To handle the handover challenge in Express Train Access Networks(ETAN).mobility fading effects in high speed railway environments should be addressed first.Based on the investigation of fading effects in this paper,w...To handle the handover challenge in Express Train Access Networks(ETAN).mobility fading effects in high speed railway environments should be addressed first.Based on the investigation of fading effects in this paper,we obtain two theoretical bounds:HOTiming upper bound and HO-Margin lower bound,which are helpful guidelines to study the handover challenge today and in the future.Then,we apply them to analyze performance of conventional handover technologies and our proposal in ETAN.This follow-up theory analyses and simulation experiment results demonstrate that the proposed handover solution can minimize handover time up to 4ms(which is the fastest one so far),and reduce HO-Margin to 0.16 dB at a train speed of 350km/h.展开更多
Purpose-Express freight transportation is in rapid development currently.Owing to the higher speed of express freight train,the deformation of the bridge deck worsens the railway line condition under the action of win...Purpose-Express freight transportation is in rapid development currently.Owing to the higher speed of express freight train,the deformation of the bridge deck worsens the railway line condition under the action of wind and train moving load when the train runs over a long-span bridge.Besides,the blunt car body of vehicle has poor aerodynamic characteristics,bringing a greater challenge on the running stability in the crosswind.Design/methodology/approach-In this study,the aerodynamic force coefficients of express freight vehicles on the bridge are measured by scale model wind tunnel test.The dynamic model of the train-long-span steel truss bridge coupling system is established,and the dynamic response as well as the running safety of vehicle are evaluated.Findings-The results show that wind speed has a significant influence on running safety,which is mainly reflected in the over-limitation of wheel unloading rate.The wind speed limit decreases with train speed,and it reduces to 18.83 m/s when the train speed is 160 km/h.Originality/value-This study deepens the theoretical understanding of the interaction between vehicles and bridges and proposes new methods for analyzing similar engineering problems.It also provides a new theoretical basis for the safety assessment of express freight trains.展开更多
基金supported by the National Basic Research Program of China (973 Program)(No.2012CB315606 and 2010CB328201)
文摘To handle the handover challenge in Express Train Access Networks(ETAN).mobility fading effects in high speed railway environments should be addressed first.Based on the investigation of fading effects in this paper,we obtain two theoretical bounds:HOTiming upper bound and HO-Margin lower bound,which are helpful guidelines to study the handover challenge today and in the future.Then,we apply them to analyze performance of conventional handover technologies and our proposal in ETAN.This follow-up theory analyses and simulation experiment results demonstrate that the proposed handover solution can minimize handover time up to 4ms(which is the fastest one so far),and reduce HO-Margin to 0.16 dB at a train speed of 350km/h.
基金supported by the Research Major Project of China Academy of Railway Sciences Group Co.,Ltd(Grant No.2021YJ270)the China National Railway Group Science and Technology Program(Grant No.N2022T001).
文摘Purpose-Express freight transportation is in rapid development currently.Owing to the higher speed of express freight train,the deformation of the bridge deck worsens the railway line condition under the action of wind and train moving load when the train runs over a long-span bridge.Besides,the blunt car body of vehicle has poor aerodynamic characteristics,bringing a greater challenge on the running stability in the crosswind.Design/methodology/approach-In this study,the aerodynamic force coefficients of express freight vehicles on the bridge are measured by scale model wind tunnel test.The dynamic model of the train-long-span steel truss bridge coupling system is established,and the dynamic response as well as the running safety of vehicle are evaluated.Findings-The results show that wind speed has a significant influence on running safety,which is mainly reflected in the over-limitation of wheel unloading rate.The wind speed limit decreases with train speed,and it reduces to 18.83 m/s when the train speed is 160 km/h.Originality/value-This study deepens the theoretical understanding of the interaction between vehicles and bridges and proposes new methods for analyzing similar engineering problems.It also provides a new theoretical basis for the safety assessment of express freight trains.