期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Application of open-pit and underground mining technology for residual coal of end slopes 被引量:9
1
作者 CHE, Zhaoxue YANG, Hong 《Mining Science and Technology》 EI CAS 2010年第2期266-270,共5页
Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining tech... Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining technology for residual coal of end slopes.In the proposal a conveyance road and ventilation conveyance near the slope are built,corresponding to the pit mining area and the surface coal mine dump,as well as an interval haulage tunnel and air-inlet tunnel.The outcome shows that such mining method may reduce the effect to slope stability from underground mining,it does not affect the dumping advance and has a high recovery rate of residual coal resources.The working face is timbered by single hydraulic props,transported by a scraper conveyor and supported by coal walls.This method of mining is one of layered top coal caving,with high resource recovery,low production cost where positive economic benefit can be realized. 展开更多
关键词 integrated open-pit and underground mining end-slope resource recovery economic benefit surface coal mine
下载PDF
Stability analysis of rib pillars in highwall mining under dynamic and static loads in open‑pit coal mine 被引量:5
2
作者 Haoshuai Wu Yanlong Chen +3 位作者 Haoyan Lv Qihang Xie Yuanguang Chen Jun Gu 《International Journal of Coal Science & Technology》 EI CAS CSCD 2022年第3期120-135,共16页
The retained coal in the end slope of an open-pit mine can be mined by the highwall mining techniques.However,the instability mechanism of the reserved rib pillar under dynamic loads of mining haul trucks and static l... The retained coal in the end slope of an open-pit mine can be mined by the highwall mining techniques.However,the instability mechanism of the reserved rib pillar under dynamic loads of mining haul trucks and static loads of the overlying strata is not clear,which restricts the safe and efcient application of highwall mining.In this study,the load-bearing model of the rib pillar in highwall mining was established,the cusp catastrophe theory and the safety coefcient of the rib pillar were considered,and the criterion equations of the rib pillar stability were proposed.Based on the limit equilibrium theory,the limit stress of the rib pillar was analyzed,and the calculation equations of plastic zone width of the rib pillar in highwall mining were obtained.Based on the Winkler foundation beam theory,the elastic foundation beam model composed of the rib pillar and roof under the highwall mining was established,and the calculation equations for the compression of the rib pillar under dynamic and static loads were developed.The results showed that with the increase of the rib pillar width,the total compression of the rib pillar under dynamic and static loads decreases nonlinearly,and the compression of the rib pillar caused by static loads of the overlying strata and trucks has a decisive role.Numerical simulation and theoretical calculation were also performed in this study.In the numerical simulation,the coal seam with a buried depth of 122 m and a thickness of 3 m is mined by highwall mining techniques.According to the established rib pillar instability model of the highwall mining system,it is found that when the mining opening width is 3 m,the reasonable width of the rib pillar is at least 1.3 m,and the safety factor of the rib pillar is 1.3.The numerical simulation results are in good agreement with the results of theoretical calculation,which verifes the feasibility of the theoretical analysis of the rib pillar stability.This research provides a reference for the stability analysis of rib pillars under highwall mining. 展开更多
关键词 open-pit coal mine Dynamic and static loads Highwall mining Rib pillar Catastrophe instability
下载PDF
哈尔乌素露天煤矿绿色节能矿山建设策略与实践
3
作者 苏二换 王晓东 +2 位作者 张禹 郝培田 贺喜 《中国煤炭》 2023年第S01期24-28,共5页
阐述了国能准能集团哈尔乌素露天煤矿基于黄土高原原始地貌土体构成特性,在肩负煤炭生产保供重任同时,通过制定具有自身特色的绿色矿山建设策略,进行露天煤矿采区生态修复美化的具体实践。其构建起集水土流失控制技术、生态重构技术、... 阐述了国能准能集团哈尔乌素露天煤矿基于黄土高原原始地貌土体构成特性,在肩负煤炭生产保供重任同时,通过制定具有自身特色的绿色矿山建设策略,进行露天煤矿采区生态修复美化的具体实践。其构建起集水土流失控制技术、生态重构技术、复垦绿化标准化作业技术于一体的排土场复垦区治理体系,累计实现复垦绿化土地共683.1 ha,植被盖度提升55%。同时,基于煤矿智能化建设和维护职工职业健康目标出发,通过推进主采系统与生产辅助设备的智能化与无人化,极大地改善了作业人员的工作环境,从源头上隔绝了尘肺病等职业性呼吸系统疾病的发生。在节能减排方面,通过科学管理和精细化管理,使原煤开采吨煤综合能耗控制在3 kg标煤,远低于国家能耗限额先进值,超标准达到国家能耗“双控”要求。 展开更多
关键词 哈尔乌素露天煤矿 绿色矿山 土壤重构 复垦绿化 职业健康 节能减排
下载PDF
Web pillar stability in open‑pit highwall mining
4
作者 Juyu Jiang Zhuowei Zhang +2 位作者 Dong Wang Laigui Wang Xinping Han 《International Journal of Coal Science & Technology》 EI CAS CSCD 2022年第1期167-182,共16页
When highwall mining technology is applied to recover large amounts of residual coal left under the highwall of a big openpit mine,a reasonable coal pillar width is required to ensure the stability of the web pillars.... When highwall mining technology is applied to recover large amounts of residual coal left under the highwall of a big openpit mine,a reasonable coal pillar width is required to ensure the stability of the web pillars.Using numerical simulations,this paper studied the characteristics of the abutment stress distribution in the web pillars under different slope angles and mining depths,and established a relation describing the stress distribution in the web pillar.The relationship between the abutment stress and the ultimate strength of the web pillar under different pillar widths was also analyzed.In combination with the failure characteristics of the pillar yield zone,this relationship was used to explore the instability mechanism of web pillars.Finally,the optimal retaining widths of the web pillars were determined.Based on the modeling results,a mechanical bearing model of the web pillar was established and a cusp catastrophe model of pillar-overburden was constructed.Additionally,the web pillar instability criterion was derived.By analyzing the ultimate strength of the web pillars,a formula for calculating the yield zone width either side of the pillars was established.Using the instability criterion of web pillars in highwall mining,a reasonable pillar width can be deduced theoretically,providing significant guidance on the application of highwall mining technology. 展开更多
关键词 open-pit mine Highwall mining Instability criterion Web pillar coal pillar width
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部