Large deformation and failure mechanism analyses of Tangba high slope with a high-intensity and complex excavation process 被引量:2
1
作者 HOU Qi-dong WU Gao-jian +2 位作者 LI Hai-bo FAN Gang ZHOU Jia-wen 《Journal of Mountain Science》 SCIE CSCD 2019年第2期453-469,共17页
The Tangba high slope is mainly composed of coarse soils and supplies core wall materials for the construction of the Changheba dam. Since the filling intensity of the Changheba dam is high, the Tangba high slope suff... The Tangba high slope is mainly composed of coarse soils and supplies core wall materials for the construction of the Changheba dam. Since the filling intensity of the Changheba dam is high, the Tangba high slope suffers from a high-intensity excavation process, and reinforcement measures are usually not implemented immediately. Moreover, the distribution of useful materials is uneven and insufficient, and the mixing of different soil materials is necessary; thus, multiple simultaneous excavations and secondary excavation are inevitable. In the construction period from 2012 to 2016, large deformations occurred in this area, and one of the largest monitored horizontal deformations whose direction points to the opposite side of the valley even reached more than 8000 mm. According to field investigation, site monitoring and theoretical analysis, the large deformation in the Tangba high slope can be divided into two phases. In the first phase, the excavation construction breaks the original stress equilibrium state; in the second phase, the precipitation infiltration accelerates the deformation. Thus, the excavation construction and precipitation infiltration are the two major factors promoting the deformation, and the high-intensity and complex excavation process is the fundamental cause. Notably, rate of slope deformation significantly accelerated in rainy seasons due to precipitation infiltration; the rate also accelerated in early 2016 due to the high-intensity, complex excavation process. Comprehensively considering the above factors, timely and effective reinforcement measures are essential. 展开更多
关键词 Coarse soil slope LARGE deformation high-intensity and COMPLEX excavation Failure mechanism Reinforcement measures
下载PDF
Dynamic characteristics of high stressed red sandstone subjected to unloading and impact loads 被引量:12
