Burial depth is a crucial factor affecting the forces and deformation of tunnels during earthquakes.One key issue is a lack of understanding of the effect of a change in the buried depth of a single-side tunnel on the...Burial depth is a crucial factor affecting the forces and deformation of tunnels during earthquakes.One key issue is a lack of understanding of the effect of a change in the buried depth of a single-side tunnel on the seismic response of a double-tunnel system.In this study,shaking table tests were designed and performed based on a tunnel under construction in Dalian,China.Numerical models were established using the equivalent linear method combined with ABAQUS finite element software to analyze the seismic response of the interacting system.The results showed that the amplification coefficient of the soil acceleration did not change evidently with the burial depth of the new tunnel but decreased as the seismic amplitude increased.In addition,the existing tunnel acceleration,earth pressure,and internal force were hardly affected by the change in the burial depth;for the new tunnel,the acceleration and internal force decreased as the burial depth increased,while the earth pressure increased.This shows that the earth pressure distribution in a double-tunnel system is relatively complex and mainly concentrated on the arch spandrel and arch springing of the relative area.Overall,when the horizontal clearance between the center of the two tunnels was more than twice the sum of the radius of the outer edges of the two tunnels,the change in the burial depth of the new tunnel had little effect on the existing one,and the tunnel structure was deemed safe.These results provide a preliminary understanding and reference for the seismic performance of a double-tunnel system.展开更多
Purpose – This study aims to analyze the factors, evaluation techniques of the durability of existing railwayengineering.Design/methodology/approach – China has built a railway network of over 150,000 km. Ensuring t...Purpose – This study aims to analyze the factors, evaluation techniques of the durability of existing railwayengineering.Design/methodology/approach – China has built a railway network of over 150,000 km. Ensuring thesafety of the existing railway engineering is of great significance for maintaining normal railway operationorder. However, railway engineering is a strip structure that crosses multiple complex environments. Andrailway engineering will withstand high-frequency impact loads from trains. The above factors have led todifferences in the deterioration characteristics and maintenance strategies of railway engineering compared toconventional concrete structures. Therefore, it is very important to analyze the key factors that affect thedurability of railway structures and propose technologies for durability evaluation.Findings – The factors that affect the durability and reliability of railway engineering are mainly divided intothree categories: material factors, environmental factors and load factors. Among them, material factors alsoinclude influencing factors, such as raw materials, mix proportions and so on. Environmental factors varydepending on the service environment of railway engineering, and the durability and deterioration of concretehave different failure mechanisms. Load factors include static load and train dynamic load. The on-site rapiddetection methods for five common diseases in railway engineering are also proposed in this paper. Thesemethods can quickly evaluate the durability of existing railway engineering concrete.Originality/value – The research can provide some new evaluation techniques and methods for thedurability of existing railway engineering.展开更多
The energy-saving renovation of existing residential buildings is a crucial measure to achieve the strategic goal of energy conservation and emission reduction in China and build ecologically livable cities.This artic...The energy-saving renovation of existing residential buildings is a crucial measure to achieve the strategic goal of energy conservation and emission reduction in China and build ecologically livable cities.This article focuses on the perspective of subject behavior,starting from analyzing the current situation and difficulties of the operation of the energy-saving renovation market for existing residential buildings in China,drawing on the practical experience of the operation of the existing residential building energy-saving renovation market abroad.Based on principles such as systematicity,humanization,feasibility,and sustainability,the article constructs an operation optimization system of the existing residential building energy-saving renovation market from the perspective of subject behavior.In order to provide a reference for the healthy and orderly operation of the existing residential building energy-saving renovation market,this paper proposes implementation strategies for optimizing the operation of the existing residential building energy-saving renovation market.Suggestions are proposed from four aspects:optimizing the market environment,innovating the financing model,building the information sharing platform,and utilizing the synergies of the main subjects.展开更多
The long-term and effective implementation of the existing building energy efficiency renovation depends on the development of the existing building energy efficiency renovation market.The key to the development of th...The long-term and effective implementation of the existing building energy efficiency renovation depends on the development of the existing building energy efficiency renovation market.The key to the development of the existing building energy efficiency renovation market is the joint role of the market players.Starting with the analysis of the externalities and information asymmetry of the existing building energy efficiency renovation market,this paper analyzes the behavioral characteristics and influencing factors of the existing building energy efficiency renovation market entities(central government,local government,owners,energy conservation service enterprises,third-party evaluation institutions,and other market entities),and reveals the problems of the existing building energy efficiency renovation market,such as the absence of government,the lack of main power,and the lack of financing channels,Thus,it lays a platform foundation for the research on the behavior strategy and security system of the existing building energy-s aving renovation market.展开更多
The core of the healthy and orderly operation of the existing residential building energy-saving renovation market lies in the exploration of the implementation mechanism of multi-subject and multi-objective integrate...The core of the healthy and orderly operation of the existing residential building energy-saving renovation market lies in the exploration of the implementation mechanism of multi-subject and multi-objective integrated optimization.The multi-agent and multi-objective integrated optimization system framework is a powerful tool to guide the scientific decision-making of the market core structural entities in the future market practice. This paper analyzes the practical dilemma of energy-saving renovation of theexisting residential buildings in China, summarizes the practical experience of multi-subject and multi-objective integrated optimization of energy-saving renovation of the existing residential buildings in foreign countries, and puts forward beneficial practical enlightenment on the basis of comparison at home and abroad;The design principles of the target integrated optimization system have established a multi-subject and multi-objective integrated optimization system framework for the energy-saving renovation of the existing residential buildings, from six aspects: government guidance, trust consensus, value co-creation, risk sharing, revenue sharing, and social responsibility sharing. This paper proposes a multi-subject and multi-objective integrated practice strategy, in order to promote the efficient and orderly development of China's existing residential building energy-saving renovation market.展开更多
