Objective: To explore the practice and application of infection prevention and control strategies in risk departments during the COVID-19 epidemic, and to formulate the infection prevention and control measures to pro...Objective: To explore the practice and application of infection prevention and control strategies in risk departments during the COVID-19 epidemic, and to formulate the infection prevention and control measures to provide advice and guidance in risk departments. Methods: According to the latest plan of diagnosis and treatment, prevention and control issued by the National Health Commission, expert advice and consensus, combined with the actual situation in our hospital, a series of infection prevention and control measures of COVID-19 in risk department was formulated. Results: During the epidemic period, the prevention and control measures of nine risk departments including emergency operation, anesthesiology, endoscopy center, blood purification center, otolaryngology, stomatology, medical imaging department, medical cosmetology department and pulmonary function room were established from six aspects, including pre-examination and screening, medical technology control, personnel management, personal protection, environmental disinfection, medical waste disposal, etc. Conclusion: During the epidemic period, the infection prevention and control strategy of risk departments is one of the key links to control the spread of the epidemic, and risk departments must pay attention to and strictly implement various infection prevention and control measures.展开更多
As an important pillar of national economic development,state-owned enterprises,their operational efficiency,and risk management ability are directly related to the stability and security of the national economy.As an...As an important pillar of national economic development,state-owned enterprises,their operational efficiency,and risk management ability are directly related to the stability and security of the national economy.As an important part of enterprise management,internal control management plays an irreplaceable role.Especially in the current domestic and international economic situation is complex and changeable,market competition is increasingly fierce environment,to strengthen the internal control management of state-owned enterprises and risk prevention measures is particularly important.This paper starts with the importance of internal control management and risk prevention for state-owned enterprises,and analyzes the problems and strategies in the internal control management and risk prevention of state-owned enterprises,in order to build a more comprehensive and efficient risk management system for state-owned enterprises to adapt to the ever-changing market environment and realize sustainable development.展开更多
Deep foundation pit excavation is a basic and key step involved in modern building construction.In order to ensure the construction quality and safety of deep foundation pits,this paper takes a project as an example t...Deep foundation pit excavation is a basic and key step involved in modern building construction.In order to ensure the construction quality and safety of deep foundation pits,this paper takes a project as an example to analyze deep foundation pit excavation technology,including the nature of this construction project,the main technical measures in the construction of deep foundation pit,and the analysis of the safety risk prevention and control measures.The purpose of this analysis is to provide scientific reference for the construction quality and safety of deep foundation pits.展开更多
External disturbance is an important cause of underground pressure pipeline damage,which leads to accidents,and it is crucial to study the risk of damage caused by external disturbance and come up with proper preventi...External disturbance is an important cause of underground pressure pipeline damage,which leads to accidents,and it is crucial to study the risk of damage caused by external disturbance and come up with proper prevention and control measures.We reviewed literature on risk identification of underground pressure pipelines damage due to external disturbance was conducted,and a list of risk factors was formed.Based on the list of risk factors,fault tree analysis was carried out on underground pressure pipelines damage caused by external disturbances,and risk prevention and control measures were proposed through the calculation of minimum cut sets,minimum path sets,and structural importance,in hopes of providing reference for the normal operation of underground pressure pipelines.展开更多
Historically,frequent and heavy snow disaster(SD)has caused serious livestock death and casualties,resulting in a devastating impact on animal husbandry development in the Three Rivers Source Region(TRSR).From winter ...Historically,frequent and heavy snow disaster(SD)has caused serious livestock death and casualties,resulting in a devastating impact on animal husbandry development in the Three Rivers Source Region(TRSR).From winter in 2018 to spring in 2019,the largest SD occurred in this area over the past 10 years,especially in core zones of the Lancang River Source Region.Field research results show that the main causes of the major SD include weak infrastructure(i.e.,roads,communications,warm sheds,and insufficient forage reserve),low rate of domestic animals for sale before the SD,and low loss settlement rate.SD occurrence could furtherly reduce the ability of disaster prevention,mitigation and relief of disaster loss.In the future,heavily affected SD areas should improve the forecasting ability of snowfall incidents,strengthen infrastructure construction,implement grass and livestock balance strategies,optimize livestock structure,improve loss settlement rate,and develop a modern compound model of animal husbandry development model that combines breeding,slaughtering and deep processing of animal product.展开更多