2
作者 GONG Feng-qiang ZHONG Wen-hui +2 位作者 GAO Ming-zhong SI Xue-feng WU Wu-xing 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第2期596-610,共15页
In the process of deep projects excavation,deep rock often experiences a full stress process from high stress to unloading and then to impact disturbance failure.To study the dynamic characteristics of three-dimension... In the process of deep projects excavation,deep rock often experiences a full stress process from high stress to unloading and then to impact disturbance failure.To study the dynamic characteristics of three-dimensional high stressed red sandstone subjected to unloading and impact loads,impact compression tests were conducted on red sandstone under confining pressure unloading conditions using a modified split Hopkinson pressure bar.Impact disturbance tests of uniaxial pre-stressed rock were also conducted(without considering confining pressure unloading effect).The results demonstrate that the impact compression strength of red sandstone shows an obvious strain rate effect.With an approximately equal strain rate,the dynamic strength of red sandstone under confining unloading conditions is less than that in the uniaxial pre-stressed impact compression test.Confining pressure unloading produces a strength-weakening effect,and the dynamic strength weakening factor(DSWF)is also defined.The results also indicate that the strain rate of the rock and the incident energy change in a logarithmic relation.With similar incident energies,unloading results in a higher strain rate in pre-stressed rock.According to the experimental analysis,unloading does not affect the failure mode,but reduces the dynamic strength of pre-stressed rock.The influence of confining pressure unloading on the shear strength parameters(cohesion and friction angle)is discussed.Under the same external energy impact compression,prestressed rock subjected to unloading is more likely to be destroyed.Thus,the effect of unloading on the rock mechanical characteristics should be considered in deep rock project excavation design. 展开更多
关键词 deep rock excavation unloading unloading confining pressure three-dimensional high stress strengthweakening effect impact disturbance
下载PDF
Experimental study on instability mechanism and critical intensity of rainfall of high-steep rock slopes under unsaturated conditions 被引量:5
