期刊文献+
共找到676篇文章
< 1 2 34 >
每页显示 20 50 100
Numerical solution for dynamics of pneumatic DTH hammer system 被引量:2
1
作者 QU Yegao,BU Changgen,LIU Baolin,Lian Yinjun(China University of Geosciences,Beijing 100083,China) 《探矿工程(岩土钻掘工程)》 2009年第S1期170-176,共7页
The pneumatic down-the-hole(DTH) hammer is one of the efficient equipments used in medium hard to very hard rock drilling frield,and any change in its structure design affects all performance parameters of a pneuamtic... The pneumatic down-the-hole(DTH) hammer is one of the efficient equipments used in medium hard to very hard rock drilling frield,and any change in its structure design affects all performance parameters of a pneuamtic DTH hammer directly.Yet,owing to the complexity of the dynamic interaction among the components in DTH hammer systems,until now it has been difficult to obtain reliable estimates of the design parameter affects.Thus providing an design parameter optimization and the layout of dynamics behavior of DTH hammer is of great importance.This paper documents the development and solution of a computational model for the dynamic response of a pneumatic DTH hammer.The model consists of rigid piston dynamics equation and chamber thermodynamics equations.The resulting model represented by a set of coupled nonlinear differential equations were computed in Visual C++ program.The developed solutions are used to perform a parametric study to illustrate the inffluence of the piston mass and supply pressure on the impact performance of DTH hammer system. 展开更多
关键词 simulation Impact down-the-hole(DTH) hammer
下载PDF
Structure Parameters Optimization Analysis of Hydraulic Hammer System 被引量:1
2
作者 Guoping Yang Jian Fang 《Modern Mechanical Engineering》 2012年第4期137-142,共6页
In order to improve the impact performance, the structure of hydraulic hammer should be optimized. In this paper, the ranges of eight vital structure parameters of piston and reversing valve system of hydraulic hammer... In order to improve the impact performance, the structure of hydraulic hammer should be optimized. In this paper, the ranges of eight vital structure parameters of piston and reversing valve system of hydraulic hammer were selected firstly;and then found the best value of different parameters under experiments with the method of computer optimization and the parametric analysis method provided by ADAMS software. These methods worked and the best design values of parameters of hydraulic hammer were obtained. At last, the optimal impact energy of virtual prototype of hydraulic breaking hammer was calculated and compared with the original impact performance. The results reveal that impact performance of hydraulic hammer has been improved significantly. 展开更多
关键词 HYDRAULIC hammer STRUCTURE PARAMETERS Optimization Analysis IMPACT Performance ADAMS
下载PDF
Water hammer protection for diversion systems in front of pumps in long-distance water supply projects 被引量:3
3
作者 Lin Shi Jian Zhang +3 位作者 Xiao-dong Yu Sheng Chen Wen-long Zhao Xu-yun Chen 《Water Science and Engineering》 EI CAS CSCD 2023年第2期211-218,共8页
