A new bottleneck-based heuristic for large-scale flow-shop scheduling problems with a bottleneck is proposed, which is simpler but more tailored than the shifting bottleneck (SB) procedure. In this algorithm, a sche...A new bottleneck-based heuristic for large-scale flow-shop scheduling problems with a bottleneck is proposed, which is simpler but more tailored than the shifting bottleneck (SB) procedure. In this algorithm, a schedule for the bottleneck machine is first constructed optimally and then the non-bottleneck machines are scheduled around the bottleneck schedule by some effective dispatching rules. Computational results show that the modified bottleneck-based procedure can achieve a tradeoff between solution quality and computational time comparing with SB procedure for medium-size problems. Furthermore it can obtain a good solution in quite short time for large-scale scheduling problems.展开更多
This paper presents makespan algorithms and scheduling heuristic for an Internet-based collaborative design and manufacturing process using bottleneck approach. The collaborative manufacturing process resembles a perm...This paper presents makespan algorithms and scheduling heuristic for an Internet-based collaborative design and manufacturing process using bottleneck approach. The collaborative manufacturing process resembles a permutation re-entrant flow shop environment with four machines executing the process routing of M1,M2,M3,M4,M3,M4 in which the combination of the last three processes of M4,M3,M4 has high tendency of exhibiting dominant machine character-istic. It was shown that using bottleneck-based analysis, effective makespan algorithms and constructive heuristic can be developed to solve for near-optimal scheduling sequence. At strong machine dominance level and medium to large job numbers, this heuristic shows better makespan performance compared to the NEH.展开更多
基金This project is supported by National Natural Science Foundation of China (No.60274013, No.60474002)Shanghai City Development Found for Science and Technology, China(No.04DZ11008)
文摘A new bottleneck-based heuristic for large-scale flow-shop scheduling problems with a bottleneck is proposed, which is simpler but more tailored than the shifting bottleneck (SB) procedure. In this algorithm, a schedule for the bottleneck machine is first constructed optimally and then the non-bottleneck machines are scheduled around the bottleneck schedule by some effective dispatching rules. Computational results show that the modified bottleneck-based procedure can achieve a tradeoff between solution quality and computational time comparing with SB procedure for medium-size problems. Furthermore it can obtain a good solution in quite short time for large-scale scheduling problems.
文摘This paper presents makespan algorithms and scheduling heuristic for an Internet-based collaborative design and manufacturing process using bottleneck approach. The collaborative manufacturing process resembles a permutation re-entrant flow shop environment with four machines executing the process routing of M1,M2,M3,M4,M3,M4 in which the combination of the last three processes of M4,M3,M4 has high tendency of exhibiting dominant machine character-istic. It was shown that using bottleneck-based analysis, effective makespan algorithms and constructive heuristic can be developed to solve for near-optimal scheduling sequence. At strong machine dominance level and medium to large job numbers, this heuristic shows better makespan performance compared to the NEH.