3
作者 Xiaoshuang Li Qihang Li +4 位作者 Yunmin Wang Wei Liu Di Hou Wenbo Zheng Xiong Zhang 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2023年第10期1243-1260,共18页
Two critical factors,namely intense precipitation and intricate excavation,can trigger rock mass disasters in mining operations.In this study,an indoor rainfall system was developed to precisely regulate the flow and ... Two critical factors,namely intense precipitation and intricate excavation,can trigger rock mass disasters in mining operations.In this study,an indoor rainfall system was developed to precisely regulate the flow and intensity of precipitation.A large-scale model experiment was conducted on a self-designed physical simulation experiment platform to investigate the failure and instability of high-steep rock slopes under unsaturated conditions.The real-time reproduction of the progressive failure process in high-steep rock slopes enabled the determination of the critical rainfall intensity and revealed the mechanism underlying slope instability.Experiment results indicated that rainfall may be the primary factor contributing to rock mass instability,while continuous pillar mining exacerbates the extent of rock mass failure.The critical failure stage of high-steep rock slopes occurs at a rainfall intensity of 40 mm/h,whereas a rainfall exceeding 50 mm can induce critical instability and precipitation reaching up to 60 mm will result in slope failure.The improved region growing segmentation method(IRGSM)was subsequently employed for image recognition of rock mass deformation in underground mines.Herein an error comparison with the simple linear iterative cluster(SLIC)superpixel method and the original region growing segmentation method(ORGSM)showed that the average identification error in the X and Y directions by the method was reduced significantly(1.82%and 1.80%in IRGSM;4.70%and 6.26%in SLIC;9.45%and 12.40%in ORGSM).Ultimately,the relationship between rainfall intensity and failure probability was analyzed using the Monte Carlo method.Moreover,the stability assessment criteria of rock slope under unsaturated condition were quantitatively and accurately evaluated. 展开更多
关键词 Open-pit to underground mining Rock slope Rainfall infiltration excavation unloading Similar physical model Image recognition