For a water supply system with long-distance diversion pipelines, in addition to the water hammer problems that occur beyond pumps, the safety of the water diversion pipeline in front of pumps also deserves attention.... For a water supply system with long-distance diversion pipelines, in addition to the water hammer problems that occur beyond pumps, the safety of the water diversion pipeline in front of pumps also deserves attention. In this study, a water hammer protection scheme combined with an overflow surge tank and a regulating valve was developed. A mathematical model of the overflow surge tank was developed, and an analytical formula for the height of the overflow surge tank was derived. Furthermore, a practical water supply project was used to evaluate the feasibility of the combined protection scheme and analyze the sensitivity of valve regulation rules. The results showed that the combined protection scheme effectively reduced the height of the surge tank, lessened the difficulties related to construction, and reduced the necessary financial investment for the project. The two-stage closing rule articulated as fast first and then slow could minimize the overflow volume of the surge tank when the power failure occurred, while the two-stage opening rule articulated as slow first and then fast could be more conducive to the safety of the water supply system when the pump started up. 展开更多
关键词 Long-distance diversion pipeline Water supply Water hammer Overflow surge tank Regulating valve
下载PDF
Digital monitoring of rotary-percussive drilling with down-the-hole hammer for profiling weathered granitic ground
4
作者 Wendal Victor Yue Siyuan Wu +2 位作者 Manchao He Yafei Qiao Zhongqi Quentin Yue 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第5期1615-1636,共22页
Rock and geotechnical engineering investigations involve drilling holes in ground with or without retrieving soil and rock samples to construct the subsurface ground profile.On the basis of an actual soil nailing dril... Rock and geotechnical engineering investigations involve drilling holes in ground with or without retrieving soil and rock samples to construct the subsurface ground profile.On the basis of an actual soil nailing drilling for a slope stability project in Hong Kong,this paper further develops the drilling process monitoring(DPM)method for digitally profiling the subsurface geomaterials of weathered granitic rocks using a compressed airflow driven percussive-rotary drilling machine with down-the-hole(DTH)hammer.Seven transducers are installed on the drilling machine and record the chuck displacement,DTH rotational speed,and five pressures from five compressed airflows in real-time series.The mechanism and operations of the drilling machine are elaborated in detail,which is essential for understanding and evaluating the drilling data.A MATLAB program is developed to automatically filter the recorded drilling data in time series and classify them into different drilling processes in sub-time series.These processes include penetration,push-in with or without rod,pull-back with or without rod,rod-tightening and rod-untightening.The drilling data are further reconstructed to plot the curve of drill-bit depth versus the net drilling time along each of the six drillholes.Each curve is found to contain multiple linear segments with a constant penetration rate,which implies a zone of homogenous geomaterial with different weathering grades.The effect from fluctuation of the applied pressures is evaluated quantitatively.Detailed analyses are presented for accurately assess and verify the underground profiling and strength in weathered granitic rock,which provided the basis of using DPM method to confidently assess drilling measurements to interpret the subsurface profile in real time. 展开更多
