A generalized formulation for short-term scheduling of steam power system in iron and steel industry under the time-of-use(TOU)power price was presented,with minimization of total operational cost including fuel cos...A generalized formulation for short-term scheduling of steam power system in iron and steel industry under the time-of-use(TOU)power price was presented,with minimization of total operational cost including fuel cost,equipment maintenance cost and the charge of exchange power with main grid.The model took into account the varying nature of surplus byproduct gas flows,several practical technical constraints and the impact of TOU power price.All major types of utility equipments,involving boilers,steam turbines,combined heat and power(CHP)units,and waste heat and energy recovery generators(WHERG),were separately modeled using thermodynamic balance equations and regression method.In order to solve this complex nonlinear optimization model,a new improved particle swarm optimization(IPSO)algorithm was proposed by incorporating time-variant parameters,a selfadaptive mutation scheme and efficient constraint handling strategies.Finally,a case study for a real industrial example was used for illustrating the model and validating the effectiveness of the proposed approach.展开更多
This paper presents the improved design of a 25 MW gas turbine power plant at Omoku in the Niger Delta area of Nigeria, using combined cycle application. It entails retrofitting a steam bottoming plant to the existing...This paper presents the improved design of a 25 MW gas turbine power plant at Omoku in the Niger Delta area of Nigeria, using combined cycle application. It entails retrofitting a steam bottoming plant to the existing 25 MW gas turbine plant by incorporating a heat recovery steam generator. The focus is to improve performance as well as reduction in total emission to the environment. Direct data collection was performed from the HMI monitoring screen, log books and manufacturer’s manual. Employing the application of MATLAB, the thermodynamics equations were modeled and appropriate parameters of the various components of the steam turbine power plant were determined. The results show that the combined cycle system had a total power output of 37.9 MW, made up of 25.0 MW from the gas turbine power plant and 12.9 MW (an increase of about 51%) from the steam turbine plant, having an HRSG, condenser and feed pump capacities of 42.46 MW, 29.61 MW and 1.76 MW respectively. The condenser cooling water parameters include a mass flow of 1180.42 kg/s, inlet and outlet temperatures of 29.8°C and 35.8°C respectively. The cycle efficiency of the dry mode gas turbine was 26.6% whereas, after modification, the combined cycle power plant overall efficiency is 48.8% (about 84% increases). Hence, SIEMENS steam turbine product of MODEL: SST-150 was recommended as the steam bottoming plant. Also the work reveals that a heat flow of about 42.46 MW which was otherwise being wasted in the exhaust gas of the 25 MW gas turbine power plant could be converted to 12.9 MW of electric power, thus reducing the total emission to the environment.展开更多
A 320 MW old steam power plant has been chosen for repowering in this paper. Considering the technical conditions and working life of the power plant, the full repowering method has been selected from different repowe...A 320 MW old steam power plant has been chosen for repowering in this paper. Considering the technical conditions and working life of the power plant, the full repowering method has been selected from different repowering methods. The power plant repower- ing has been analyzed for three different feed water flow rates: a flow rate equal to the flow rate at the condenser exit in the original plant when it works at nominal load, a flow rate at maximum load, and a flow rate when all the extractions are blocked. For each flow rates, two types of gas turbines have been examined: V94.2 and V94.3A. The effect of a duct burner has then been investigated in each of the above six cases. Steam is produced by a double- pressure heat recovery steam generator (HRSG) with reheat which obtains its required heat from the exhaust gases coming from the gas turbines. The results obtained from modeling and analyzing the energy-exergy of the original steam power plant and the repowered power plant indicate that the maximum efficiency of the repowered power plant is 52.04%. This maximum efficiency occurs when utilizing two V94.3A gas turbines without duct burner in the steam flow rate of the nominal load.展开更多
Maintenance scheduling and asset management practices play an important role in power systems,specifically in power generating plants.This paper presents a novel riskbased framework for a criticality assessment of pla...Maintenance scheduling and asset management practices play an important role in power systems,specifically in power generating plants.This paper presents a novel riskbased framework for a criticality assessment of plant components as a means to conduct more focused maintenance activities.Critical components in power plants that influence overall system performance are identified by quantifying their failure impact on system reliability,electric safety,cost,and the environment.Prioritization of plant components according to the proposed risk-based method ensures that the most effective and techno-economic investment decisions are implemented.This,in turn,helps to initiate modern maintenance approaches,such as reliability-centered maintenance(RCM).The proposed method is applied to a real combined cycle power plant(CCPP)in Iran,composed of two gas turbine power plants(GTPP)and one steam turbine power plant(STPP).The results demonstrate the practicality and applicability of the presented approach in real world practices.展开更多
基金Sponsored by National Natural Science Foundation of China(51304053)International Science and Technology Cooperation Program of China(2013DFA10810)
文摘A generalized formulation for short-term scheduling of steam power system in iron and steel industry under the time-of-use(TOU)power price was presented,with minimization of total operational cost including fuel cost,equipment maintenance cost and the charge of exchange power with main grid.The model took into account the varying nature of surplus byproduct gas flows,several practical technical constraints and the impact of TOU power price.All major types of utility equipments,involving boilers,steam turbines,combined heat and power(CHP)units,and waste heat and energy recovery generators(WHERG),were separately modeled using thermodynamic balance equations and regression method.In order to solve this complex nonlinear optimization model,a new improved particle swarm optimization(IPSO)algorithm was proposed by incorporating time-variant parameters,a selfadaptive mutation scheme and efficient constraint handling strategies.Finally,a case study for a real industrial example was used for illustrating the model and validating the effectiveness of the proposed approach.