下载PDF
Deformation Monitoring and Result Analysis on the High Excavated Slopes of TGP's Permanent Shiplock
4
作者 PEI Zhuo-yanSenior Engineer, Vice-chief Engincer, Changjiang Reconnaissance Technology Research Institute, Wuhan 430010, China ZHAO Quan-linProfessor-Senior Engineer, Comprehensive Reconnaissance Bureau, Changjiang Water Resources Commission, Wuhan 430010, China ZHU Li-ruProfessor-Senior Engineer, Comprehensive Reconnaissance Bureau, Changjiang Water Resources Commission, Wuhan 430010, China 《人民长江》 北大核心 2002年第S1期13-17,共5页
To ensure the stability of the high rock slopes of the permanent shiplock of the Three Gorges Project is the key to the successful construction and normal operation of the shiplock. In the course of the slope excavati... To ensure the stability of the high rock slopes of the permanent shiplock of the Three Gorges Project is the key to the successful construction and normal operation of the shiplock. In the course of the slope excavation, effective deformation monitoring, well understanding of the deformation characteristics, and reasonable analyzing and predicting of the deformation trend of the high slopes are important aspects of work for the slope excavation and dynamic design of the shiplock. The optimized design, successful implementation of deformation monitoring and accurate monitoring results are the important guarantee for carrying out the project. The monitoring design of the permanent shiplock was conducted in accordance with the general principles of "laying stress on the key points, considering parts as well as the whole, planning uniformly and conducting in stages". The deformation monitoring system of the permanent shiplocks is composed of survey network for horizontal and vertical displacements, monitoring points, inverted plumb lines, tension wires, extensimeters, etc. 展开更多
关键词 high excavated slope deformation ANALYSIS RESULT ANALYSIS PERMANENT shiplock TGP
下载PDF
Influence of excavation schemes on slope stability: A DEM study 被引量:9
5
作者 WANG Zhen-yu GU Dong-ming ZHANG Wen-gang 《Journal of Mountain Science》 SCIE CSCD 2020年第6期1509-1522,共14页