To shorten the existing box culvert demolition construction period and ensure the normal operation of the railway, the jacking-out construction method was adopted. The ABAQUS finite element software was used to establ...To shorten the existing box culvert demolition construction period and ensure the normal operation of the railway, the jacking-out construction method was adopted. The ABAQUS finite element software was used to establish a three-dimensional model of the box culvert and soil body of the relying project, and three excavation thickness (0m, 1 m, 2 m) were used as the main variation parameters for numerical analysis and research, and the change law of the box culvert itself and soil body stress during the culvert jacking out process was obtained. The results show that the jacking force-displacement curves of the three working conditions can be divided into two stages, and the jacking force reaches the maximum value at the moment when the static friction turns into sliding friction at the end of the first stage. The stress distribution at the bottom slab of the box culvert in the jacking process is approximately normal, and the stress decreases with the increase of the roadbed excavation thickness. The increase of the roadbed excavation thickness can reduce the soil pressure on the side of the box culvert and effectively reduce the deformation of the roadbed in the jacking-out process. The deformation of the roadbed during the jacking process can be reduced by increasing the thickness of the roadbed excavation.展开更多
Requirements for the quality of housing have been increasing in recent years.Many existing buildings can no longer meet the needs of residents due to functional,layout,and other issues,and need to be renovated.However...Requirements for the quality of housing have been increasing in recent years.Many existing buildings can no longer meet the needs of residents due to functional,layout,and other issues,and need to be renovated.However,traditional renovation methods have problems such as high pollution and high consumption.With the rapid development of prefabricated construction and green environmental protection concepts,the problems of traditional interior renovation can be resolved using prefabricated interior decoration.As a new and advanced method of renovation,prefabricated renovation reduces construction segments,workload,pollution,and waste,and it promotes the upgrading of the traditional renovation industry.展开更多
The bearing capacity testing and evaluation of the existing bridge engineering structure is not only the key to clarify its structural quality and safety performance,but it also can lay a solid foundation for subseque...The bearing capacity testing and evaluation of the existing bridge engineering structure is not only the key to clarify its structural quality and safety performance,but it also can lay a solid foundation for subsequent repairs and maintenance work.To ensure the bearing capacity,durability and reliability of existing bridges,this paper analyzes the importance and methods of testing and evaluation of structural bearing capacity of a bridge.This analysis aims to provide scientific reference for the quality assessment and subsequent repair and maintenance of existing bridge engineering structures.展开更多
Combined with current specifications and stress characteristics of concrete filled steel tubular (CFST) arch bridges, the determination principle of safe-middle-failure threestage mode is given. Accordingly, damage ...Combined with current specifications and stress characteristics of concrete filled steel tubular (CFST) arch bridges, the determination principle of safe-middle-failure threestage mode is given. Accordingly, damage probability and failure probability and the corresponding reliability indices are calculated; a direct relationship between reliability indices and three-stage working status is made. Based on the three-stage working mode, a combined FNM (finite element-neural network- Monte-Carlo simulation) method is put forward to estimate the reliability of existing bridges. According to time-dependent reliability theory, subsequent service time is divided into several stages; minimum samples required by the Monte-Carlo method are generated by random sampling; training samples are calculated by the finite element method, and the training samples are extended by the neural network; failure probability and damage probability are calculated by the Monte-Carlo method. Thus, time dependent reliability indices are obtained, and the working status is judged. A case study is investigated to estimate the reliability of an actual bridge by the FNM method. The bridge is a CFST arch bridge with an 83.6 m span and it has been in operation for 10 years. According to analysis results, in the tenth year, the example bridge is still in safe status. This conclusion is consistent with the facts, which proves the feasibility of the FNM method for estimating the reliability of existing bridges.展开更多
The existing state and partitioning of rare earth (RE) on weathered ores in Longnan County(LN), Xingfeng County(XF) and Ninghua County(NH) were characterized systematically by standard geological analytical me...The existing state and partitioning of rare earth (RE) on weathered ores in Longnan County(LN), Xingfeng County(XF) and Ninghua County(NH) were characterized systematically by standard geological analytical methods. It is found that RE in the weathered rare earth ores exist as four phases: (a) water soluble, (b) ion-exchangeable, (c) colloidal sediment (oxides), (d) minerals, in which mainly as ion exchangeable phase, accounting for nearly 80% of total RE, with about 20% in the form of colloid sediment phase and mineral phase, but very little as aqueous soluble phase. These rare earth partitioning were mainly chosen mid-heavy RE elements, occupying above 60%, but not equal in the four phases. The mid-heavy RE elements were primarily enriched in the ion exchangeable phase up to 40%, while the containment of cerium dioxide is below 2 %. The cerium deficiency occurs in the ion exchangeable phase in weathered ore. It results from that the Ce^3+ is oxidized into Ce^4+ and changes into CeO2. For LN ore, the containment of Y is high in weathered ore because Y-minerals are abundant in original rock.展开更多
Rare earth element(REE) is widely used in various fields of geology.Study of the existing forms of REE in geological objects is a necessity for us to solve geological problems related with REE.This paper tried to make...Rare earth element(REE) is widely used in various fields of geology.Study of the existing forms of REE in geological objects is a necessity for us to solve geological problems related with REE.This paper tried to make it clear the existing forms of REE in gold-bearing pyrite in Jinshan gold deposit by stepwise dissolution test with ICP-MS analysis.Results showed that content of REE in fluid-inclusions of gold-bearing pyrite was very low,which only took about 0.07%–0.70% of the ΣREE,and that of pyrite phase ...展开更多