My topic is the risk assessment of safety of Chinese materia medica.Next I will take drug-induced hepatic injury as an example.First of all,let us look back at what Chinese materia medica is.What are the real meanings...My topic is the risk assessment of safety of Chinese materia medica.Next I will take drug-induced hepatic injury as an example.First of all,let us look back at what Chinese materia medica is.What are the real meanings of these 3 words? These 3 words Zi Hua Zi have been said more than BC 500."TCM practitioners are for treatment and medicines," what do you mean? Treatment means to find the cause of the disease and to find the law,while medicine is to find ways and means to cure diseases.展开更多
With the deepening of the“Belt and Road”initiative,Chinese enterprises are facing unprecedented opportunities and challenges for international cooperation.This paper mainly analyzes the current situation,existing pr...With the deepening of the“Belt and Road”initiative,Chinese enterprises are facing unprecedented opportunities and challenges for international cooperation.This paper mainly analyzes the current situation,existing problems,and coping strategies of enterprise international cooperation management in the context of the“Belt and Road”.This article expounds on the importance of the“Belt and Road”initiative for international cooperation of enterprises and analyzes the key links of international cooperation management of enterprises from the aspects of internationalization strategy,cross-cultural management,risk prevention and control,and resource integration.Finally,combined with the case,this paper puts forward the management strategies and suggestions that enterprises should adopt in international cooperation,to provide a useful reference for Chinese enterprises in international cooperation in the construction of the“Belt and Road.”展开更多
In this paper,we investigate and analyze the network security risks faced by 5G private industrial networks.Based on current network security architecture and 3GPP requirements and considering the actual application o...In this paper,we investigate and analyze the network security risks faced by 5G private industrial networks.Based on current network security architecture and 3GPP requirements and considering the actual application of 5G private industrial networks,a comparative analysis is used to plan and design a private network security construction scheme.The network security construction model,network organization,and key processes of 5G private industrial networks at the current stage are investigated.In addition,the key direction for the next stage of construction is discussed.展开更多
Background: Novel coronavirus pneumonia (NCP) and osteoporotic vertebral compression fractures (OVCF) are the high incidences of diseases in the elderly. During the epidemic period, if not treated in time, the complic...Background: Novel coronavirus pneumonia (NCP) and osteoporotic vertebral compression fractures (OVCF) are the high incidences of diseases in the elderly. During the epidemic period, if not treated in time, the complications are high and the mortality is high. If we do not pay attention to infection prevention and control in pre-hospital emergency care, it will lead to the first time infection of medical staff and in-hospital cross infection in emergency outpatient receiving area. The correct consideration of both and the establishment of perfect pre-hospital emergency treatment and infection prevention and control synchronous strategy is an important premise to ensure the stable, orderly and safe medical treatment. Objective: To explore the effect of synchronous implementation of pre-hospital emergency care, nursing and infection pre-vention and control for senile OVCF during the epidemic. In order to improve the efficiency of pre-hospital emergency care and prevent the spread of infection. Method: A total of 92 elderly patients with OVCF who received pre-hospital treatment in 18 hospitals in Zhangjiakou City during the epidemic prevention and control period from January 2020 to November 2022 and met the inclusion criteria were selected as research objects, including 24 males and 68 females, aged 65 - 82 (74.2 ± 2.2) years. All patients were associated with concomitant injuries and underlying diseases. All patients in this group underwent predictive pre-hospital rescue and infection prevention and control procedures. Results: All the 92 elderly patients with OVCF received timely pre-hospital treatment during the epidemic period, and no aggravation occurred of the 92 patients, 35 were in the high risk area, 10 were in the medium risk area, and 47 were in the low risk area. Exclude OVCF for NCP Patients were treated according to the conventional diagnosis and treatment principles. Suspected and confirmed cases are transferred to designated surgical hospitals for treatment. All patients were followed up 3 months, 6 months and 12 months after treatment. There was no death rate, high satisfaction of pre-hospital first aid, high diagnostic accuracy, and good curative effect. None of the rescue personnel had any infection rate, and no hospital infection transmission and nosocomial cross infection occurred. Conclusion: It is the first step to safely treat patients and prevent cross infection to establish a perfect synchronous strategy of pre-hospital first aid and infection prevention and control.展开更多