Slope failure due to improper excavation is one of common engineering disasters in China.To explore the failure mechanism of soil slope induced by toe excavation,especially to investigate the influence of excavation u... Slope failure due to improper excavation is one of common engineering disasters in China.To explore the failure mechanism of soil slope induced by toe excavation,especially to investigate the influence of excavation unloading path and rate on slope stability,a numerical slope model was built via particle flow code PFC2 D.The development of crack and strain during excavation were obtained and used to evaluate the deformation characteristics.Furthermore,excavation types representing different unloading paths and rates were compared in terms of crack number and strain level.Results indicate that crack number and strain level induced by horizontal column excavation are much greater than those of vertical column excavation and oblique excavation.The crack number and strain level increase with excavation unloading rate.Besides,the feasibility of taking the average strain of slope surface and the average value of maximum strain along monitoring lines to represent the global deformation characteristics were discussed.This study can provide a theoretical guidance for slope monitoring and preliminary optimal selection of excavation scheme in the design and construction of slope engineering. 展开更多
关键词 slope toe excavation unloading path unloading rate Strain distribution slope stability Discrete element method
下载PDF
高渗压与循环加卸载环境下开挖卸荷岩体力学特性试验研究 被引量:1
6
作者 陈兴周 白亚妮 +3 位作者 陈莉丽 马彬 王文瑞 龚盛 《岩土工程学报》 EI CAS CSCD 北大核心 2024年第4期737-745,共9页
探究高渗压与循环加卸载环境下深部开挖卸荷岩体力学特性的演化规律,有助于揭示复合荷载作用下工程开挖卸荷围岩的变形破坏机理。从区分开挖扰动强度与渗压量级入手,以高渗压环境下遭受开挖扰动的卸荷岩体为对象,开展了考虑特定孔压与... 探究高渗压与循环加卸载环境下深部开挖卸荷岩体力学特性的演化规律,有助于揭示复合荷载作用下工程开挖卸荷围岩的变形破坏机理。从区分开挖扰动强度与渗压量级入手,以高渗压环境下遭受开挖扰动的卸荷岩体为对象,开展了考虑特定孔压与循环荷载复合作用条件下的三轴加卸载试验。结果表明:(1)卸荷量级直接影响循环加卸载过程岩样的变形规律及其破坏强度,孔隙水压促进了岩样循环加卸载过程的拉剪破坏;(2)孔压增幅加剧了同量级卸荷岩样循环加卸载过程的延性变形及强度衰减,且卸荷岩样的轴向、环向与体积变形曲线均在2MPa孔压时产生波动;(3)伴随孔压增加,岩样卸荷量级为30%时的环向变形呈先增加后减小的趋势,而岩样卸荷量级为60%时的环向变形呈现先减小后增加的规律;(4)伴随卸荷量级与孔压增加,岩样破坏时端部裂隙的倾角逐渐增大,沿岩样轴向产生的拉剪破裂面愈加凸显。 展开更多
关键词 深部岩体 开挖卸荷 高渗压 循环加卸载 力学特性
下载PDF
公路改扩建高边坡既有锚杆受力特性离心试验 被引量:1
7
作者 冯忠居 王伟 +2 位作者 江冠 王富春 赵瑞欣 《长江科学院院报》 CSCD 北大核心 2024年第7期110-117,125,共9页