The improvement of the seismic resilience of existing reinforced-concrete(RC) frame buildings, which is essential for the seismic resilience of a city, has become a critical issue. Although seismic isolation is an eff...The improvement of the seismic resilience of existing reinforced-concrete(RC) frame buildings, which is essential for the seismic resilience of a city, has become a critical issue. Although seismic isolation is an effective method for improving the resilient performance of such buildings, target-oriented quantitative improvements of the resilient performance of these buildings have been reported rarely. To address this gap, the seismic resilience of two existing RC frame buildings located in a high seismic intensity region of China were assessed based on the Chinese Standard for Seismic Resilience Assessment of Buildings. The critical engineering demand parameters(EDPs) affecting the seismic resilience of such buildings were identified. Subsequently, the seismic resilience of buildings retrofitted with different isolation schemes(i.e., yield ratios) were evaluated and compared, with emphasis on the relationships among yield ratios, EDPs, and levels of seismic resilience. Accordingly, to achieve the highest level of seismic resilience with respect to the Chinese standard, a yield ratio of 3% was recommended and successfully applied to the target-oriented design for the seismic-resilience improvement of an existing RC frame building. The research outcome can provide an important reference for the resilience-based retrofitting of existing RC frame buildings using seismic isolation in urban cities.展开更多
To relieve the increasing traffic load, many early built highways need to be widened or reconstructed. The rapid performance detection to existing subgrades is important to their reasonable evaluation and maximized ut...To relieve the increasing traffic load, many early built highways need to be widened or reconstructed. The rapid performance detection to existing subgrades is important to their reasonable evaluation and maximized utilization. Based on five kinds of soils taken from an existing highway in southern China, three commonly detecting methods were used to determine their moisture contents, compaction degrees and resilient moduli. The results showed that the measured moisture contents were greater than the design value, and the compaction degrees decreased sharply compared to the original ones. The moisture and heat exchange produced a decrease in the resilient modulus of plate loading test(PLT) from the standard 60 MPa down to 40 MPa. Afterwards, the portable falling weight deflectometer(PFWD) and dynamic cone penetrometer(DCP) were used to evaluate the subgrade performances. The measured PFWD moduli and the DCP penetration rates were correlated with the resilient moduli of PLT, deflections of the Beckman beam test, compaction degrees and moisture contents. The correlation analysis indicates that both of two methods are suitable in rapid detecting subgrade performances, but PFWD method is more recommended for it has higher accuracy and efficiency.展开更多
In order to investigate the existing form and action mechanism of minor scandium (Sc) and zirconium (Zr) in AI-Cu-Mg alloy, microstructures of Al-4Cu-1Mg-Sc-Zr alloy under different conditions, including states of...In order to investigate the existing form and action mechanism of minor scandium (Sc) and zirconium (Zr) in AI-Cu-Mg alloy, microstructures of Al-4Cu-1Mg-Sc-Zr alloy under different conditions, including states of as-cast, homogenized, hot-rolled, as-solution and natural aged, were observed by scanning electron microscopy (SEM), X-ray diffractometry (XRD) and transmission electron microscopy (TEM). It is revealed that Sc and Zr are completely dissolved into the supersaturated solid solution in as-cast ingot, but grain refinement is not observed. Coffee-bean-like AI3(Sc, Zr) particles deposit during homogenization of ingot induce an increase in hardness. Al3(Sc, Zr) particles are slightly coarsened in as-solution samples, but they still maintain coherent to matrix, which indicates a high thermal stability of these particles. Good coherency ofAl3(Sc, Zr) particles makes some benefits for inhibiting recrystallization and reserving work-hardening.展开更多
The basic element in any sustainable dam project is safety, which includes the following safety elements: O structural safety, dam safety monitoring, operational safety and maintenance, and emergency planning. Lon...The basic element in any sustainable dam project is safety, which includes the following safety elements: O structural safety, dam safety monitoring, operational safety and maintenance, and emergency planning. Long-term safety primarily includes the analysis of all hazards affecting the project; that is, hazards from the natural environment, hazards from the man-made environment, and project-specific and site-specific hazards. The special features of the seismic safety of dams are discussed. Large dams were the first structures to be systematically designed against earthquakes, starting in the 1930s. How- ever, the seismic safety of older dams is unknown, as most were designed using seismic design criteria and methods of dynamic analysis that are considered obsolete today. Therefore, we need to reevaluate the seismic safety of existing dams based on current state-of-the-art practices and rehabilitate deficient dams. For large dams, a site-specific seismic hazard analysis is usually recommended. Today, large dams and the safety-relevant elements used for controlling the reservoir after a strong earthquake must be able to withstand the ground motions of a safety evaluation earthquake. The ground motion parameters can be determined either by a probabilistic or a deterministic seismic hazard analysis. During strong earthquakes, inelastic deformations may occur in a dam; therefore, the seismic analysis has to be car- ried out in the time domain. Furthermore, earthquakes create multiple seismic hazards for dams such as ground shaking, fault movements, mass movements, and others. The ground motions needed by the dam engineer are not real earthquake ground motions but models of the ground motion, which allow the safe design of dams. It must also be kept in mind that darn safety evaluations must be carried out several times during the long life of large storage dams. These features are discussed in this paper.展开更多
Based on the engineering background of the contact channel between Shangyang and Gushan of Fuzhou Metro Line 2 undercrossing the existing tunnel line,the freezing temperature field of the contact channel,the displacem...Based on the engineering background of the contact channel between Shangyang and Gushan of Fuzhou Metro Line 2 undercrossing the existing tunnel line,the freezing temperature field of the contact channel,the displacement field of the existing tunnel line and the contact channel with different net distances and horizontal angles are analyzed by ANSYS finite element software and field measurement method.The obtained results indicate that during the freezing period,the temperature drops at different measuring holes are almost the same.The temperature near the bottom freezing tube drops faster than that far from the tube.It is found that the bilateral freezing technique improves the formation of the freezing wall in the intersection area.In this case,the intersection time of the cross-section is 7 days faster than that of the adjacent ordinary section.The change curve of the displacement of the surface uplift in different freezing periods with the distance from the center of the channel is“M”shaped.The maximum uplift displacement at 12 m from channel center is 25 mm.The vertical displacement of the measuring point located above the central axis of the connecting channel is large.The farther the point from the central axis,the smaller the corresponding vertical displacement.When the horizontal angle between the existing tunnel and the connecting channel is less than 60,the existing vertical displacement of the tunnel changes rapidly with the horizontal angle,reaching 0.17 mm/.Meanwhile,when the net distance is less than 6.1 m,the change rate of the vertical displacement of the tunnel is up to 2.4 mm/m.展开更多