Since the commence of 18th National Congress of the Communist Party of China, the CPC Central Committee represented by General Secretary Xi Jinping, has attached unprecedented importance to anti corruption constructio...Since the commence of 18th National Congress of the Communist Party of China, the CPC Central Committee represented by General Secretary Xi Jinping, has attached unprecedented importance to anti corruption construction and has strengthened the investigation degree on the disciplinary offence behaviors of the party member the leading cadres, which kills rampant misbehaviors around the people from the source. State-owned enterprises are the pillar of the national economy, which should respond to call of the country, in a bid to strengthen the construction of honest and integrity, prevent risks, and build a perfect internal control mechanism. Focusing on the state-owned enterprise’s anti-corruption risk prevention mechanism and internal control construction, this paper conducts a research aiming at starting a discussion.展开更多
Engineering, procurement and construction (EPC) contracts are becoming the most popular form to undertake construction works on large-scale hydropower projects.?The EPC general contractors in Vietnam have been coped w...Engineering, procurement and construction (EPC) contracts are becoming the most popular form to undertake construction works on large-scale hydropower projects.?The EPC general contractors in Vietnam have been coped with lots of difficulties during the construction phase of hydropower projects, resulting in significant schedule delays and cost overrun. One of the reasons is poor Subcontractors capacity.?In order to overcome above, the current study attempts?to research on identification and control Subcontractors risks of delay process of EPC hydropower project in Vietnam.?Through summarizing international research achievements of previous researches relating on EPC hydropower projects combining with analysis characteristics of developing construction of EPC hydropower projects in Vietnam, the current study pointed out all kinds of subcontractor risk of delay process of EPC hydropower project in Vietnam;?a questionnaire with 18 risk elements was designed and then delivered to experts in EPC hydropower project management area. Based on the risk model, 11 main risk elements were identified which can be categorized into 3 groups.?Lastly, the current study proposed suggestions to reduce or avoid risks as well as approach to control risks.?Furthermore, the findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environment to Vietnam to get their EPC construction project completed on schedule, thus ensuring the benefits to the government, the investor, the contractor, and the parties involved.展开更多
Engineering, procurement and construction (EPC) contracts are on the way to become the most usual form of contracting applied by the private sector to undertake construction works on large scale Hydropower projects. I...Engineering, procurement and construction (EPC) contracts are on the way to become the most usual form of contracting applied by the private sector to undertake construction works on large scale Hydropower projects. If EPC contract management is not implemented and controlled properly. Quality is the first important factor for any contractors who involve in the hydropower project execution. The purpose of this study is to investigate and evaluate risks causing not good quality of EPC hydropower projects in Vietnam. In addition, the study also provided the recommendations for project practitioners to mitigate the impacts of those identified risks. The findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environments to Vietnam to get their EPC construction project completed on quality, thus will ensuring the benefits to the government, the investors, the contractors, and the parties involved.展开更多
In the past 30 years,the accessibility and quality index of medical care have made remarkable progress in China,ranking the first among middle-income countries.Many cardiovascular technologies are at or near the world...In the past 30 years,the accessibility and quality index of medical care have made remarkable progress in China,ranking the first among middle-income countries.Many cardiovascular technologies are at or near the world's leading level,and significant progress has been achieved in China solving the problem of“treatment difficulty”of cardiovascular diseases(CVD).However,due to the prevalence of unhealthy lifestyles among Chinese residents,a huge population with CVD risk factors,accelerated population aging,and other reasons,the incidence and mortality rate of CVD are still increasing,and the turning point of the decline in disease burden has not appeared yet in China.In terms of proportions of disease mortality among urban and rural residents,CVD still ranks the first.In 2020,CVD accounted for 48.00%and 45.86%of the causes of death in rural and urban areas,respectively;two out of every five deaths were due to CVD.It is estimated that the number of current CVD patients in China is around 330 million,including 13 million stroke,11.39 million coronary heart disease,8.9 million heart failure,5 million pulmonary heart disease,4.87 million atrial fibrillation,2.5 million rheumatic heart disease,2 million congenital heart disease,45.3 million peripheral artery disease,and 245 million hypertension cases.China has entered a new stage of transformation from high-speed development to high-quality development,and the prevention and control of CVD in China should also shift from previous emphasis on scale growth to strategies focusing more on strategic and key technological development in order to curb the trend of increasing incidence and mortality rates of CVD.展开更多