为研究改扩建边坡二次开挖下既有锚杆的受力特性及边坡稳定性,基于自主研发的模型试验锚杆角度支护装置,采用离心试验研究了锚固角度分别为10°、20°、30°、45°、60°及锚杆横向密度分别为1根/(18 cm)、1根/(12 ... 为研究改扩建边坡二次开挖下既有锚杆的受力特性及边坡稳定性,基于自主研发的模型试验锚杆角度支护装置,采用离心试验研究了锚固角度分别为10°、20°、30°、45°、60°及锚杆横向密度分别为1根/(18 cm)、1根/(12 cm)下顺层岩质高边坡开挖全过程中坡顶水平位移、锚杆轴力及坡内土压力变化规律。结果表明:相同锚固角度下,随着边坡开挖卸荷,坡顶累计水平位移非线性增加,且开挖坡顶增幅较开挖坡中大;锚杆轴力呈单峰分布,在开挖坡顶及坡脚时轴力增幅较大,轴力峰值靠近软弱面且随开挖卸荷先减小后增大,开挖后轴力峰值仍为开挖前的61%以上;随锚固角度的增加,坡顶水平位移先减小后增大,坡内土压力先增大后减小,即存在最佳锚固角度;建议边坡开挖宜采用分级开挖,并在开挖坡顶及坡脚时适当降低速率,综合考虑边坡坡度、岩层及软弱面倾角等因素,合理设计锚固角度。研究成果有助于工程技术人员在改扩建边坡二次开挖工程中选择合适的支护措施。 展开更多
关键词 高边坡 既有锚杆 二次开挖 离心试验 锚固角度 锚杆横向密度
下载PDF
复杂堆积体区导向井开挖及强卸荷裂隙高陡岸坡综合处治研究
8
作者 冯玉涛 王伟桥 +3 位作者 张景伟 刘宪庆 徐浩娟 吴红刚 《灾害学》 CSCD 北大核心 2024年第4期88-94,共7页
万州长江公路大桥因三峡蓄水需增设防船撞设施。作为防撞设施关键环节的3#导向井地处长江陡崖下部的堆积体岸滩上,受库水消落、江岸强烈卸荷和库岸再造等影响,导向井处堆积体开挖支护困难、背侧70 m高陡岸坡崩塌风险大。为保障导向井施... 万州长江公路大桥因三峡蓄水需增设防船撞设施。作为防撞设施关键环节的3#导向井地处长江陡崖下部的堆积体岸滩上,受库水消落、江岸强烈卸荷和库岸再造等影响,导向井处堆积体开挖支护困难、背侧70 m高陡岸坡崩塌风险大。为保障导向井施工以及防撞设施和航道的运营安全,根据项目区地形地质和构造水文特点,采用FLAC 3D有限元法对3#导向井开挖所形成的高陡岸坡稳定性进行了模拟分析,结果表明:开挖和暴雨工况下,岸坡处于欠稳定状态,存在较大的失稳风险,且在砂岩、泥岩和裂隙I交界处,存在明显的剪应力集中现象。根据仿真结果,制定了锚索地梁联合坡面喷射封闭的岸坡支护方案;比选了导向井处孤石群堆积体加固和卸荷方案,结合库水位消落和工期计划,采用了孤石群破碎清除和刷方膜袋混凝土防护方案,保证了3#导向井的安全建设。 展开更多
关键词 复杂堆积体 崩塌孤石 卸荷裂隙 高陡岸坡 综合处治
下载PDF
库岸边坡开挖卸荷后稳定性评价
9
作者 杨永恒 毛振凯 +2 位作者 韩鹏辉 苏振坤 陈兴周 《西北水电》 2024年第3期42-47,共6页
以西部某水电站工程边坡为研究对象,基于卸荷岩体力学理论,采用数值模拟方法,构建了考虑断层的库岸边坡模型,对不同工况进行模拟分析,综合计算所得的应力、变形和塑性区分布,对边坡的整体稳定做出评价。结果表明:边坡在蓄水叠加地震工... 以西部某水电站工程边坡为研究对象,基于卸荷岩体力学理论,采用数值模拟方法,构建了考虑断层的库岸边坡模型,对不同工况进行模拟分析,综合计算所得的应力、变形和塑性区分布,对边坡的整体稳定做出评价。结果表明:边坡在蓄水叠加地震工况下最不稳定,地震工况第三主应力拉应力值最大,为1.324 MPa;蓄水和开挖使边坡岩体参数劣化,对塑性区范围影响较大;地震作用对塑性区深度影响较大,且塑性区易沿着较弱材料的展布方向扩展,蓄水和开挖对岩体产生的劣化作用放大了坡体对地震作用的响应;最不利工况中塑性区面积较开挖工况增大了2.2倍;强度折减法计算出的贯通面主要分布在断层内部、断层与断层之间岩体、断层与坡脚及坡顶之间岩体;开挖清除部分强风化层,提高了坡体的稳定性,蓄水叠加地震工况下稳定性系数最低,为1.59。 展开更多
关键词 边坡工程 开挖卸荷 稳定性评价 数值模拟 强度折减
下载PDF
临岩堆边坡填方高速公路稳定性评价研究
10
作者 黄官平 王晓飞 《科学技术创新》 2024年第4期90-93,共4页
西南地区地质条件较差,广泛存在松散岩堆边坡,天然岩堆呈极限平衡状态,具有潜在失稳风险。在岩堆边坡新建填路,在外力作用下岩堆边坡极限平衡打破,填方道路可能出现失稳,填方边坡薄弱面发生局部或整体滑动,威胁高速公路工程建设。本文... 西南地区地质条件较差,广泛存在松散岩堆边坡,天然岩堆呈极限平衡状态,具有潜在失稳风险。在岩堆边坡新建填路,在外力作用下岩堆边坡极限平衡打破,填方道路可能出现失稳,填方边坡薄弱面发生局部或整体滑动,威胁高速公路工程建设。本文以云南岩堆边坡填方高速公路为典型实例,通过收集资料岩堆内部沉积结构特征,反演分析岩堆边坡稳定状态和参数,进一步分析运用数值模拟分析得到填方道路稳定性与变形破坏之间的关系,验证了加固岩堆边坡填方道路稳定特性,证明施工方案的可靠性。 展开更多
关键词 岩堆边坡 高速填方 开挖施工 地震饱水
下载PDF
开挖扰动影响下露天矿边坡变形规律研究
11
作者 费晓欧 缪海宾 《煤矿安全》 CAS 北大核心 2024年第8期153-158,共6页
为了探寻开挖扰动作用下露天矿边坡受断层破碎带影响的变形变化规律,综合考虑地层岩性、断层、开挖卸荷等因素的影响,基于相似理论建立了某露天矿边坡开挖物理模型,开展了不同开挖条件下物理模型的相似模拟实验。结果表明:岩体开挖会导... 为了探寻开挖扰动作用下露天矿边坡受断层破碎带影响的变形变化规律,综合考虑地层岩性、断层、开挖卸荷等因素的影响,基于相似理论建立了某露天矿边坡开挖物理模型,开展了不同开挖条件下物理模型的相似模拟实验。结果表明:岩体开挖会导致岩体应力重新分布,近坡面应力变化较大;开挖作用下位于断层构造带范围内的岩体表现出非整体移动,下盘岩体的垂直位移量较上盘岩体大,说明该处岩体在开挖扰动及上盘岩体自重力作用下有沿断层破碎带产生相对错动的趋势。 展开更多
