期刊文献+
共找到7篇文章
< 1 >
每页显示 20 50 100
Method of Evaluating Social Benefit of Energy-Conservation Based Generation Dispatching in Guangdong Province
1
作者 Luo Xiaoming1, Xu Wei2 1. Guangdong Provincial Electric Power Dispatching Center 2. Central China Electric Power Dispatching and Communication Center 《Electricity》 2011年第1期19-23,共5页
Energy-conservation based generation dispatching is the revolutionary change in operation mode which could reduce energy consumption and pollutant emissions, promote power industry restructuring, and achieve sustainab... Energy-conservation based generation dispatching is the revolutionary change in operation mode which could reduce energy consumption and pollutant emissions, promote power industry restructuring, and achieve sustainable development. Social benefit evaluation of the energy-conservation based generation dispatching under the new situation and environment has come into being as an important theoretical issue. A new scenario analysis based social benefit evluating method, which is implemented by comparing the energy., consumption and pollutant emissions of different scenarios defined by the key indicators, i.e., load factor and coal consumption structure, is proposed in the paper. Then the composition of social benefit is analyzed from the point of the dispatching mode and the coal consumption structure. The method proposed is of clear physical meaning. It is not only practical, but also applicable for the implementation of energy-conservation based generation dispatching in diffferent phases and with different goals. 展开更多
关键词 energy-conservation based generation dispatching social benefit power system EVALUATION
下载PDF
Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm 被引量:2
2
作者 Wei XIE Chang-ming JI +1 位作者 Zi-jun YANG Xiao-xing ZHANG 《Water Science and Engineering》 EI CAS 2012年第1期46-58,共13页
Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity... Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching. 展开更多
关键词 scheduling rule short-time power generation dispatching hybrid algorithm cascade hydropower station
下载PDF
Influences of uncertainties to the generation feasible region for medium- and long-term electricity transaction
3
作者 Yuyun Yang Zhenfei Tan +5 位作者 Zhilin Jiang Jun Yao Xingqiang Wang Mingyuan Wang Yan Xie Zhiyun Hu 《Global Energy Interconnection》 CAS 2020年第6期595-604,共10页
For the implementation of power market in China,medium-and Iong-term security checks are essential for bilateral transactions,of which the electricity quantity that constitutes the generation feasible region(GFR)is th... For the implementation of power market in China,medium-and Iong-term security checks are essential for bilateral transactions,of which the electricity quantity that constitutes the generation feasible region(GFR)is the target.However,uncertainties from load forecasting errors and transmission contingencies are threats to medium-and Iong-term electricity tradi ng in terms of their in flue nces on the GFR.In this paper,we prese nt a graphic distortio n pattern in a typical threegenerator system using the Monte Carlo method and projection theory based on security constrained economic dispatch.The underlying potential risk to GFR from uncertainties is clearly visualized,and their impact characteristics are discussed.A case study on detailed GFR distortion was included to dem on strate the effectiveness of this visualization model.The result implies that a small uncertainty could distort the GFR to a remarkable extent and that different line-contingency precipitates disparate the GFR distortion patterns,thereby eliciting great emphasis on load forecasting and line reliability in electricity transacti ons. 展开更多
关键词 Data visualization Electricity trading Forecasting uncertainty Load forecasting Power generation dispatch
下载PDF
Simulation Analysis for Massive Deployment of Variable Renewables Employing an Optimal Power Generation Mix Model
4
作者 Ryoichi Komiyama Saeko Shibata Yasumasa Fujii 《Journal of Energy and Power Engineering》 2013年第8期1604-1615,共12页
This paper develops a high time-resolution optimal power generation mix model in its time resolution of 10 minutes on 365 days by linear programming technique. The model allows us to analyse the massive deployment of ... This paper develops a high time-resolution optimal power generation mix model in its time resolution of 10 minutes on 365 days by linear programming technique. The model allows us to analyse the massive deployment of photovoltaic system and wind power generation in power system explicitly considering those short-term output variation. PV (photovoltaic) and wind output are estimated, employing meteorological database. Simulation results reveal that variable fluctuation derived from a high penetration level of those renewables is controlled by quick load following operation of natural gas combined cycle power plant, pumped-storage hydro power, stationary NAS (sodium and sulfur) battery and the output suppression control of PV and wind. It additionally turns out that the operational configuration of those technologies for the renewable variability differs significantly depending on those renewable output variations in each season and solving the seasonal electricity imbalance as well as the daily imbalance is important if variable renewables are massively deployed. 展开更多
关键词 BATTERIES power generation dispatch power generation planning power system economics power system simulation solar power generation wind power generation.