At present,the biggest obstacle that growing enterprises may encounter in their development process is insufficient funds.Private equity financing does not only solve the capital problem of enterprises,but also provid...At present,the biggest obstacle that growing enterprises may encounter in their development process is insufficient funds.Private equity financing does not only solve the capital problem of enterprises,but also provide enterprises with professional management concepts and even help growing enterprises to go public in advance.However,high returns must be accompanied by high risks.For example,private equity financing has information asymmetry risks,principal-agent risks,etc.,and these risks make it impossible to maximize the advantages of private equity financing.Therefore,in order to reduce the risks brought by financing,investment and financing parties should choose to sign gambling contracts to reduce the risk.In recent years,the use of VAM agreements has become more in China.However,according to incomplete statistics,less than 30%of VAM agreements are successful,and this result is mainly due to the insufficient depth and breadth of research on VAM agreements.Therefore,this article will comprehensively analyze the problems that need to be paid attention to when signing a gambling agreement by introducing the case of Anda Technology,and the issue of targeted risk prevention will also be discussed in this paper.展开更多
Objective: To investigate the influence of the new coronavirus epidemic on tumor radiotherapy patients in Zigong City, and provide radiotherapy feasibility and safety in other prefecture-level or low-risk areas. Metho...Objective: To investigate the influence of the new coronavirus epidemic on tumor radiotherapy patients in Zigong City, and provide radiotherapy feasibility and safety in other prefecture-level or low-risk areas. Methods: Retrospective Collection of data from January 31, 2020, in our hospital, this time period is an epidemic group. The control group was data from January 31, 2019-May 31, in our hospital. Patient data includes gender, age, tumor type, hospitalization fee, average hospitalization day, radiotherapy completion, treatment destination, and other information. Results: The patients with epidemic groups and control groups were 320 and 237, respectively, and the radiotherapy patients increased by 25.9%, increasing patients mainly from other departures outside the tumor department underperformance reform intervention. The epidemic group of brain and breast tumor patients were 39 and 37, respectively, with statistical differences (P < 0.05) compared to the control group (25 and 16 respectively). The number of tumor radiotherapy patients in other parts increased, but there was no statistical difference (P > 0.05). Inpatient costs, the average hospitalization day, radiotherapy completion, the purpose of treatment, and other data epidemic groups and control groups have no statistical difference (P > 0.05). Conclusion: The number of COVID-2019 epidemic interventions has increased the number of cancer radiotherapy patients in our hospital, and the epidemic situation has no effect on hospitalization, the average hospitalization day, radiotherapy, and the like. Optimizing the process of clinical treatment, strict prevention and control measures can ensure timely and safe radiotherapy in low-risk areas.展开更多
文摘Objective: To explore the practice and application of infection prevention and control strategies in risk departments during the COVID-19 epidemic, and to formulate the infection prevention and control measures to provide advice and guidance in risk departments. Methods: According to the latest plan of diagnosis and treatment, prevention and control issued by the National Health Commission, expert advice and consensus, combined with the actual situation in our hospital, a series of infection prevention and control measures of COVID-19 in risk department was formulated. Results: During the epidemic period, the prevention and control measures of nine risk departments including emergency operation, anesthesiology, endoscopy center, blood purification center, otolaryngology, stomatology, medical imaging department, medical cosmetology department and pulmonary function room were established from six aspects, including pre-examination and screening, medical technology control, personnel management, personal protection, environmental disinfection, medical waste disposal, etc. Conclusion: During the epidemic period, the infection prevention and control strategy of risk departments is one of the key links to control the spread of the epidemic, and risk departments must pay attention to and strictly implement various infection prevention and control measures.