关键词 Drilling process monitoring(DPM) Down-the-hole(DTH)hammer Percussive-rotary drilling Weathering granitic rocks
下载PDF
基于Bently-Hammer软件的长距离输水管道水锤防护模拟
5
作者 文思齐 蒋羚鏴 +1 位作者 曾诗 瞿露 《科学技术创新》 2024年第4期110-113,共4页
基于Bently-Hammer软件对某实际工程中长距离输水系统进行建模,通过实际运行中的不同工况,模拟突发事件在管道与水泵间产生的水锤影响,同时针对系统内突发事件增加液压气动罐、缓闭止回阀等水锤消除措施加以改进,为实际工程提供有效抑... 基于Bently-Hammer软件对某实际工程中长距离输水系统进行建模,通过实际运行中的不同工况,模拟突发事件在管道与水泵间产生的水锤影响,同时针对系统内突发事件增加液压气动罐、缓闭止回阀等水锤消除措施加以改进,为实际工程提供有效抑制水锤破坏的技术保障。 展开更多
关键词 长距离输水 水锤防护 水锤计算 Bentley hammer
下载PDF
基于Bentley Hammer的长距离有压管道输水工程的水锤防护研究
6
作者 丁家乐 杨明伟 《河南科技》 2024年第5期32-38,共7页
【目的】在长距离有压管道输水工程中,因管道内部水流条件复杂而容易产生水锤现象,不仅会影响水流正常输送,还可能导致管道破裂。因此,有必要进行长距离有压管道输水工程的水锤防护研究。【方法】基于台前县城乡供水一体化南水北调配套... 【目的】在长距离有压管道输水工程中,因管道内部水流条件复杂而容易产生水锤现象,不仅会影响水流正常输送,还可能导致管道破裂。因此,有必要进行长距离有压管道输水工程的水锤防护研究。【方法】基于台前县城乡供水一体化南水北调配套工程,通过Bentley Hammer软件,在最不利工况下分别建立三种数值模拟模型:无防护措施、加装复合式高速进排气阀水锤防护、气囊式空气罐和复合式高速进排气阀,进行联合水锤防护,对以上三种情况进行水力过渡过程数值模拟分析,研究复合式高速进排气阀与气囊式空气罐联合防护时的水锤防护效果以及气囊式空气罐的防护能力与预设压力和罐体体积之间的关系。【结果】结果表明:复合式高速进排气阀和气囊式空气罐可以很好地消除管道内水锤带来的危害,气囊式空气罐防护能力随着罐体体积和预设压力的增大而增强,罐体体积对其防护能力影响更显著。【结论】选择合理的罐体体积和预设压力可以使水锺防护发挥最好的防护效果,最大化输水工程的经济性。 展开更多
关键词 水锤 水锤防护 复合式高速进排气阀 气囊式空气罐 Bentley hammer
下载PDF
Bentley Hammer V8i软件在城乡一体化供水管道水锤计算中的应用
7
作者 宋刚 王金茂 《吉林水利》 2024年第1期42-45,共4页
应用Bentley Hammer V8i软件模拟城乡统筹供水工程中输水和配水管道的稳态工况与事故断电工况的水锤安全性,可以清楚地展示管内水流压力的变化趋势。本文以新和县城乡一体化实际供水工程为研究对象,评估其供水管网水锤安全性。模拟结果... 应用Bentley Hammer V8i软件模拟城乡统筹供水工程中输水和配水管道的稳态工况与事故断电工况的水锤安全性,可以清楚地展示管内水流压力的变化趋势。本文以新和县城乡一体化实际供水工程为研究对象,评估其供水管网水锤安全性。模拟结果显示,虽然该工程在稳态工况与事故断电情况下管道内压力会有剧烈波动,但仍在管道的承载能力之内,可以通过优化关阀时间及相关操作来确保供水的安全稳定。本应用可供类似城乡一体化供水工程管道设计参考。 展开更多
关键词 Bentley hammer V8i软件 城乡一体化供水 水锤
下载PDF
RESEARCH OF THE DYNAMIC CHARACTERISTICS ON A NEW HYDRAULIC SYSTEM OF ELECTRO-HYDRAULIC HAMMER 被引量:9
8
作者 Li Yongtang Lei Bufang Department of Mechanical Engineering,Taiyuan Heavy Machinery Institute Shi Enxiu Xi’an University of Science and Technology 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2001年第2期171-174,共4页
A new typed hydraulic system of electro hydraulic hammer is researched and developed By means of power bond graphs the modeling and simulation to the dynamic characteristics of the new hydraulic system are performed... A new typed hydraulic system of electro hydraulic hammer is researched and developed By means of power bond graphs the modeling and simulation to the dynamic characteristics of the new hydraulic system are performed The experimental research which is emphasized on the blowing stroke is also performed It is proved from the result of simulation and experiment that this new hydraulic system possesses such advantages as simplification of structure,flexibleness of operation and reliability of working Especially it possesses better dynamic characteristics 展开更多
关键词 ELECTRO hydraulic hammer Hydraulic system Dynamic characteristics SIMULATION
下载PDF
Flux Vector Splitting Schemes for Water Hammer Flows in Pumping Supply Systems with Air Vessels 被引量:1
9
作者 Qiang Sun Yuebin Wu +1 位作者 Ying Xu Tae Uk Jang 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2015年第3期69-74,共6页
