To deal with the exploitation difficulties of gas fields in Northeast Sichuan with deep marine strata, after researching the relative standards domestic and abroad extensively, summarizing and promoting the successful...To deal with the exploitation difficulties of gas fields in Northeast Sichuan with deep marine strata, after researching the relative standards domestic and abroad extensively, summarizing and promoting the successful experiences and failure lessons of project construction technology application scientifically, Sinopec has established an integrated technical standard system for the exploration and development of ultra deep and high sour gas fields. The system consists of 51 enterprise standards and covers 7 professions including geophysical prospecting, drilling, drilling log, well logging, gas formation test and production, sour gas gathering and transferring system, and HSE (health,safety,environment). It guides and guarantees the safe, high-quality and high-efficiency project construction effectively by means of enhancing the engineering design criterion, recommending the data processing and interpretation methods, identifying the requirements of operation and field inspection and standardizing the application of technical equipments.展开更多
文摘To deal with the exploitation difficulties of gas fields in Northeast Sichuan with deep marine strata, after researching the relative standards domestic and abroad extensively, summarizing and promoting the successful experiences and failure lessons of project construction technology application scientifically, Sinopec has established an integrated technical standard system for the exploration and development of ultra deep and high sour gas fields. The system consists of 51 enterprise standards and covers 7 professions including geophysical prospecting, drilling, drilling log, well logging, gas formation test and production, sour gas gathering and transferring system, and HSE (health,safety,environment). It guides and guarantees the safe, high-quality and high-efficiency project construction effectively by means of enhancing the engineering design criterion, recommending the data processing and interpretation methods, identifying the requirements of operation and field inspection and standardizing the application of technical equipments.