文摘As an important pillar of national economic development,state-owned enterprises,their operational efficiency,and risk management ability are directly related to the stability and security of the national economy.As an important part of enterprise management,internal control management plays an irreplaceable role.Especially in the current domestic and international economic situation is complex and changeable,market competition is increasingly fierce environment,to strengthen the internal control management of state-owned enterprises and risk prevention measures is particularly important.This paper starts with the importance of internal control management and risk prevention for state-owned enterprises,and analyzes the problems and strategies in the internal control management and risk prevention of state-owned enterprises,in order to build a more comprehensive and efficient risk management system for state-owned enterprises to adapt to the ever-changing market environment and realize sustainable development.
文摘Deep foundation pit excavation is a basic and key step involved in modern building construction.In order to ensure the construction quality and safety of deep foundation pits,this paper takes a project as an example to analyze deep foundation pit excavation technology,including the nature of this construction project,the main technical measures in the construction of deep foundation pit,and the analysis of the safety risk prevention and control measures.The purpose of this analysis is to provide scientific reference for the construction quality and safety of deep foundation pits.
基金This project was funded by Consulting Research Project of Chinese Academy of Engineering:Research on Innovative Development Strategy of Urban Safety Engineering(Project number:2020-02)。
文摘External disturbance is an important cause of underground pressure pipeline damage,which leads to accidents,and it is crucial to study the risk of damage caused by external disturbance and come up with proper prevention and control measures.We reviewed literature on risk identification of underground pressure pipelines damage due to external disturbance was conducted,and a list of risk factors was formed.Based on the list of risk factors,fault tree analysis was carried out on underground pressure pipelines damage caused by external disturbances,and risk prevention and control measures were proposed through the calculation of minimum cut sets,minimum path sets,and structural importance,in hopes of providing reference for the normal operation of underground pressure pipelines.
基金supported by Open-ended Fund of Qinghai Province Key Laboratory of Physical Geography and Environmental Process(2018-QZH-K01)National Natural Science Foundation of China(41701505,41871064)the foundation of PHD development in Yichun University(201-3360118009)
文摘Historically,frequent and heavy snow disaster(SD)has caused serious livestock death and casualties,resulting in a devastating impact on animal husbandry development in the Three Rivers Source Region(TRSR).From winter in 2018 to spring in 2019,the largest SD occurred in this area over the past 10 years,especially in core zones of the Lancang River Source Region.Field research results show that the main causes of the major SD include weak infrastructure(i.e.,roads,communications,warm sheds,and insufficient forage reserve),low rate of domestic animals for sale before the SD,and low loss settlement rate.SD occurrence could furtherly reduce the ability of disaster prevention,mitigation and relief of disaster loss.In the future,heavily affected SD areas should improve the forecasting ability of snowfall incidents,strengthen infrastructure construction,implement grass and livestock balance strategies,optimize livestock structure,improve loss settlement rate,and develop a modern compound model of animal husbandry development model that combines breeding,slaughtering and deep processing of animal product.
文摘My topic is the risk assessment of safety of Chinese materia medica.Next I will take drug-induced hepatic injury as an example.First of all,let us look back at what Chinese materia medica is.What are the real meanings of these 3 words? These 3 words Zi Hua Zi have been said more than BC 500."TCM practitioners are for treatment and medicines," what do you mean? Treatment means to find the cause of the disease and to find the law,while medicine is to find ways and means to cure diseases.
文摘With the deepening of the“Belt and Road”initiative,Chinese enterprises are facing unprecedented opportunities and challenges for international cooperation.This paper mainly analyzes the current situation,existing problems,and coping strategies of enterprise international cooperation management in the context of the“Belt and Road”.This article expounds on the importance of the“Belt and Road”initiative for international cooperation of enterprises and analyzes the key links of international cooperation management of enterprises from the aspects of internationalization strategy,cross-cultural management,risk prevention and control,and resource integration.Finally,combined with the case,this paper puts forward the management strategies and suggestions that enterprises should adopt in international cooperation,to provide a useful reference for Chinese enterprises in international cooperation in the construction of the“Belt and Road.”