To solve water hammer problems in pipeline systems,many numerical simulation approaches have been developed. This paper improves a flux vector splitting( FVS) scheme whose grid is the same as the fixedgrid MOC scheme.... To solve water hammer problems in pipeline systems,many numerical simulation approaches have been developed. This paper improves a flux vector splitting( FVS) scheme whose grid is the same as the fixedgrid MOC scheme. The proposed FVS scheme is used to analyze water hammer problems caused by a pump abrupt shutdown in a pumping system with an air vessel. This paper also proposes a pump-valve-vessel model combining a pump-valve model with an air vessel model. The results show that the data obtained by the FVS scheme are similar to the ones obtained by the fixed-grid method of characteristics( MOC). And the results using the pump-valve-vessel model are almost the same as the ones using both the pump-valve model and the air vessel model. Therefore,it is effective that the proposed FVS scheme is used to solve water hammer problems and the pump-valve-vessel model replaces both the pump-valve model and the air vessel model to simulate water hammer flows in the pumping system with the air vessel. 展开更多
关键词 water hammer method of characteristics flux vector splitting air vessel
下载PDF
FGC-15D large-diameter DTH air hammer drilling system and its application in offshore rock-socketed pile hole drilling 被引量:3
10
作者 Kun YIN Jianming PENG Maosen WANG Zhanjiang ZHOU 《Global Geology》 2006年第2期138-140,共3页
In the past two decades,numerous large-diameter rock-socketed piles were constructed in China to support foundations of skyscrapers,great bridges or to retain soil in potential geological hazard areas.However,drilling... In the past two decades,numerous large-diameter rock-socketed piles were constructed in China to support foundations of skyscrapers,great bridges or to retain soil in potential geological hazard areas.However,drilling large-diameter rock-socketed pile holes with conventional drilling method such as rotary drilling or cable tool drilling is time-consuming and the cost is usually very high.In order to drill large-diameter rock-socketed pile holes faster at relatively low cost,the FGC15A large-diameter DTH air hammer drilling system was developed in 1987 and was given the second-class award by Ministry of Geology and Mineral Resources in 1991.Since it was innovated the drilling system has been used in more than twenty important and tough projects on land,and wonderful results were acquired.At the same time the large-diameter DTH air hammer drilling system was improved continuously.The FGC15D is the latest version of the technique. 展开更多
关键词 高楼 地基 钻探系统 洞穴
下载PDF
Construction and Solution to a New Dynamic Model of Forging Hammers Damping System
11
作者 刘钢 陈维民 陈威 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 1996年第2期92-96,共5页
ConstructionandSolutiontoaNewDynamicModelofForgingHammersDampingSystem¥LIUGang;CHENWeimin;CHENWei(刘钢,陈维民,陈威)... ConstructionandSolutiontoaNewDynamicModelofForgingHammersDampingSystem¥LIUGang;CHENWeimin;CHENWei(刘钢,陈维民,陈威)(Dept.ofMaterialS... 展开更多
关键词 ss: FORGING hammer DAMPING system DYNAMIC MODEL
下载PDF
Selection of Hammering Sound Collection Devices for the Development of Total Hip Arthroplasty Support Systems
12
作者 Rina Sakai Katsufumi Uchiyama +6 位作者 Shun Nishizawa Tomomi Mizuhashi Takeaki Yamamoto Kazuhiro Yoshida Kensuke Fukushima Naonobu Takahira Masanobu Ujihira 《Journal of Biomedical Science and Engineering》 CAS 2022年第7期179-186,共8页
