期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Manned Testing of the Diver Gas Recovery Installation
1
作者 Mao Fangguan , Lu Shunchang Luo Ruiren Senior Engineer, Naval Medical Research Institute, P. L. A. of China, Shanghai, 200433 Senior Engineer, Navigation Guarantee Department of Navy Headquaters, Shanghai 《China Ocean Engineering》 SCIE EI 1995年第4期465-470,共6页
The Diver Gas Recovery Installation (DGRI) was evaluated at 80 msw saturation - 100 msw excursion diving on HeO2 in the Naval Medical Research Institute (NMRI) of China in April, 1995. The diving depth, lockout time, ... The Diver Gas Recovery Installation (DGRI) was evaluated at 80 msw saturation - 100 msw excursion diving on HeO2 in the Naval Medical Research Institute (NMRI) of China in April, 1995. The diving depth, lockout time, breathing gas flow rate and consumption, inspired oxygen partial pressure (PO2) and carbon dioxide partial pressure (PCO2) were monitored. The results indicated that PO2 was controlled to fluctuate from 64.3 to 84.0 kPa and PCO2 went up from 0.01 kPa up to O.I kPa during 4 hours excursion diving; recovery of breathing gas reached 95%; three divers felt well and breathed comfortably during simulating heavy work. The test showed that it met desired performance goals. The DGRI is a kind of important equipment for long duration deep dive. It enables the gases exhaled by the divers to be re-cycled, and therefore it has great social, military and economic significance for diving operation and submarine rescue. 展开更多
关键词 diver gas recovery installation manned testing saturation diving
下载PDF
Installed capacity of coal seam gas power generation exceeds 480 MW under SGCC's coverage
2
《Electricity》 2009年第4期51-,共1页
The journalist learned from the "National Gas Security Working Conference" held recently that the coal seam gas power generation has been rapidly developed in recent years.As of July 2009,within the SGCC'... The journalist learned from the "National Gas Security Working Conference" held recently that the coal seam gas power generation has been rapidly developed in recent years.As of July 2009,within the SGCC's business area,the power generation 展开更多
关键词 Installed capacity of coal seam gas power generation exceeds 480 MW under SGCC’s coverage
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部