EPC general contract project includes design, procurement, construction and other links. The quota design in the design link is the first procedure of EPC general contract project. It is a major measure of cost contro...EPC general contract project includes design, procurement, construction and other links. The quota design in the design link is the first procedure of EPC general contract project. It is a major measure of cost control in the design stage, and also the key to control investment and determine the success or failure of the whole project, playing a crucial role in the whole project. By analyzing the role of quota design in EPC general contract project and related control means and determining the target value from the quota design, the design is constantly improved and optimized in each stage to avoid investment risks and misunderstandings, and the effectiveness of quota design in the whole EPC general contract project is effectively improved to increase its internal application value and comprehensively improve the level of project investment control and management, thereby consolidating the core competitiveness of EPC general contract project in the whole market competition.展开更多
The general contracts of Fuqing and Fangjiashannuclear power projects affiliated to CNNC were signedon April 30th. It is the first time for CNNC to developnuclear power projects by EPC contracts includingdesign, purch...The general contracts of Fuqing and Fangjiashannuclear power projects affiliated to CNNC were signedon April 30th. It is the first time for CNNC to developnuclear power projects by EPC contracts includingdesign, purchasing and construction.Fuqing nuclear power project is located in展开更多
Complex integrity is one of the main characteristics of infrastructure mega-projects(IMPs). Cost,technology, risk, duration, environmental impact, and other uncertain complexities are interrelated and constitute a cha...Complex integrity is one of the main characteristics of infrastructure mega-projects(IMPs). Cost,technology, risk, duration, environmental impact, and other uncertain complexities are interrelated and constitute a challenging and complex management problem. At present, there is no unified understanding of or solutions to these complex integrity problems. This study analyzes the complex integrity of the island-tunnel subproject of the Hong Kong-Zhuhai-Macao Bridge(HZMB) project and proposes an improved design-build(DB) mode in which the owner provides a preliminary design and has the right to form and manage consortium. This improved DB mode creatively degrades the special complexities that arise from multiple dimensions. On this basis, it is an efficacious way to grasp the main contradictions, integrate the effective resources, and degrade the complex integrity in multiple dimensions and at multiple levels so as to effectively deal with the complexity management of IMPs.展开更多
文摘EPC general contract project includes design, procurement, construction and other links. The quota design in the design link is the first procedure of EPC general contract project. It is a major measure of cost control in the design stage, and also the key to control investment and determine the success or failure of the whole project, playing a crucial role in the whole project. By analyzing the role of quota design in EPC general contract project and related control means and determining the target value from the quota design, the design is constantly improved and optimized in each stage to avoid investment risks and misunderstandings, and the effectiveness of quota design in the whole EPC general contract project is effectively improved to increase its internal application value and comprehensively improve the level of project investment control and management, thereby consolidating the core competitiveness of EPC general contract project in the whole market competition.
文摘The general contracts of Fuqing and Fangjiashannuclear power projects affiliated to CNNC were signedon April 30th. It is the first time for CNNC to developnuclear power projects by EPC contracts includingdesign, purchasing and construction.Fuqing nuclear power project is located in
基金funded by the National Natural Science Foundation of China(Grant Nos.71390520,71390521,71271107,91646123,71671088)Key Laboratory for Public Projects Audit of Jiangsu Province,P.R.China(GGSS2016-12)
文摘Complex integrity is one of the main characteristics of infrastructure mega-projects(IMPs). Cost,technology, risk, duration, environmental impact, and other uncertain complexities are interrelated and constitute a challenging and complex management problem. At present, there is no unified understanding of or solutions to these complex integrity problems. This study analyzes the complex integrity of the island-tunnel subproject of the Hong Kong-Zhuhai-Macao Bridge(HZMB) project and proposes an improved design-build(DB) mode in which the owner provides a preliminary design and has the right to form and manage consortium. This improved DB mode creatively degrades the special complexities that arise from multiple dimensions. On this basis, it is an efficacious way to grasp the main contradictions, integrate the effective resources, and degrade the complex integrity in multiple dimensions and at multiple levels so as to effectively deal with the complexity management of IMPs.