In total hip arthroplasty, intraoperative femoral fractures can be avoided by analyzing the hammering sounds from the stem inserted into the femur. This procedure is based on a hammering test that makes use of the fac... In total hip arthroplasty, intraoperative femoral fractures can be avoided by analyzing the hammering sounds from the stem inserted into the femur. This procedure is based on a hammering test that makes use of the fact that sound depends on the stability of the object. This technique is generally used in engineering. A system designed to avoid excessive stem hammering by predicting the intraoperative fracture risk based on this technique and software for real-time spectra analysis has been developed with repetitive improvements. The remaining technical challenge lies in selecting an appropriate sound collection device and building a compact and easy unit for use. This study reviewed the types of directional microphones suitable for the sound collection system to develop a practical THA support system. Four types of microphones based on selected methods were used to collect and compare the peak frequencies of the hammering sounds and make comparisons between them, and the built system was used to conduct clinical trials. For miniaturization and operational ease of the unit, plug-in unidirectional microphones are appropriate. However, no laboratory-level data has been collected, and thus, further data accumulation is necessary. 展开更多
关键词 Intraoperative Fractures Total Hip Arthroplasty hammering Sound Fourier Analysis Peak Frequency
下载PDF
Performance of large-diameter pneumatic down-the-hole (DTH) hammers: A focus on influences of the hammer structure
13
作者 Pin-Lu Cao Hong-Yu Cao +3 位作者 Jin-E Cao Cheng-Da Wen Bao-Yi Chen Shan-Shan Yao 《Petroleum Science》 SCIE EI CAS CSCD 2023年第4期2399-2412,共14页
Pneumatic down-the-hole (DTH) hammer has been extensively used in air drillings through hard and ultra-hard geological formations. Numerical modeling can offer close observation on the working behaviors by visualizing... Pneumatic down-the-hole (DTH) hammer has been extensively used in air drillings through hard and ultra-hard geological formations. Numerical modeling can offer close observation on the working behaviors by visualizing internal pressure status as well as provide reliable performance predictions for large-diameter DTH hammers to which conventional empirical and experimental approaches cannot be applied. In this study, CFD simulations coupled with dynamic meshing are utilized to simulate the air flow and piston movement inside the large-diameter DTH hammers. The numerical modeling scheme is verified against a theoretical model published in literature. Effects of structural parameters on hammer performance, including piston mass, piston upper-end diameter, piston groove diameter, and lengths of intake and exhaust stroke in both front and rear chambers, are analyzed in detail by virtue of sets of numerical simulations. The simulations suggest that changing the intake stroke of front chamber has a negligible influence on hammer performance while increasing the piston groove would lower all the four indicators of hammer performance, including impact energy, impact frequency, maximum stroke, and air consumption rate. Changing the other structural parameters demonstrates mixed effects on the performance indicators. Based on the numerical simulations, a large GQ-400 DTH hammer has been designed for reduced air consumption rate and tested in a field drilling practice. The air drilling test with the designed hammer provided a penetration rate 1.7 times faster than that of conventional mud drilling. 展开更多
