the environment. Therefore, the present paper is focused on the investigation of the follow-up stage applied to the activity of seismic survey coupled with offshore oil & gas exploitation in Brazil. Research was based on a qualitative approach that included document analysis and semi-structured interviews with analysts involved in EIA processes, and sought to generate evidence of effectiveness of the EIA follow-up as conducted by the Federal Environment Agency (Ibama) in order to situate the practice of follow-up in the broader context of international best practice principles. Based on the findings, it was concluded that, due to the peculiarities of offshore seismic survey, it is necessary to promote adaptations in the procedures for monitoring impacts in order to ensure proper alignment with the principles and conceptual foundations that guide EIA practice. Specifically, the timing of the execution of the activity imposes challenges for its integration into the “conventional” cycle that has guided the monitoring of the impacts in the EIA of projects.
文摘Since 2015, a “reform storm” of Environmental Impact Assessment (EIA) opened up in China. This study tries to answer the question of whether these reforms improve the effectiveness of EIA. First, we elaborate on the reforms along with three well-acknowledged components, including EIA legislation, administration, and process. Then, evaluate the reformed EIA system against revised Ahmad and Wood’s criteria. The results demonstrate that the revised laws and regulations are more stringent than the old versions. The EIA process is simplified, and its coordination with the pollutant discharge permit system is promoted. The interim and post-event supervision is currently more robust and the penalties are more severe than before. However, the hierarchical position of the Environmental Protection Law is not high enough and the coordination of different government departments is still challenging. In summary, despite the problems occurring at the initial phase of reforms, the effectiveness of the EIA system has largely been improved.
文摘基于生命周期评价方法研究了矿渣-硫铝酸盐水泥生产过程的环境影响,采用敏感性分析方法探明了全球变暖潜值(global warming potential,GWP)及初级能源消耗(primary energy demand,PED)两种环境影响的主要来源,并分析了矿渣-硫铝酸盐水泥相比硅酸盐水泥的碳减排效应。结果表明:在矿渣-硫铝酸盐水泥的生产中,熟料煅烧对GWP贡献最高,原料开采对PED贡献最高;敏感性分析显示石灰石用量与煅烧煤炭用量对GWP影响最大,而煤炭与生产过程电力使用对PED影响最大;与硅酸盐水泥相比,矿渣-硫铝酸盐水泥的GWP显著降低,PED略微减少;高矿渣掺量下矿渣-硫铝酸盐水泥力学性能的不足可能影响其应用前景。