Seismic hazard levels lower than those for design of new buildings have been permitted for seismic evaluation and retrofi t of existing buildings due to the relatively short remaining lifespans. The seismic hazard red...Seismic hazard levels lower than those for design of new buildings have been permitted for seismic evaluation and retrofi t of existing buildings due to the relatively short remaining lifespans. The seismic hazard reduction enables costeff ective seismic evaluation and retrofi t of existing buildings with limited structural capacity. The current study proposes seismic hazard reduction factors for Korea, one of low to moderate seismicity regions. The seismic hazard reduction factors are based on equal probabilities of non-exceedance within diff erent remaining building lifespans. A validation procedure is proposed to investigate equality of seismic risk in terms of ductility-based limit states using seismic fragility assessment of nonlinear SDOF systems, of which retrofi t demands are determined by the displacement coeffi cient method of ASCE 41-13 for diff erent target remaining building lifespans and corresponding reduced design earthquakes. Validation result shows that the use of seismic hazard reduction factors can be permitted in conjunction with appropriate lower bounds of the remaining building lifespans.展开更多
Chloride-induced corrosion of the reinforcement is considered as one of the major mechanisms resulting in the reduction of structural resistance of reinforced concrete structural elements located in marine and other a...Chloride-induced corrosion of the reinforcement is considered as one of the major mechanisms resulting in the reduction of structural resistance of reinforced concrete structural elements located in marine and other aggressive environments. A study of reinforced concrete structures located at the Fangcheng dock in the Beibu Gulf port, China, was present. The result from field survey indicates that the concrete cover depth and chloride diffusion coefficient fit best normal distribution and lognormal distribution, respectively. The service life of structure is about 55 a, while initiation time is 45 a. Sensitivity analysis indicates that the most influential factor of the structure service life prediction is concrete cover, followed by diffusion coefficient, diffusion decay index, critical chloride concentration, surface chloride concentration, current density and localized pitting corrosion. Finally, the effects of diffusion decay index and critical chloride concentration on structure service life prediction are discussed.展开更多
Water distribution network(WDN)leakage management has received increased attention in recent years.One of the most successful leakage-control strategies is to divide the network into District Metered Areas(DMAs).As a ...Water distribution network(WDN)leakage management has received increased attention in recent years.One of the most successful leakage-control strategies is to divide the network into District Metered Areas(DMAs).As a multi-staged technique,the generation of DMAs is a difficult task in design and implementation(i.e.,clustering,sectorization,and performance evaluation).Previous studies on DMAs implementation did not consider the potential use of existing valves in achieving the objective.In this work,a methodology is proposed for detecting clusters and reducing the cost of additional valves and DMA sectorization by considering existing valves as much as possible.The procedure of DMAs identification has been divided into three stages,i.e.,a)clusters identification;b)sectorization or boundaries optimization and c)performance evaluation of the partitioned network.The proposed methodology is evaluated on a simple network and a real-world water network with the findings provided and compared to the DMAs,established for a raw water network with no existing valves.It is found that there is an adequate difference in cost of strategy implementation in both the cases for the network under consideration and the existing valve system achieved better network performance in terms of resilience index.展开更多
Masonry buildings are primarily constructed out of bricks and mortar which become discrete pieces and cannot sustain horizontal forces created by a strong earthquake.The collapse of masonry walls may cause significant...Masonry buildings are primarily constructed out of bricks and mortar which become discrete pieces and cannot sustain horizontal forces created by a strong earthquake.The collapse of masonry walls may cause significant human casualties and economic losses.To maintain their integrity,several methods have been developed to retrofit existing masonry buildings,such as the constructional RC frame which has been extensively used in China.In this study,a new method using precast steel reinforced concrete(PSRC)panels is developed.To demonstrate its effectiveness,numerical studies are conducted to investigate and compare the collapse behavior of a structure without retrofitting,retrofitted with a constructional RC frame,and retrofitted with external PSRC walls(PSRCW).Sophisticated finite element models(FEM)were developed and nonlinear time history analyses were carried out.The results show that the existing masonry building is severely damaged under occasional earthquakes,and totally collapsed under rare earthquakes.Both retrofitting techniques improve the seismic performance of existing masonry buildings.However,it is found that several occasional earthquakes caused collapse or partial collapse of the building retrofitted with the constructional RC frame,while the one retrofitted by the proposed PSRC wall system survives even under rare earthquakes.The effectiveness of the proposed retrofitting method on existing masonry buildings is thus fully demonstrated.展开更多
基金Scientific Research Fund of Liaoning Provincial Education Department under Grant No.LJKZ0336。
文摘Burial depth is a crucial factor affecting the forces and deformation of tunnels during earthquakes.One key issue is a lack of understanding of the effect of a change in the buried depth of a single-side tunnel on the seismic response of a double-tunnel system.In this study,shaking table tests were designed and performed based on a tunnel under construction in Dalian,China.Numerical models were established using the equivalent linear method combined with ABAQUS finite element software to analyze the seismic response of the interacting system.The results showed that the amplification coefficient of the soil acceleration did not change evidently with the burial depth of the new tunnel but decreased as the seismic amplitude increased.In addition,the existing tunnel acceleration,earth pressure,and internal force were hardly affected by the change in the burial depth;for the new tunnel,the acceleration and internal force decreased as the burial depth increased,while the earth pressure increased.This shows that the earth pressure distribution in a double-tunnel system is relatively complex and mainly concentrated on the arch spandrel and arch springing of the relative area.Overall,when the horizontal clearance between the center of the two tunnels was more than twice the sum of the radius of the outer edges of the two tunnels,the change in the burial depth of the new tunnel had little effect on the existing one,and the tunnel structure was deemed safe.These results provide a preliminary understanding and reference for the seismic performance of a double-tunnel system.
