The main technical requirement of the turbine generating units for the Three Gorges Project (TGP) has a basic conclusion through a long term study and research as well as demonstration.Along with the TGP construction ...The main technical requirement of the turbine generating units for the Three Gorges Project (TGP) has a basic conclusion through a long term study and research as well as demonstration.Along with the TGP construction and successful execution of the contract of turbine generating units,the technical difficulties concerning the performance and structure of turbine generating units have been further recognized.In this paper some issues are discussed and analyzed in connection with a deep going cognition of turbine generating units for TGP during the period of design, manufacture and installation.展开更多
This paper is concerned with the development of electronic controller for turbine POwer units. In order to increase the reliability of the POwer unit, three control loops working in the hi-backup mode have been employ...This paper is concerned with the development of electronic controller for turbine POwer units. In order to increase the reliability of the POwer unit, three control loops working in the hi-backup mode have been employed. This control strategy is able to satisfy the demands of the application of the power unit to the aviation fields.展开更多
In this paper, a multiple population genetic algorithm (MPGA) is proposed to solve the problem of optimal load dispatch of gas turbine generation units. By introducing multiple populations on the basis of Standard Gen...In this paper, a multiple population genetic algorithm (MPGA) is proposed to solve the problem of optimal load dispatch of gas turbine generation units. By introducing multiple populations on the basis of Standard Genetic Algorithm (SGA), connecting each population through immigrant operator and preserving the best individuals of every generation through elite strategy, MPGA can enhance the efficiency in obtaining the global optimal solution. In this paper, MPGA is applied to optimize the load dispatch of 3×390MW gas turbine units. The results of MPGA calculation are compared with that of equal micro incremental method and AGC instruction. MPGA shows the best performance of optimization under different load conditions. The amount of saved gas consumption in the calculation is up to 2337.45m3N/h, which indicates that the load dispatch optimization of gas turbine units via MPGA approach can be effective.展开更多
ZJZ-2 system has the following functions: (1) Real-time on-line sampling and FFT analysis (32 channel); (2) Data aquisition, analysis and storage during start-up and shut-down; (3) Alarming, emergency recognition and ...ZJZ-2 system has the following functions: (1) Real-time on-line sampling and FFT analysis (32 channel); (2) Data aquisition, analysis and storage during start-up and shut-down; (3) Alarming, emergency recognition and fault retrieval; (4) Data aquisition, analysis and storage during daily operation; (5) Recall of historic data; (6) Output of routine reports and tables; (7) Analysis of vibration behaviour: Bode plot, polar plot, spectrum, cascade, waveform, shaft orbit, trend, etc;展开更多
Improving the primary steam parameters is one of the most direct ways to improve the cycle efficiency of a powergeneration system. In the present study, the typical problem connected to the excessively high superheat ...Improving the primary steam parameters is one of the most direct ways to improve the cycle efficiency of a powergeneration system. In the present study, the typical problem connected to the excessively high superheat degree ofextraction steam in an ultra-supercritical (USC) double-reheat unit is considered. Using a 1000 MW power plantas an example, two systems (case 1 and case 2) are proposed, both working in combination with a regenerativesteam turbine. The thermal performances of these two systems are compared with that of the original systemthrough a heat balance method and an exergy balance strategy. The results reveal that the two coupled systemscan significantly reduce the superheat degree of extraction steam, turbine heat rate, and coal consumption of theunit and improve the energy utilization efficiency. These results will provide useful theoretical guidance to futureinvestigators wishing to address the general problem relating to energy conservation and modelling of the coupledextraction steam regenerative system of USC double-reheat units.展开更多
Coordinated controller tuning of the boiler turbine unit is a challenging task due to the nonlinear and coupling characteristics of the system.In this paper,a new variant of binary particle swarm optimization (PSO) ...Coordinated controller tuning of the boiler turbine unit is a challenging task due to the nonlinear and coupling characteristics of the system.In this paper,a new variant of binary particle swarm optimization (PSO) algorithm,called probability based binary PSO (PBPSO),is presented to tune the parameters of a coordinated controller.The simulation results show that PBPSO can effectively optimize the control parameters and achieves better control performance than those based on standard discrete binary PSO,modified binary PSO,and standard continuous PSO.展开更多
The capability to perform fast load-following has been an important issue in the power industry. An output tracking control system of a boiler-turbine unit is developed. The system is composed of stable inversion and ...The capability to perform fast load-following has been an important issue in the power industry. An output tracking control system of a boiler-turbine unit is developed. The system is composed of stable inversion and feedback controller. The stable inversion is implemented as a feedforward controller to improve the load-following capability, and the feedback controller is utilized to guarantee the stability and robustness of the whole system. Loop-shaping H∞ method is used to design the feedback controller and the final controller is reduced to a multivariable PI form. The output tracking control system takes account of the multivariable, nonlinear and coupling behavior of boiler-turbine system, and the simulation tests show that the control system works well and can be widely applied.展开更多
文摘The main technical requirement of the turbine generating units for the Three Gorges Project (TGP) has a basic conclusion through a long term study and research as well as demonstration.Along with the TGP construction and successful execution of the contract of turbine generating units,the technical difficulties concerning the performance and structure of turbine generating units have been further recognized.In this paper some issues are discussed and analyzed in connection with a deep going cognition of turbine generating units for TGP during the period of design, manufacture and installation.