关键词 边坡稳定性 开挖卸荷 坡体变形 滑坡 相似模拟
下载PDF
降雨作用下缓倾堆积层滑坡失稳机制与工程效果评价
12
作者 周文皎 徐勇 +1 位作者 李知军 范家玮 《公路交通科技》 CAS CSCD 北大核心 2024年第8期86-95,共10页
滑坡灾变机理模式与整治工程对策模型的针对性研究较少。以滇西北地区某高速公路滑坡为对象,采用宏观迹象调查、滑坡现状稳定性评价、滑带强度指标反算与数值分析计算相结合的方法对路堑边坡开挖诱发滑坡的灾变全过程进行了系统研究,分... 滑坡灾变机理模式与整治工程对策模型的针对性研究较少。以滇西北地区某高速公路滑坡为对象,采用宏观迹象调查、滑坡现状稳定性评价、滑带强度指标反算与数值分析计算相结合的方法对路堑边坡开挖诱发滑坡的灾变全过程进行了系统研究,分析了该边坡滑坡的灾变机理并评价了其整治工程效果。结果表明:受路堑边坡施工开挖卸荷影响,坡体应力场发生调整,坡体中上部浅表层与路基下部土岩界面处出现应力松弛现象,坡脚局部出现应力集中现象,并逐步扩大形成塑性区,最终形成了浅表层贯通松弛区和沿土岩界面的潜在滑裂面;受持续强降雨作用,地表水下渗坡体,土体含水量增加,土岩界面岩土体软化、强度降低,边坡浅表层应力松弛区与潜在滑裂面发生屈服变形,并不断向上和向下发展直至贯通,导致路堑边坡滑坡;滑坡整治工程采用多级刷方卸载、锚索框架梁、锚索抗滑桩和截排水沟等综合治理措施;整治工程实施后坡体处于稳定状态,满足规范要求,效果良好;滑坡病害演化与整治工程历经起始、路堑开挖、变形破坏、工程整治4个主要工程阶段,对比各阶段稳定性计算结果与宏观迹象调查结果,稳定性计算结果与滑坡各阶段变形、整治效果相符。 展开更多
关键词 道路工程 滑坡灾变机理 数值分析 边坡卸荷 路堑开挖
下载PDF
沁樊公路K3滑坡稳定性分析及整治措施研究
13
作者 张雄伟 赖国泉 庞伟军 《科技创新与应用》 2024年第3期140-144,共5页
以山西省沁水县境内沁樊公路K3滑坡为例,在现场地质调绘、勘察和地表变形监测的基础上,分析该滑坡产生的工程地质条件及灾害发育特征,评价其在不同工况下的稳定性,并提出治理措施。结果表明,该滑坡是由路堑开挖卸荷且连续降雨影响下老... 以山西省沁水县境内沁樊公路K3滑坡为例,在现场地质调绘、勘察和地表变形监测的基础上,分析该滑坡产生的工程地质条件及灾害发育特征,评价其在不同工况下的稳定性,并提出治理措施。结果表明,该滑坡是由路堑开挖卸荷且连续降雨影响下老滑坡前部复活形成。滑面埋深14.5~18.5m,滑体成分以粉质黏土、块碎石土为主,属牵引式滑坡,目前堑坡已发生滑动变形,整体处于欠稳定-不稳定状态。针对该滑坡特点,提出支挡与排水并重的治理理念,具体采用桩板墙支挡,坡脚设仰斜排水孔疏排地下水,辅以坡脚挡墙、坡面防护及地表截排水措施。工程实施后,彻底根治该滑坡,可为老滑坡地段的公路开挖提供借鉴和参考。 展开更多
关键词 路堑边坡 开挖卸荷 连续降雨 稳定性 整治措施
下载PDF
岩质边坡卸荷条件下变形破坏演化研究
14
作者 田志鹏 《露天采矿技术》 CAS 2024年第4期15-19,共5页
为探究不同高度边坡在开挖卸荷条件下的变形破坏规律,以将军戈壁一号露天矿地质条件为例,采用钻孔窥视与位移监测分析了开挖卸荷作用下的裂隙扩展与滑移变形特征;运用相似模拟底摩擦试验探究了200 m与400 m岩质边坡的变形破坏规律,对开... 为探究不同高度边坡在开挖卸荷条件下的变形破坏规律,以将军戈壁一号露天矿地质条件为例,采用钻孔窥视与位移监测分析了开挖卸荷作用下的裂隙扩展与滑移变形特征;运用相似模拟底摩擦试验探究了200 m与400 m岩质边坡的变形破坏规律,对开挖卸压条件下的裂隙发育与水平位移演化规律进行分析。结果表明:200 m岩质边坡卸压后在重力的下压作用下引发拉裂隙,外侧边坡体的牵引作用下诱发裂隙延展,裂隙贯通后形成滑移破坏,裂隙破坏形式主要以拉剪复合破坏类型的压致开裂为主;400 m边坡变形破坏分为上下2个部分,上部的变形破坏趋势与200 m边坡相同,下部的变形主要以卸压松弛导致的裂隙为主,在上方坡体的推移牵引作用下形成滑移破坏,裂隙破坏形式主要以松弛拉裂类型的压致开裂为主。 展开更多
关键词 岩质边坡 边坡变形 开挖卸荷 相似模拟 边坡稳定性 位移监测
下载PDF
复杂堆积层边坡开挖变形机理及加固效果评价
15
作者 涂新斌 王彦兵 +5 位作者 杨相斌 牛彦博 袁明生 高献 林少远 陈熙隆 《岩土工程技术》 2024年第2期169-174,共6页
针对某电力工程换流站高挖方边坡,分别采用极限平衡法和强度折减法对边坡的稳定性和变形特征进行分析。分析结果表明,边坡的稳定性受降雨和地震作用影响显著,两种工况下边坡均处于不稳定状态,地震作用对斜坡地带堆积体结构形成损伤,不... 针对某电力工程换流站高挖方边坡,分别采用极限平衡法和强度折减法对边坡的稳定性和变形特征进行分析。分析结果表明,边坡的稳定性受降雨和地震作用影响显著,两种工况下边坡均处于不稳定状态,地震作用对斜坡地带堆积体结构形成损伤,不但使边坡整体稳定性下降,还促使坡体内裂隙大量发育,利于降雨入渗,进一步恶化边坡的水文地质条件,导致坡体孔隙水压力增加、有效应力降低。边坡加固设计采用桩板墙+坡面格构锚杆支护措施,加固后边坡稳定性系数达到1.406,最大总位移由加固前的425 mm降至9 mm,大幅提高边坡稳定性,表明防护方案能保障边坡安全性,达到防治和风险管控的目的。 展开更多
