As a result of the high economic growth in GMS (Greater Mekong Sub-region) countries, bank branches have now expanded at high rate. The expansion of new buildings, however, has not considered energy, especially ligh...As a result of the high economic growth in GMS (Greater Mekong Sub-region) countries, bank branches have now expanded at high rate. The expansion of new buildings, however, has not considered energy, especially lighting system, in the design stage. This paper presents the optimal energy management design of lighting system for the bank buildings in the countries along Mekong River, namely China, Vietnam, Cambodia, Myanmar, Laos and Thailand. The lighting system is considered in the study as most of the countries use T8 fluorescent luminaires. The LCC (life cycle cost) method has been considered for the installation and operational cost. The assumed benefit-cost ratio analysis comprises of the lifetime cycle, price of fluorescent lamps, electricity unit price, operating times and hours of lighting bulb. The T8 fluorescent luminaires with low watt loss ballast are compared with T5 fluorescent luminaires and LED lamps. Electricity rates and the cost of the investment are considered to determine the suitable selection of the lighting system in each GMS country.展开更多
Based on stakeholder analysis, this paper analyzed influence of stakehold- ers on construction and operation of agricultural information network (AIN) in the Greater Mekong Sub-region (GMS). It elaborated and anal...Based on stakeholder analysis, this paper analyzed influence of stakehold- ers on construction and operation of agricultural information network (AIN) in the Greater Mekong Sub-region (GMS). It elaborated and analyzed stakeholders such as China, Asian Development Bank, other GMS state government agricultural depart- ments and users. Finally, it came up with pertinent recommendations for develop- ment of GMS-AIN.展开更多
文摘As a result of the high economic growth in GMS (Greater Mekong Sub-region) countries, bank branches have now expanded at high rate. The expansion of new buildings, however, has not considered energy, especially lighting system, in the design stage. This paper presents the optimal energy management design of lighting system for the bank buildings in the countries along Mekong River, namely China, Vietnam, Cambodia, Myanmar, Laos and Thailand. The lighting system is considered in the study as most of the countries use T8 fluorescent luminaires. The LCC (life cycle cost) method has been considered for the installation and operational cost. The assumed benefit-cost ratio analysis comprises of the lifetime cycle, price of fluorescent lamps, electricity unit price, operating times and hours of lighting bulb. The T8 fluorescent luminaires with low watt loss ballast are compared with T5 fluorescent luminaires and LED lamps. Electricity rates and the cost of the investment are considered to determine the suitable selection of the lighting system in each GMS country.
文摘Based on stakeholder analysis, this paper analyzed influence of stakehold- ers on construction and operation of agricultural information network (AIN) in the Greater Mekong Sub-region (GMS). It elaborated and analyzed stakeholders such as China, Asian Development Bank, other GMS state government agricultural depart- ments and users. Finally, it came up with pertinent recommendations for develop- ment of GMS-AIN.