文摘This paper is concerned with the development of electronic controller for turbine POwer units. In order to increase the reliability of the POwer unit, three control loops working in the hi-backup mode have been employed. This control strategy is able to satisfy the demands of the application of the power unit to the aviation fields.
文摘In this paper, a multiple population genetic algorithm (MPGA) is proposed to solve the problem of optimal load dispatch of gas turbine generation units. By introducing multiple populations on the basis of Standard Genetic Algorithm (SGA), connecting each population through immigrant operator and preserving the best individuals of every generation through elite strategy, MPGA can enhance the efficiency in obtaining the global optimal solution. In this paper, MPGA is applied to optimize the load dispatch of 3×390MW gas turbine units. The results of MPGA calculation are compared with that of equal micro incremental method and AGC instruction. MPGA shows the best performance of optimization under different load conditions. The amount of saved gas consumption in the calculation is up to 2337.45m3N/h, which indicates that the load dispatch optimization of gas turbine units via MPGA approach can be effective.
文摘ZJZ-2 system has the following functions: (1) Real-time on-line sampling and FFT analysis (32 channel); (2) Data aquisition, analysis and storage during start-up and shut-down; (3) Alarming, emergency recognition and fault retrieval; (4) Data aquisition, analysis and storage during daily operation; (5) Recall of historic data; (6) Output of routine reports and tables; (7) Analysis of vibration behaviour: Bode plot, polar plot, spectrum, cascade, waveform, shaft orbit, trend, etc;
基金the Shandong Electric Power Engineering Consulting Institute science and technology project(Grant No.37-K2014-33).
文摘Improving the primary steam parameters is one of the most direct ways to improve the cycle efficiency of a powergeneration system. In the present study, the typical problem connected to the excessively high superheat degree ofextraction steam in an ultra-supercritical (USC) double-reheat unit is considered. Using a 1000 MW power plantas an example, two systems (case 1 and case 2) are proposed, both working in combination with a regenerativesteam turbine. The thermal performances of these two systems are compared with that of the original systemthrough a heat balance method and an exergy balance strategy. The results reveal that the two coupled systemscan significantly reduce the superheat degree of extraction steam, turbine heat rate, and coal consumption of theunit and improve the energy utilization efficiency. These results will provide useful theoretical guidance to futureinvestigators wishing to address the general problem relating to energy conservation and modelling of the coupledextraction steam regenerative system of USC double-reheat units.
基金supported by Projects of Shanghai Science and Technology Community (No. 10ZR1411800,No. 08160705900,No. 08160512100)Shanghai University "the 11th Five-Year Plan"+1 种基金211 Construction ProjectMechatronics Engineering Innovation Group Project from Shanghai Education Commission
文摘Coordinated controller tuning of the boiler turbine unit is a challenging task due to the nonlinear and coupling characteristics of the system.In this paper,a new variant of binary particle swarm optimization (PSO) algorithm,called probability based binary PSO (PBPSO),is presented to tune the parameters of a coordinated controller.The simulation results show that PBPSO can effectively optimize the control parameters and achieves better control performance than those based on standard discrete binary PSO,modified binary PSO,and standard continuous PSO.
文摘The capability to perform fast load-following has been an important issue in the power industry. An output tracking control system of a boiler-turbine unit is developed. The system is composed of stable inversion and feedback controller. The stable inversion is implemented as a feedforward controller to improve the load-following capability, and the feedback controller is utilized to guarantee the stability and robustness of the whole system. Loop-shaping H∞ method is used to design the feedback controller and the final controller is reduced to a multivariable PI form. The output tracking control system takes account of the multivariable, nonlinear and coupling behavior of boiler-turbine system, and the simulation tests show that the control system works well and can be widely applied.