Chinese utilities as well as those worldwide are facing increased demand for additional electricity, reduced plant emissions and greater efficiency. To meet this challenge will require increasing boiler temperature, p...Chinese utilities as well as those worldwide are facing increased demand for additional electricity, reduced plant emissions and greater efficiency. To meet this challenge will require increasing boiler temperature, pressure and coal ash corrosion resistance of the materials of boiler construction of future coal-fired boilers. A new nickel-based tube alloy, INCONEL^R alloy 740, is described aiming at meeting this challenge. Emphasis will be on describing the alloy' s mechanical properties, coal-ash and steam corrosion resistance. Microstructural stability as a function of temperature and time is addressed as well as some of the early methodology em- ployed to arrive at the current chemical composition.展开更多
A three dimensional nonlinear FE program is used to calculate the fire resistances of concrete filled steel tubular columns under fire. The temperature distributions in the circular section fire are decided by solving...A three dimensional nonlinear FE program is used to calculate the fire resistances of concrete filled steel tubular columns under fire. The temperature distributions in the circular section fire are decided by solving the Fourier Transfer Equation ,and the mechanical behaviour and failure of concrete filled steel tubular columns under fire are thus investigated, and the effects of several parameters on the fire resistance are analysed. The results obtained are in good agreement with the Eurocode.展开更多
This article introduces the present status anddevelopment of 600 MW class boilers in China. The statisticaldata indicate that most 600 MW generating units experiencedrelatively length" growing up" period. In...This article introduces the present status anddevelopment of 600 MW class boilers in China. The statisticaldata indicate that most 600 MW generating units experiencedrelatively length" growing up" period. In this period, unitscould not operate stably , their unplanned outage times weremany and durations long, and availabilities low. On the basis oftesting and research and the summing-up of practice, it wasindicated slagging in the furnace, deviation of tine gas energy atthe exit of furnace, and overheating bursting of superheater andreheater etc, endangering the safety and economics ofoperation,main problems could be completely alleviated oravoided through design and type selection of boiler furnace andburners, coal characteristics and coal handling management,and optimization management of operation conditions etc.展开更多
文摘Chinese utilities as well as those worldwide are facing increased demand for additional electricity, reduced plant emissions and greater efficiency. To meet this challenge will require increasing boiler temperature, pressure and coal ash corrosion resistance of the materials of boiler construction of future coal-fired boilers. A new nickel-based tube alloy, INCONEL^R alloy 740, is described aiming at meeting this challenge. Emphasis will be on describing the alloy' s mechanical properties, coal-ash and steam corrosion resistance. Microstructural stability as a function of temperature and time is addressed as well as some of the early methodology em- ployed to arrive at the current chemical composition.
文摘A three dimensional nonlinear FE program is used to calculate the fire resistances of concrete filled steel tubular columns under fire. The temperature distributions in the circular section fire are decided by solving the Fourier Transfer Equation ,and the mechanical behaviour and failure of concrete filled steel tubular columns under fire are thus investigated, and the effects of several parameters on the fire resistance are analysed. The results obtained are in good agreement with the Eurocode.
文摘This article introduces the present status anddevelopment of 600 MW class boilers in China. The statisticaldata indicate that most 600 MW generating units experiencedrelatively length" growing up" period. In this period, unitscould not operate stably , their unplanned outage times weremany and durations long, and availabilities low. On the basis oftesting and research and the summing-up of practice, it wasindicated slagging in the furnace, deviation of tine gas energy atthe exit of furnace, and overheating bursting of superheater andreheater etc, endangering the safety and economics ofoperation,main problems could be completely alleviated oravoided through design and type selection of boiler furnace andburners, coal characteristics and coal handling management,and optimization management of operation conditions etc.