文摘In this paper,we investigate and analyze the network security risks faced by 5G private industrial networks.Based on current network security architecture and 3GPP requirements and considering the actual application of 5G private industrial networks,a comparative analysis is used to plan and design a private network security construction scheme.The network security construction model,network organization,and key processes of 5G private industrial networks at the current stage are investigated.In addition,the key direction for the next stage of construction is discussed.
文摘Background: Novel coronavirus pneumonia (NCP) and osteoporotic vertebral compression fractures (OVCF) are the high incidences of diseases in the elderly. During the epidemic period, if not treated in time, the complications are high and the mortality is high. If we do not pay attention to infection prevention and control in pre-hospital emergency care, it will lead to the first time infection of medical staff and in-hospital cross infection in emergency outpatient receiving area. The correct consideration of both and the establishment of perfect pre-hospital emergency treatment and infection prevention and control synchronous strategy is an important premise to ensure the stable, orderly and safe medical treatment. Objective: To explore the effect of synchronous implementation of pre-hospital emergency care, nursing and infection pre-vention and control for senile OVCF during the epidemic. In order to improve the efficiency of pre-hospital emergency care and prevent the spread of infection. Method: A total of 92 elderly patients with OVCF who received pre-hospital treatment in 18 hospitals in Zhangjiakou City during the epidemic prevention and control period from January 2020 to November 2022 and met the inclusion criteria were selected as research objects, including 24 males and 68 females, aged 65 - 82 (74.2 ± 2.2) years. All patients were associated with concomitant injuries and underlying diseases. All patients in this group underwent predictive pre-hospital rescue and infection prevention and control procedures. Results: All the 92 elderly patients with OVCF received timely pre-hospital treatment during the epidemic period, and no aggravation occurred of the 92 patients, 35 were in the high risk area, 10 were in the medium risk area, and 47 were in the low risk area. Exclude OVCF for NCP Patients were treated according to the conventional diagnosis and treatment principles. Suspected and confirmed cases are transferred to designated surgical hospitals for treatment. All patients were followed up 3 months, 6 months and 12 months after treatment. There was no death rate, high satisfaction of pre-hospital first aid, high diagnostic accuracy, and good curative effect. None of the rescue personnel had any infection rate, and no hospital infection transmission and nosocomial cross infection occurred. Conclusion: It is the first step to safely treat patients and prevent cross infection to establish a perfect synchronous strategy of pre-hospital first aid and infection prevention and control.
文摘Since the commence of 18th National Congress of the Communist Party of China, the CPC Central Committee represented by General Secretary Xi Jinping, has attached unprecedented importance to anti corruption construction and has strengthened the investigation degree on the disciplinary offence behaviors of the party member the leading cadres, which kills rampant misbehaviors around the people from the source. State-owned enterprises are the pillar of the national economy, which should respond to call of the country, in a bid to strengthen the construction of honest and integrity, prevent risks, and build a perfect internal control mechanism. Focusing on the state-owned enterprise’s anti-corruption risk prevention mechanism and internal control construction, this paper conducts a research aiming at starting a discussion.
文摘Engineering, procurement and construction (EPC) contracts are becoming the most popular form to undertake construction works on large-scale hydropower projects.?The EPC general contractors in Vietnam have been coped with lots of difficulties during the construction phase of hydropower projects, resulting in significant schedule delays and cost overrun. One of the reasons is poor Subcontractors capacity.?In order to overcome above, the current study attempts?to research on identification and control Subcontractors risks of delay process of EPC hydropower project in Vietnam.?Through summarizing international research achievements of previous researches relating on EPC hydropower projects combining with analysis characteristics of developing construction of EPC hydropower projects in Vietnam, the current study pointed out all kinds of subcontractor risk of delay process of EPC hydropower project in Vietnam;?a questionnaire with 18 risk elements was designed and then delivered to experts in EPC hydropower project management area. Based on the risk model, 11 main risk elements were identified which can be categorized into 3 groups.?Lastly, the current study proposed suggestions to reduce or avoid risks as well as approach to control risks.?Furthermore, the findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environment to Vietnam to get their EPC construction project completed on schedule, thus ensuring the benefits to the government, the investor, the contractor, and the parties involved.