关键词 Pneumatic down-the-hole(DTH)hammer Computational fluid dynamics Dynamic mesh Gas turbulent flow Piston impact performance
下载PDF
Research on Breeze Vibration Law and Modal Identification Method of Conductor Considering Anti-Vibration Hammer Damage
14
作者 Long Zhao Xudong Lu +2 位作者 Xinbo Huang Hao Yang Guoze Feng 《Structural Durability & Health Monitoring》 EI 2023年第4期283-297,共15页
In the harsh environment,the structural health of the anti-vibration hammer,which suffers from the coupled effects of corrosion and fatigue damage,is significantly reduced.As part of the conductor structure,the anti-v... In the harsh environment,the structural health of the anti-vibration hammer,which suffers from the coupled effects of corrosion and fatigue damage,is significantly reduced.As part of the conductor structure,the anti-vibration hammer is rigidly attached to the conductor,effectively suppressing conductor vibration.The conductor’s breeze vibration law and natural modal frequency are altered damage to the anti-vibration hammer structure.Through built a vibration experiment platform to simulate multiple faults such as anti-vibration hammer head drop off and position slippage,which to obtained the vibration acceleration signal of the conductor.The acceleration vibration signal is processed and analyzed in the time and frequency domains.The results are used to derive the breeze vibration law of the conductor under multiple faults and propose an anti-vibration hammer damage online monitoring technology.The results show that the vibration acceleration value and vibration intensity of the conductor are significantly increased after the anti-vibration hammer damage.The natural frequency increases for each order,with an absolute change ranging from 0.15 to 6.49 Hz.The anti-vibration hammer slipped due to a loose connection,the 1st natural frequency increases from 8.18 to 16.62 Hz.Therefore,in engineering applications,there can be no contact to determine the anti-vibration hammer damage situation by monitoring the modal natural frequency of the conductor.This is even a tiny damage that cannot be seen.This method will prevent the further expansion of the damage that can cause accidents. 展开更多
关键词 Transmission line conductor anti-vibration hammer breeze vibration modal parameter vibration characteristic
下载PDF
基于Bentley Hammer的泵站输水系统管道优化前后的水力过渡过程研究
15
作者 张勇 高余鑫 +1 位作者 高长景 高志锴 《水电能源科学》 北大核心 2023年第12期101-104,共4页
为了研究泵站输水系统管道优化前后事故停泵的水力过渡过程的特性,基于实际工程,运用Bentley Hammer软件,建立泵站输水系统双泵并联机组数学模型,研究两阶段不同关阀方案下管道优化前后对水锤压力、机组转速等最不利水锤参数的影响。结... 为了研究泵站输水系统管道优化前后事故停泵的水力过渡过程的特性,基于实际工程,运用Bentley Hammer软件,建立泵站输水系统双泵并联机组数学模型,研究两阶段不同关阀方案下管道优化前后对水锤压力、机组转速等最不利水锤参数的影响。结果表明,管道优化后最大水锤压力降低了3.76%~8.85%,最小水锤压力提升了4.89%~8.85%,最大倒转速度提高了1.47%~81.35%;快关时间对最不利水锤参数有显著影响,管道优化后泵站输水系统最不利水锤参数均比优化前提前发生。表明管道优化有效改善了泵站输水系统的水锤特性,提高了泵站输水系统的安全性。 展开更多
关键词 泵站输水系统 管道优化 水力过渡过程 Bentley hammer 水锤参数
下载PDF
长距离多支线有压输水系统起动水锤防护
16
作者 蔡付林 樊子凯 +1 位作者 周建旭 周骏 《水利水电科技进展》 CSCD 北大核心 2024年第4期1-6,共6页
为研究同时包含重力流输水管线与泵站加压提水管线的长距离多支线有压输水系统开启运行时的水锤问题,基于瞬变流分析的特征线法建立了输水系统过渡过程计算的数学模型,结合实际工程计算了输水系统开启运行时调节阀与水泵及其出口阀不同... 为研究同时包含重力流输水管线与泵站加压提水管线的长距离多支线有压输水系统开启运行时的水锤问题,基于瞬变流分析的特征线法建立了输水系统过渡过程计算的数学模型,结合实际工程计算了输水系统开启运行时调节阀与水泵及其出口阀不同的开启时间与控制策略对水锤的影响,并在此基础上提出了空气阀联合阀门开启的水锤防护方案。结果表明:采取提水泵站滞后调节阀开启运行,且各提水泵站相继开启的策略可有效改善输水系统沿线的内水压力分布;采用空气阀联合阀门开启的水锤防护方案可在不影响输水系统反应速度的情况下以较小尺寸的空气阀达到较好的水锤防护效果。 展开更多