基金funded by the National Key Research and Development Program of China(No:2020YFC1909900)the National Natural Science Foundation of China(No:51908550)the Scientific Research Project of China Academy of Railway Sciences Group Corporation Limited(No:2021YJ173).
文摘Purpose – This study aims to analyze the factors, evaluation techniques of the durability of existing railwayengineering.Design/methodology/approach – China has built a railway network of over 150,000 km. Ensuring thesafety of the existing railway engineering is of great significance for maintaining normal railway operationorder. However, railway engineering is a strip structure that crosses multiple complex environments. Andrailway engineering will withstand high-frequency impact loads from trains. The above factors have led todifferences in the deterioration characteristics and maintenance strategies of railway engineering compared toconventional concrete structures. Therefore, it is very important to analyze the key factors that affect thedurability of railway structures and propose technologies for durability evaluation.Findings – The factors that affect the durability and reliability of railway engineering are mainly divided intothree categories: material factors, environmental factors and load factors. Among them, material factors alsoinclude influencing factors, such as raw materials, mix proportions and so on. Environmental factors varydepending on the service environment of railway engineering, and the durability and deterioration of concretehave different failure mechanisms. Load factors include static load and train dynamic load. The on-site rapiddetection methods for five common diseases in railway engineering are also proposed in this paper. Thesemethods can quickly evaluate the durability of existing railway engineering concrete.Originality/value – The research can provide some new evaluation techniques and methods for thedurability of existing railway engineering.
基金supported by the National Natural Science Foundation of China(Grant No.71872122)Late-stage Subsidy Project of Humanities and Social Sciences of the Education Department of China(Grant No.20JHQ095).
文摘The energy-saving renovation of existing residential buildings is a crucial measure to achieve the strategic goal of energy conservation and emission reduction in China and build ecologically livable cities.This article focuses on the perspective of subject behavior,starting from analyzing the current situation and difficulties of the operation of the energy-saving renovation market for existing residential buildings in China,drawing on the practical experience of the operation of the existing residential building energy-saving renovation market abroad.Based on principles such as systematicity,humanization,feasibility,and sustainability,the article constructs an operation optimization system of the existing residential building energy-saving renovation market from the perspective of subject behavior.In order to provide a reference for the healthy and orderly operation of the existing residential building energy-saving renovation market,this paper proposes implementation strategies for optimizing the operation of the existing residential building energy-saving renovation market.Suggestions are proposed from four aspects:optimizing the market environment,innovating the financing model,building the information sharing platform,and utilizing the synergies of the main subjects.
基金supported by the National Natural Science Foundation of China (Grant No.71872122)Late-stage Subsidy Project of Humanities and Social Sciences of the Education Department of China (Grant No. 20JHQ095)。
文摘The long-term and effective implementation of the existing building energy efficiency renovation depends on the development of the existing building energy efficiency renovation market.The key to the development of the existing building energy efficiency renovation market is the joint role of the market players.Starting with the analysis of the externalities and information asymmetry of the existing building energy efficiency renovation market,this paper analyzes the behavioral characteristics and influencing factors of the existing building energy efficiency renovation market entities(central government,local government,owners,energy conservation service enterprises,third-party evaluation institutions,and other market entities),and reveals the problems of the existing building energy efficiency renovation market,such as the absence of government,the lack of main power,and the lack of financing channels,Thus,it lays a platform foundation for the research on the behavior strategy and security system of the existing building energy-s aving renovation market.
基金supported by the National Natural Science Foundation of China (Grant No.71872122)Late-stage Subsidy Project of Humanities and Social Sciences of the EducationDepartment of China (Grant No. 20JHQ095)。
文摘The core of the healthy and orderly operation of the existing residential building energy-saving renovation market lies in the exploration of the implementation mechanism of multi-subject and multi-objective integrated optimization.The multi-agent and multi-objective integrated optimization system framework is a powerful tool to guide the scientific decision-making of the market core structural entities in the future market practice. This paper analyzes the practical dilemma of energy-saving renovation of theexisting residential buildings in China, summarizes the practical experience of multi-subject and multi-objective integrated optimization of energy-saving renovation of the existing residential buildings in foreign countries, and puts forward beneficial practical enlightenment on the basis of comparison at home and abroad;The design principles of the target integrated optimization system have established a multi-subject and multi-objective integrated optimization system framework for the energy-saving renovation of the existing residential buildings, from six aspects: government guidance, trust consensus, value co-creation, risk sharing, revenue sharing, and social responsibility sharing. This paper proposes a multi-subject and multi-objective integrated practice strategy, in order to promote the efficient and orderly development of China's existing residential building energy-saving renovation market.