下载PDF
Smart Grid in CSG:Direction and Field
5
作者 Jing Yong China Southern Power Grid Corporation Liu Jing 《Electricity》 2011年第1期16-18,共3页
After describing the general situation of China Southern Power Grid (CSG), this article expounds the necessity for CSG to carry out the program of smart grid, and points out the favorable conditions and the key fields... After describing the general situation of China Southern Power Grid (CSG), this article expounds the necessity for CSG to carry out the program of smart grid, and points out the favorable conditions and the key fields to develop smart grid. It also puts forward near-term emphases, and gives relevant suggestions. 展开更多
关键词 smart grid generation dispatch integration of distributed power sources
下载PDF
Research on large-scale dispatchable grid-connected PV systems 被引量:12
6
作者 Xiaonan HAN Xin AI Yingyun SUN 《Journal of Modern Power Systems and Clean Energy》 SCIE EI 2014年第1期69-76,共8页
This paper describes the research on a largescale dispatchable grid-connected photovoltaic(PV)system for supplying power to the grid for dispatch instead of supplying the electricity to a local load.In order to maximi... This paper describes the research on a largescale dispatchable grid-connected photovoltaic(PV)system for supplying power to the grid for dispatch instead of supplying the electricity to a local load.In order to maximise the value of the solar energy,a hybrid electricity storage consisting of batteries and supercapacitors is used with the PV system.This paper proposes a control strategy focusing on theDCpower at theDClink rather than at the grid-connected inverter.Two typical sets of real data,collected from existing sites,are used to demonstrate the practicality of the system.Finally,the simulation results are used to demonstrate the good performance and feasibility of the proposed system together with the proposed control strategy. 展开更多
关键词 Large-scale PV system Dispatchable generation Centralized grid-connected BATTERY SUPERCAPACITOR
原文传递
Real-time AGC dispatch units considering wind power and ramping capacity of thermal units 被引量:4
7
作者 Jingyi ZHANG Chao LU +1 位作者 Jie SONG Junbo ZHANG 《Journal of Modern Power Systems and Clean Energy》 SCIE EI 2015年第3期353-360,共8页
The high penetration of wind energy sources in power systems has substantially increased the demand for faster-ramping thermal units participating in the frequency regulation service.To fulfill the automatic generatio... The high penetration of wind energy sources in power systems has substantially increased the demand for faster-ramping thermal units participating in the frequency regulation service.To fulfill the automatic generation control(AGC)and compensate the influence of wind power fluctuations simultaneously,ramping capacity should be considered in the dispatch model of thermals.Meanwhile,conventional methods in this area do not take the impact of transmission loss into the dispatch model,or rely on offline network model and parameters,failing to reflect the real relationships between the wind farms and thermal generators.This paper proposes an online approach for AGC dispatch units considering the above issues.Firstly,the power loss sensitivity is online identified using recursive least square method based on the real-time data of phasor measurement units.It sets up power balance constraint and results in a more accurate dispatch model.Then,an improved multi-objective optimization model of dispatch is proposed and a connection is established between the thermal units with fast ramping capacity and the wind farms with rapid fluctuations.Genetic algorithm is used to solve the dispatch model.The proposed method is compared with conventional methods in simulation case in the IEEE 30-bus system.Finally,simulation results verify the validity and the feasibility of identification method and optimization model. 展开更多
关键词 Ramping capacity Loss sensitivity Automatic generation control(AGC)optimal dispatch On-line identification Genetic algorithm
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部