关键词 有压输水系统 水锤 瞬变流 数值模拟
下载PDF
基于Hammer积分的三维地面磁共振高精度正演方法 被引量:3
17
作者 林君 赵越 +2 位作者 蒋川东 李同 刘孝男 《吉林大学学报(工学版)》 EI CAS CSCD 北大核心 2016年第2期609-615,共7页
为满足三维地面磁共振正演计算的精度要求,本文提出了基于非结构不均匀四面体网格的Hammer积分算法。首先利用有限元方法实现了对地下空间的三维磁场计算,完成了地面磁共振灵敏度核函数表达式的推导。针对现有地面磁共振正演方法中常规... 为满足三维地面磁共振正演计算的精度要求,本文提出了基于非结构不均匀四面体网格的Hammer积分算法。首先利用有限元方法实现了对地下空间的三维磁场计算,完成了地面磁共振灵敏度核函数表达式的推导。针对现有地面磁共振正演方法中常规网格尺寸大、计算精度差、细化网格尺寸小、但是数量大的问题,应用Hammer积分在常规网格中完成核函数的高精度计算。三维核函数和3个含水模型的正演仿真实验表明:基于Hammer积分的地面磁共振正演方法具有网格少、计算节点少、积分精度高的特点,能够高效解决核函数的正演计算问题。 展开更多
关键词 仪器仪表技术 hammer积分 地面磁共振 高精度 正演 核函数
下载PDF
有限元方法的Gauss积分和Hammer积分方案 被引量:3
18
作者 孙美玲 江山 《南通职业大学学报》 2009年第3期67-70,共4页
研究了一致网格剖分下矩形单元的Gauss数值积分和三角形单元的Hammer数值积分;再利用有限元方法求解偏微分方程,且通过非奇异问题和奇异问题的数值算例观察解的l2范数误差;进而研究单元数值积分对有限元解的精度的影响,并给出了有效且... 研究了一致网格剖分下矩形单元的Gauss数值积分和三角形单元的Hammer数值积分;再利用有限元方法求解偏微分方程,且通过非奇异问题和奇异问题的数值算例观察解的l2范数误差;进而研究单元数值积分对有限元解的精度的影响,并给出了有效且经济的数值积分方案。 展开更多
关键词 有限元方法 GAUSS积分 hammer积分 求积点
下载PDF
C92K型数控全液压模锻锤常见故障分析与维护 被引量:1
19
作者 刘军武 《锻压装备与制造技术》 2024年第1期63-68,共6页
数控全液压模锻锤是目前世界上最先进的模锻设备,既可以实现打击能量及工序的数字化控制,也可以实现自动化连线。结合对数控全液压模锻锤工作原理及结构特点,对其常见故障的排除方法及日常维护进行归纳总结。
关键词 模锻锤 数控 全液压 故障 维护
下载PDF
Aseismic performances of constrained damping lining structures made of rubber-sand-concrete
20
作者 Xiancheng Mei Qian Sheng +4 位作者 Jian Chen Zhen Cui Jianhe Li Chuanqi Li Daniel Dias 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第5期1522-1537,共16页
Flexible damping technology considering aseismic materials and aseismic structures seems be a good solution for engineering structures.In this study,a constrained damping structure for underground tunnel lining,using ... Flexible damping technology considering aseismic materials and aseismic structures seems be a good solution for engineering structures.In this study,a constrained damping structure for underground tunnel lining,using a rubber-sand-concrete(RSC)as the aseismic material,is proposed.The aseismic performances of constrained damping structure were investigated by a series of hammer impact tests.The damping layer thickness and shape effects on the aseismic performance such as effective duration and acceleration amplitude of time-domain analysis,composite loss factor and damping ratio of the transfer function analysis,and total vibration level of octave spectrum analysis were discussed.The hammer impact tests revealed that the relationship between the aseismic performance and damping layer thickness was not linear,and that the hollow damping layer had a better aseismic performance than the flat damping layer one.The aseismic performances of constrained damping structure under different seismicity magnitudes and geological conditions were investigated.The effects of the peak ground acceleration(PGA)and tunnel overburden depth on the aseismic performances such as the maximum principal stress and equivalent plastic strain(PEEQ)were discussed.The numerical results show the constrained damping structure proposed in this paper has a good aseismic performance,with PGA in the range(0.2-1.2)g and tunnel overburden depth in the range of 0-300 m. 展开更多
关键词 Constrained damping structure Aseismic performance hammer impact tests Damping layer Peak ground acceleration Overburden depth
下载PDF
上一页 1 2 34 下一页 到第
使用帮助 返回顶部