文摘To shorten the existing box culvert demolition construction period and ensure the normal operation of the railway, the jacking-out construction method was adopted. The ABAQUS finite element software was used to establish a three-dimensional model of the box culvert and soil body of the relying project, and three excavation thickness (0m, 1 m, 2 m) were used as the main variation parameters for numerical analysis and research, and the change law of the box culvert itself and soil body stress during the culvert jacking out process was obtained. The results show that the jacking force-displacement curves of the three working conditions can be divided into two stages, and the jacking force reaches the maximum value at the moment when the static friction turns into sliding friction at the end of the first stage. The stress distribution at the bottom slab of the box culvert in the jacking process is approximately normal, and the stress decreases with the increase of the roadbed excavation thickness. The increase of the roadbed excavation thickness can reduce the soil pressure on the side of the box culvert and effectively reduce the deformation of the roadbed in the jacking-out process. The deformation of the roadbed during the jacking process can be reduced by increasing the thickness of the roadbed excavation.
基金the support of the Innovation and Entrepreneurship Training Program Topic for College Students of North China University of Technology in 2023.
文摘Requirements for the quality of housing have been increasing in recent years.Many existing buildings can no longer meet the needs of residents due to functional,layout,and other issues,and need to be renovated.However,traditional renovation methods have problems such as high pollution and high consumption.With the rapid development of prefabricated construction and green environmental protection concepts,the problems of traditional interior renovation can be resolved using prefabricated interior decoration.As a new and advanced method of renovation,prefabricated renovation reduces construction segments,workload,pollution,and waste,and it promotes the upgrading of the traditional renovation industry.
文摘The bearing capacity testing and evaluation of the existing bridge engineering structure is not only the key to clarify its structural quality and safety performance,but it also can lay a solid foundation for subsequent repairs and maintenance work.To ensure the bearing capacity,durability and reliability of existing bridges,this paper analyzes the importance and methods of testing and evaluation of structural bearing capacity of a bridge.This analysis aims to provide scientific reference for the quality assessment and subsequent repair and maintenance of existing bridge engineering structures.
基金The National Natural Science Foundation of China(No.10672060)
文摘Combined with current specifications and stress characteristics of concrete filled steel tubular (CFST) arch bridges, the determination principle of safe-middle-failure threestage mode is given. Accordingly, damage probability and failure probability and the corresponding reliability indices are calculated; a direct relationship between reliability indices and three-stage working status is made. Based on the three-stage working mode, a combined FNM (finite element-neural network- Monte-Carlo simulation) method is put forward to estimate the reliability of existing bridges. According to time-dependent reliability theory, subsequent service time is divided into several stages; minimum samples required by the Monte-Carlo method are generated by random sampling; training samples are calculated by the finite element method, and the training samples are extended by the neural network; failure probability and damage probability are calculated by the Monte-Carlo method. Thus, time dependent reliability indices are obtained, and the working status is judged. A case study is investigated to estimate the reliability of an actual bridge by the FNM method. The bridge is a CFST arch bridge with an 83.6 m span and it has been in operation for 10 years. According to analysis results, in the tenth year, the example bridge is still in safe status. This conclusion is consistent with the facts, which proves the feasibility of the FNM method for estimating the reliability of existing bridges.
文摘The existing state and partitioning of rare earth (RE) on weathered ores in Longnan County(LN), Xingfeng County(XF) and Ninghua County(NH) were characterized systematically by standard geological analytical methods. It is found that RE in the weathered rare earth ores exist as four phases: (a) water soluble, (b) ion-exchangeable, (c) colloidal sediment (oxides), (d) minerals, in which mainly as ion exchangeable phase, accounting for nearly 80% of total RE, with about 20% in the form of colloid sediment phase and mineral phase, but very little as aqueous soluble phase. These rare earth partitioning were mainly chosen mid-heavy RE elements, occupying above 60%, but not equal in the four phases. The mid-heavy RE elements were primarily enriched in the ion exchangeable phase up to 40%, while the containment of cerium dioxide is below 2 %. The cerium deficiency occurs in the ion exchangeable phase in weathered ore. It results from that the Ce^3+ is oxidized into Ce^4+ and changes into CeO2. For LN ore, the containment of Y is high in weathered ore because Y-minerals are abundant in original rock.
基金supported by the National Natural Science Foundation of China (40373025)
文摘Rare earth element(REE) is widely used in various fields of geology.Study of the existing forms of REE in geological objects is a necessity for us to solve geological problems related with REE.This paper tried to make it clear the existing forms of REE in gold-bearing pyrite in Jinshan gold deposit by stepwise dissolution test with ICP-MS analysis.Results showed that content of REE in fluid-inclusions of gold-bearing pyrite was very low,which only took about 0.07%–0.70% of the ΣREE,and that of pyrite phase ...