文摘This paper presents the improved design of a 25 MW gas turbine power plant at Omoku in the Niger Delta area of Nigeria, using combined cycle application. It entails retrofitting a steam bottoming plant to the existing 25 MW gas turbine plant by incorporating a heat recovery steam generator. The focus is to improve performance as well as reduction in total emission to the environment. Direct data collection was performed from the HMI monitoring screen, log books and manufacturer’s manual. Employing the application of MATLAB, the thermodynamics equations were modeled and appropriate parameters of the various components of the steam turbine power plant were determined. The results show that the combined cycle system had a total power output of 37.9 MW, made up of 25.0 MW from the gas turbine power plant and 12.9 MW (an increase of about 51%) from the steam turbine plant, having an HRSG, condenser and feed pump capacities of 42.46 MW, 29.61 MW and 1.76 MW respectively. The condenser cooling water parameters include a mass flow of 1180.42 kg/s, inlet and outlet temperatures of 29.8°C and 35.8°C respectively. The cycle efficiency of the dry mode gas turbine was 26.6% whereas, after modification, the combined cycle power plant overall efficiency is 48.8% (about 84% increases). Hence, SIEMENS steam turbine product of MODEL: SST-150 was recommended as the steam bottoming plant. Also the work reveals that a heat flow of about 42.46 MW which was otherwise being wasted in the exhaust gas of the 25 MW gas turbine power plant could be converted to 12.9 MW of electric power, thus reducing the total emission to the environment.
文摘A 320 MW old steam power plant has been chosen for repowering in this paper. Considering the technical conditions and working life of the power plant, the full repowering method has been selected from different repowering methods. The power plant repower- ing has been analyzed for three different feed water flow rates: a flow rate equal to the flow rate at the condenser exit in the original plant when it works at nominal load, a flow rate at maximum load, and a flow rate when all the extractions are blocked. For each flow rates, two types of gas turbines have been examined: V94.2 and V94.3A. The effect of a duct burner has then been investigated in each of the above six cases. Steam is produced by a double- pressure heat recovery steam generator (HRSG) with reheat which obtains its required heat from the exhaust gases coming from the gas turbines. The results obtained from modeling and analyzing the energy-exergy of the original steam power plant and the repowered power plant indicate that the maximum efficiency of the repowered power plant is 52.04%. This maximum efficiency occurs when utilizing two V94.3A gas turbines without duct burner in the steam flow rate of the nominal load.
文摘Maintenance scheduling and asset management practices play an important role in power systems,specifically in power generating plants.This paper presents a novel riskbased framework for a criticality assessment of plant components as a means to conduct more focused maintenance activities.Critical components in power plants that influence overall system performance are identified by quantifying their failure impact on system reliability,electric safety,cost,and the environment.Prioritization of plant components according to the proposed risk-based method ensures that the most effective and techno-economic investment decisions are implemented.This,in turn,helps to initiate modern maintenance approaches,such as reliability-centered maintenance(RCM).The proposed method is applied to a real combined cycle power plant(CCPP)in Iran,composed of two gas turbine power plants(GTPP)and one steam turbine power plant(STPP).The results demonstrate the practicality and applicability of the presented approach in real world practices.