A GPS baseline solution model is presented,based on the Empirical Mode Decomposition(EMD),which has the advan- tage of eliminating the error effects outside the model.The EMD technique is a new signal processing metho...A GPS baseline solution model is presented,based on the Empirical Mode Decomposition(EMD),which has the advan- tage of eliminating the error effects outside the model.The EMD technique is a new signal processing method for non-linear time series,which decomposes a time series into a finite and often small number of Intrinsic Mode Functions(IMFs).The decomposition procedure is adaptive and data-driven which is suitable for non-linear data series analysis.A multi-scale decomposition and recon- struction architecture is defined on the basis of the EMD theory and the error mitigation model is demonstrated as well.A standard of the scale selection for the elimination of errors,outside the model,was given in terms of the mean of the accumulated standard- ized modes.Thereafter,the scheme of the GPS baseline solution based on the EMD is suggested.The float solution residuals of the Double-Difference(DD)observation equation are used to extract the errors outside the model applied to modify the GPS DD measurements.Then the float solution was given again and the fixed solution was obtained by a Lambda algorithm.Three schemes are designed to test the proposed model and the experimental results show that the proposed model dramatically improves the reli- ability of ambiguity resolution after the elimination of errors outside the model.展开更多
Up to now there is no specification about the allowance of lateral breakthrough error for super long tunnel from 20 km to 50 km. On the basis of the design of GPS networks located outside and inside tunnel traverse ne...Up to now there is no specification about the allowance of lateral breakthrough error for super long tunnel from 20 km to 50 km. On the basis of the design of GPS networks located outside and inside tunnel traverse network, we propose a method for calculating the influence value caused by control surveying errors. Through a lot of simulative calculations and combination with piercing practice of super tunnels in Wan Jiazai Project, Shanxi province, we present an allowance table of lateral breakthrough error for super long tunnels from 20 km to 50 km.展开更多
基金Projects 40774010 supported by the National Natural Science Foundation of China20040290503 by the Research Fund for the Doctoral Program of Higher Education2006A029 by the Youth Scientific Research Foundation of China University of Mining and Technology
文摘A GPS baseline solution model is presented,based on the Empirical Mode Decomposition(EMD),which has the advan- tage of eliminating the error effects outside the model.The EMD technique is a new signal processing method for non-linear time series,which decomposes a time series into a finite and often small number of Intrinsic Mode Functions(IMFs).The decomposition procedure is adaptive and data-driven which is suitable for non-linear data series analysis.A multi-scale decomposition and recon- struction architecture is defined on the basis of the EMD theory and the error mitigation model is demonstrated as well.A standard of the scale selection for the elimination of errors,outside the model,was given in terms of the mean of the accumulated standard- ized modes.Thereafter,the scheme of the GPS baseline solution based on the EMD is suggested.The float solution residuals of the Double-Difference(DD)observation equation are used to extract the errors outside the model applied to modify the GPS DD measurements.Then the float solution was given again and the fixed solution was obtained by a Lambda algorithm.Three schemes are designed to test the proposed model and the experimental results show that the proposed model dramatically improves the reli- ability of ambiguity resolution after the elimination of errors outside the model.
文摘Up to now there is no specification about the allowance of lateral breakthrough error for super long tunnel from 20 km to 50 km. On the basis of the design of GPS networks located outside and inside tunnel traverse network, we propose a method for calculating the influence value caused by control surveying errors. Through a lot of simulative calculations and combination with piercing practice of super tunnels in Wan Jiazai Project, Shanxi province, we present an allowance table of lateral breakthrough error for super long tunnels from 20 km to 50 km.