文摘Engineering, procurement and construction (EPC) contracts are on the way to become the most usual form of contracting applied by the private sector to undertake construction works on large scale Hydropower projects. If EPC contract management is not implemented and controlled properly. Quality is the first important factor for any contractors who involve in the hydropower project execution. The purpose of this study is to investigate and evaluate risks causing not good quality of EPC hydropower projects in Vietnam. In addition, the study also provided the recommendations for project practitioners to mitigate the impacts of those identified risks. The findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environments to Vietnam to get their EPC construction project completed on quality, thus will ensuring the benefits to the government, the investors, the contractors, and the parties involved.
文摘In the past 30 years,the accessibility and quality index of medical care have made remarkable progress in China,ranking the first among middle-income countries.Many cardiovascular technologies are at or near the world's leading level,and significant progress has been achieved in China solving the problem of“treatment difficulty”of cardiovascular diseases(CVD).However,due to the prevalence of unhealthy lifestyles among Chinese residents,a huge population with CVD risk factors,accelerated population aging,and other reasons,the incidence and mortality rate of CVD are still increasing,and the turning point of the decline in disease burden has not appeared yet in China.In terms of proportions of disease mortality among urban and rural residents,CVD still ranks the first.In 2020,CVD accounted for 48.00%and 45.86%of the causes of death in rural and urban areas,respectively;two out of every five deaths were due to CVD.It is estimated that the number of current CVD patients in China is around 330 million,including 13 million stroke,11.39 million coronary heart disease,8.9 million heart failure,5 million pulmonary heart disease,4.87 million atrial fibrillation,2.5 million rheumatic heart disease,2 million congenital heart disease,45.3 million peripheral artery disease,and 245 million hypertension cases.China has entered a new stage of transformation from high-speed development to high-quality development,and the prevention and control of CVD in China should also shift from previous emphasis on scale growth to strategies focusing more on strategic and key technological development in order to curb the trend of increasing incidence and mortality rates of CVD.
文摘At present,the biggest obstacle that growing enterprises may encounter in their development process is insufficient funds.Private equity financing does not only solve the capital problem of enterprises,but also provide enterprises with professional management concepts and even help growing enterprises to go public in advance.However,high returns must be accompanied by high risks.For example,private equity financing has information asymmetry risks,principal-agent risks,etc.,and these risks make it impossible to maximize the advantages of private equity financing.Therefore,in order to reduce the risks brought by financing,investment and financing parties should choose to sign gambling contracts to reduce the risk.In recent years,the use of VAM agreements has become more in China.However,according to incomplete statistics,less than 30%of VAM agreements are successful,and this result is mainly due to the insufficient depth and breadth of research on VAM agreements.Therefore,this article will comprehensively analyze the problems that need to be paid attention to when signing a gambling agreement by introducing the case of Anda Technology,and the issue of targeted risk prevention will also be discussed in this paper.
文摘Objective: To investigate the influence of the new coronavirus epidemic on tumor radiotherapy patients in Zigong City, and provide radiotherapy feasibility and safety in other prefecture-level or low-risk areas. Methods: Retrospective Collection of data from January 31, 2020, in our hospital, this time period is an epidemic group. The control group was data from January 31, 2019-May 31, in our hospital. Patient data includes gender, age, tumor type, hospitalization fee, average hospitalization day, radiotherapy completion, treatment destination, and other information. Results: The patients with epidemic groups and control groups were 320 and 237, respectively, and the radiotherapy patients increased by 25.9%, increasing patients mainly from other departures outside the tumor department underperformance reform intervention. The epidemic group of brain and breast tumor patients were 39 and 37, respectively, with statistical differences (P < 0.05) compared to the control group (25 and 16 respectively). The number of tumor radiotherapy patients in other parts increased, but there was no statistical difference (P > 0.05). Inpatient costs, the average hospitalization day, radiotherapy completion, the purpose of treatment, and other data epidemic groups and control groups have no statistical difference (P > 0.05). Conclusion: The number of COVID-2019 epidemic interventions has increased the number of cancer radiotherapy patients in our hospital, and the epidemic situation has no effect on hospitalization, the average hospitalization day, radiotherapy, and the like. Optimizing the process of clinical treatment, strict prevention and control measures can ensure timely and safe radiotherapy in low-risk areas.