基金Beijing Natural Science Foundation under Grant No. 8192008the Scientific Research Foundation of Graduate School of Southeast University under Grant No. YBPY2021+1 种基金the Science and Technology Project of Beijing Municipal Education Commission under Grant No. KM201910016014the Program for Changjiang Scholars and Innovative Research Team in University under Grant No. IRT_17R06。
文摘The improvement of the seismic resilience of existing reinforced-concrete(RC) frame buildings, which is essential for the seismic resilience of a city, has become a critical issue. Although seismic isolation is an effective method for improving the resilient performance of such buildings, target-oriented quantitative improvements of the resilient performance of these buildings have been reported rarely. To address this gap, the seismic resilience of two existing RC frame buildings located in a high seismic intensity region of China were assessed based on the Chinese Standard for Seismic Resilience Assessment of Buildings. The critical engineering demand parameters(EDPs) affecting the seismic resilience of such buildings were identified. Subsequently, the seismic resilience of buildings retrofitted with different isolation schemes(i.e., yield ratios) were evaluated and compared, with emphasis on the relationships among yield ratios, EDPs, and levels of seismic resilience. Accordingly, to achieve the highest level of seismic resilience with respect to the Chinese standard, a yield ratio of 3% was recommended and successfully applied to the target-oriented design for the seismic-resilience improvement of an existing RC frame building. The research outcome can provide an important reference for the resilience-based retrofitting of existing RC frame buildings using seismic isolation in urban cities.
基金Project(2017YFC0805307) supported by the National Key Research and Development Program of ChinaProjects(51878078, 51927814, 51911530215) supported by the National Natural Science Foundation of China+4 种基金Project(2018-025) supported by the Training Program for High-level Technical Personnel in Transportation Industry, ChinaProject (2018JJ1026) supported by the Excellent Youth Foundation of Natural Science Foundation of Hunan Province, ChinaProject(17A008) supported by the Key Project of Education Department of Hunan Province, ChinaProjects(kfj150103, kfj170104) supported by the Open Research Fund of State Engineering Laboratory of Highway Maintenance Technology, Changsha University of Science & Technology, ChinaProject(CX20190644) supported by the Postgraduate Scientific Research Innovation Project of Hunan Province, China。
文摘To relieve the increasing traffic load, many early built highways need to be widened or reconstructed. The rapid performance detection to existing subgrades is important to their reasonable evaluation and maximized utilization. Based on five kinds of soils taken from an existing highway in southern China, three commonly detecting methods were used to determine their moisture contents, compaction degrees and resilient moduli. The results showed that the measured moisture contents were greater than the design value, and the compaction degrees decreased sharply compared to the original ones. The moisture and heat exchange produced a decrease in the resilient modulus of plate loading test(PLT) from the standard 60 MPa down to 40 MPa. Afterwards, the portable falling weight deflectometer(PFWD) and dynamic cone penetrometer(DCP) were used to evaluate the subgrade performances. The measured PFWD moduli and the DCP penetration rates were correlated with the resilient moduli of PLT, deflections of the Beckman beam test, compaction degrees and moisture contents. The correlation analysis indicates that both of two methods are suitable in rapid detecting subgrade performances, but PFWD method is more recommended for it has higher accuracy and efficiency.
基金Project(2005DFA50550) supported by International Science and Technology Cooperation Program of ChinaProject(2005CB623705) supported by the National Basic Research Program of China
文摘In order to investigate the existing form and action mechanism of minor scandium (Sc) and zirconium (Zr) in AI-Cu-Mg alloy, microstructures of Al-4Cu-1Mg-Sc-Zr alloy under different conditions, including states of as-cast, homogenized, hot-rolled, as-solution and natural aged, were observed by scanning electron microscopy (SEM), X-ray diffractometry (XRD) and transmission electron microscopy (TEM). It is revealed that Sc and Zr are completely dissolved into the supersaturated solid solution in as-cast ingot, but grain refinement is not observed. Coffee-bean-like AI3(Sc, Zr) particles deposit during homogenization of ingot induce an increase in hardness. Al3(Sc, Zr) particles are slightly coarsened in as-solution samples, but they still maintain coherent to matrix, which indicates a high thermal stability of these particles. Good coherency ofAl3(Sc, Zr) particles makes some benefits for inhibiting recrystallization and reserving work-hardening.
文摘The basic element in any sustainable dam project is safety, which includes the following safety elements: O structural safety, dam safety monitoring, operational safety and maintenance, and emergency planning. Long-term safety primarily includes the analysis of all hazards affecting the project; that is, hazards from the natural environment, hazards from the man-made environment, and project-specific and site-specific hazards. The special features of the seismic safety of dams are discussed. Large dams were the first structures to be systematically designed against earthquakes, starting in the 1930s. How- ever, the seismic safety of older dams is unknown, as most were designed using seismic design criteria and methods of dynamic analysis that are considered obsolete today. Therefore, we need to reevaluate the seismic safety of existing dams based on current state-of-the-art practices and rehabilitate deficient dams. For large dams, a site-specific seismic hazard analysis is usually recommended. Today, large dams and the safety-relevant elements used for controlling the reservoir after a strong earthquake must be able to withstand the ground motions of a safety evaluation earthquake. The ground motion parameters can be determined either by a probabilistic or a deterministic seismic hazard analysis. During strong earthquakes, inelastic deformations may occur in a dam; therefore, the seismic analysis has to be car- ried out in the time domain. Furthermore, earthquakes create multiple seismic hazards for dams such as ground shaking, fault movements, mass movements, and others. The ground motions needed by the dam engineer are not real earthquake ground motions but models of the ground motion, which allow the safe design of dams. It must also be kept in mind that darn safety evaluations must be carried out several times during the long life of large storage dams. These features are discussed in this paper.