关键词 堆积体滑坡 高挖方边坡 边坡稳定性 强度折减法 数值模拟
下载PDF
钢筋混凝土扶壁卸荷板组合挡土墙卸荷效应研究
16
作者 杨淼 董建勋 +1 位作者 肖胜寒 郭昊 《混凝土》 CAS 北大核心 2024年第3期182-187,共6页
为了解决高填方边坡挡土结构内力大和工程成本高等难题,提出钢筋混凝土扶壁+卸荷板组合挡土墙形式,利用卸荷板的卸荷效应,降低墙后土压力,减小结构内力。将库伦滑动楔体理论和Klein方法结合,给出组合挡土墙土压力计算方法和挡土墙理论... 为了解决高填方边坡挡土结构内力大和工程成本高等难题,提出钢筋混凝土扶壁+卸荷板组合挡土墙形式,利用卸荷板的卸荷效应,降低墙后土压力,减小结构内力。将库伦滑动楔体理论和Klein方法结合,给出组合挡土墙土压力计算方法和挡土墙理论计算方法。针对大连20.5 m高填方边坡工程,采用组合挡土墙方案及理论计算方法,并研究组合挡土墙卸荷效应影响因素。结果表明:组合挡土墙结构剪力和弯矩的最大值均比扶壁式挡土墙的小将近1/3;现场监测结果与理论计算结果比较接近;影响组合挡土墙卸荷效应的因素主要是卸荷板埋置深度和卸荷板长度;从结构剪力及弯矩均衡的角度考虑,卸荷板最优设置方案为,卸荷板埋置深度为挡土墙高度的中间位置,卸荷板长度与其对应的挡墙段高度比值为1.2~1.5。 展开更多
关键词 钢筋混凝土扶壁+卸荷板组合挡土墙 卸荷板 卸荷效应 高填方边坡 土压力分布
下载PDF
左江山秀船闸扩能工程高边坡开挖施工技术
17
作者 魏皛 宋根才 《水运工程》 2024年第5期220-225,236,共7页
以广西左江山秀船闸扩能工程为例,研究引航道高边坡施工开挖与支护施工技术。结合施工现场实际与引航道高边坡的特征,制定了高边坡施工的开挖和支护方法,以确保工程的安全性和可行性。研究结果表明,在左江山秀船闸扩能工程中采用该方法... 以广西左江山秀船闸扩能工程为例,研究引航道高边坡施工开挖与支护施工技术。结合施工现场实际与引航道高边坡的特征,制定了高边坡施工的开挖和支护方法,以确保工程的安全性和可行性。研究结果表明,在左江山秀船闸扩能工程中采用该方法进行施工,两岸边坡的稳定性问题得到解决,确保了施工的安全进行,同时保障了既有航道的正常通航。 展开更多
关键词 船闸扩能工程 高边坡开挖 控制爆破 液压破碎 高边坡支护
下载PDF
复杂地质条件下高边坡开挖及防护措施综合应用——以密云水库第一溢洪道改建工程为例
18
作者 陈闯 张冰 陈铎 《中国水能及电气化》 2024年第2期62-66,共5页
密云水库是一座以防洪、供水为主,综合利用的大型水利工程。第一溢洪道是密云水库主要的泄洪建筑物,两侧为陡峭山体,破碎带较多,地质情况复杂,工程开挖最高高度达50m,在改建工程中边坡开挖与支护施工难度大。在工程典型部位进行了试验... 密云水库是一座以防洪、供水为主,综合利用的大型水利工程。第一溢洪道是密云水库主要的泄洪建筑物,两侧为陡峭山体,破碎带较多,地质情况复杂,工程开挖最高高度达50m,在改建工程中边坡开挖与支护施工难度大。在工程典型部位进行了试验性开挖和支护施工,高边坡分级开挖,分级支护,采用静态破碎和机械相结合方式开挖边坡,对于不同地质条件选取最优支护措施。目前,溢洪道边坡部分竣工已3年,巡视检查及仪器监测显示边坡运行状况良好。该施工方式保证了施工期和运行期工程安全,可为今后类似溢洪道工程施工提供参考。 展开更多
关键词 溢洪道 高边坡 开挖 支护
下载PDF
水利工程中高边坡开挖与支护工程的施工要点
19
作者 张学峰 《建筑与装饰》 2024年第5期166-168,共3页
高边坡施工是水利工程的重要组成部分,如果开挖施工管控不当,很容易产生边坡沉降等问题,严重影响边坡承载力,为了提高水利工程的稳定性,必须高度重视开挖支护问题。本文针对某水库左岸高边坡开挖支护进行详细分析,从理论实践双重角度探... 高边坡施工是水利工程的重要组成部分,如果开挖施工管控不当,很容易产生边坡沉降等问题,严重影响边坡承载力,为了提高水利工程的稳定性,必须高度重视开挖支护问题。本文针对某水库左岸高边坡开挖支护进行详细分析,从理论实践双重角度探讨高边坡施工当中存在的各项技术难点,例如边坡超欠挖、模板安装等进行详细梳理,以供其他工程参考。 展开更多
关键词 水利工程 高边坡 支护 开挖技术
下载PDF
旭龙水电站石料场高陡边坡分级开挖模拟
20
作者 陈曦 喻文振 +3 位作者 彭春林 熊新宇 何为 罗立哲 《水利水电快报》 2024年第5期66-71,共6页
金沙江旭龙水电站徐龙石料场开采高度高达280 m,距大坝等重要水工建筑物较近,为分析在不同开挖步下,该料场高陡岩质边坡的变形及稳定性特征,建立了料场分级开挖有限元模型。结果表明:①徐龙料场开采过程中边坡变形较大区域由原坡脚向开... 金沙江旭龙水电站徐龙石料场开采高度高达280 m,距大坝等重要水工建筑物较近,为分析在不同开挖步下,该料场高陡岩质边坡的变形及稳定性特征,建立了料场分级开挖有限元模型。结果表明:①徐龙料场开采过程中边坡变形较大区域由原坡脚向开挖新形成的坡脚不断变化;②随着开挖的进行,徐龙石料场最大主应变较大区域发生“分岔”,最不利滑动圆弧由原边坡坡脚逐渐移动至开挖新形成的坡脚处;③不同开挖步下的徐龙石料场整体稳定性满足要求。研究成果可以为类似的石料场边坡分级开挖稳定性分析提供参考。 展开更多
关键词 石料场 高陡岩质边坡 分级开挖 旭龙水电站