基金This research was supported by the project of Natural Science Foundation of Fujian Province(No.2022J01925)supported by the project of the Fuzhou Science and Technology Plan Project(2021-P-047)supported by the Open Project Program Foundation of Engineering Research Center of underground mine construction,Ministry of Education(Anhui University of Science and Technology)(No.JYBGCZX2021104).
文摘Based on the engineering background of the contact channel between Shangyang and Gushan of Fuzhou Metro Line 2 undercrossing the existing tunnel line,the freezing temperature field of the contact channel,the displacement field of the existing tunnel line and the contact channel with different net distances and horizontal angles are analyzed by ANSYS finite element software and field measurement method.The obtained results indicate that during the freezing period,the temperature drops at different measuring holes are almost the same.The temperature near the bottom freezing tube drops faster than that far from the tube.It is found that the bilateral freezing technique improves the formation of the freezing wall in the intersection area.In this case,the intersection time of the cross-section is 7 days faster than that of the adjacent ordinary section.The change curve of the displacement of the surface uplift in different freezing periods with the distance from the center of the channel is“M”shaped.The maximum uplift displacement at 12 m from channel center is 25 mm.The vertical displacement of the measuring point located above the central axis of the connecting channel is large.The farther the point from the central axis,the smaller the corresponding vertical displacement.When the horizontal angle between the existing tunnel and the connecting channel is less than 60,the existing vertical displacement of the tunnel changes rapidly with the horizontal angle,reaching 0.17 mm/.Meanwhile,when the net distance is less than 6.1 m,the change rate of the vertical displacement of the tunnel is up to 2.4 mm/m.
基金supported by the Incheon National University Research Grant in 2015
文摘Seismic hazard levels lower than those for design of new buildings have been permitted for seismic evaluation and retrofi t of existing buildings due to the relatively short remaining lifespans. The seismic hazard reduction enables costeff ective seismic evaluation and retrofi t of existing buildings with limited structural capacity. The current study proposes seismic hazard reduction factors for Korea, one of low to moderate seismicity regions. The seismic hazard reduction factors are based on equal probabilities of non-exceedance within diff erent remaining building lifespans. A validation procedure is proposed to investigate equality of seismic risk in terms of ductility-based limit states using seismic fragility assessment of nonlinear SDOF systems, of which retrofi t demands are determined by the displacement coeffi cient method of ASCE 41-13 for diff erent target remaining building lifespans and corresponding reduced design earthquakes. Validation result shows that the use of seismic hazard reduction factors can be permitted in conjunction with appropriate lower bounds of the remaining building lifespans.
基金Project(41274012) supported by the National Natural Science Foundation of China
文摘Chloride-induced corrosion of the reinforcement is considered as one of the major mechanisms resulting in the reduction of structural resistance of reinforced concrete structural elements located in marine and other aggressive environments. A study of reinforced concrete structures located at the Fangcheng dock in the Beibu Gulf port, China, was present. The result from field survey indicates that the concrete cover depth and chloride diffusion coefficient fit best normal distribution and lognormal distribution, respectively. The service life of structure is about 55 a, while initiation time is 45 a. Sensitivity analysis indicates that the most influential factor of the structure service life prediction is concrete cover, followed by diffusion coefficient, diffusion decay index, critical chloride concentration, surface chloride concentration, current density and localized pitting corrosion. Finally, the effects of diffusion decay index and critical chloride concentration on structure service life prediction are discussed.
文摘Water distribution network(WDN)leakage management has received increased attention in recent years.One of the most successful leakage-control strategies is to divide the network into District Metered Areas(DMAs).As a multi-staged technique,the generation of DMAs is a difficult task in design and implementation(i.e.,clustering,sectorization,and performance evaluation).Previous studies on DMAs implementation did not consider the potential use of existing valves in achieving the objective.In this work,a methodology is proposed for detecting clusters and reducing the cost of additional valves and DMA sectorization by considering existing valves as much as possible.The procedure of DMAs identification has been divided into three stages,i.e.,a)clusters identification;b)sectorization or boundaries optimization and c)performance evaluation of the partitioned network.The proposed methodology is evaluated on a simple network and a real-world water network with the findings provided and compared to the DMAs,established for a raw water network with no existing valves.It is found that there is an adequate difference in cost of strategy implementation in both the cases for the network under consideration and the existing valve system achieved better network performance in terms of resilience index.
基金Scientific Research Fund of Institute of Engineering Mechanics,CEA under Grant No.2016A06National Key R&D Program of China under Grant Nos.2016YFC0701101 and 2017YFC1500701National Natural Science Foundation of China under Grant No.51678538。
文摘Masonry buildings are primarily constructed out of bricks and mortar which become discrete pieces and cannot sustain horizontal forces created by a strong earthquake.The collapse of masonry walls may cause significant human casualties and economic losses.To maintain their integrity,several methods have been developed to retrofit existing masonry buildings,such as the constructional RC frame which has been extensively used in China.In this study,a new method using precast steel reinforced concrete(PSRC)panels is developed.To demonstrate its effectiveness,numerical studies are conducted to investigate and compare the collapse behavior of a structure without retrofitting,retrofitted with a constructional RC frame,and retrofitted with external PSRC walls(PSRCW).Sophisticated finite element models(FEM)were developed and nonlinear time history analyses were carried out.The results show that the existing masonry building is severely damaged under occasional earthquakes,and totally collapsed under rare earthquakes.Both retrofitting techniques improve the seismic performance of existing masonry buildings.However,it is found that several occasional earthquakes caused collapse or partial collapse of the building retrofitted with the constructional RC frame,while the one retrofitted by the proposed PSRC wall system survives even under rare earthquakes.The effectiveness of the proposed retrofitting method on existing masonry buildings is thus fully demonstrated.