期刊文献+
共找到50,323篇文章
< 1 2 250 >
每页显示 20 50 100
Attack-Resilient Distributed Cooperative Control of Virtually Coupled High-Speed Trains via Topology Reconfiguration
1
作者 Shunyuan Xiao Xiaohua Ge Qing Wu 《IEEE/CAA Journal of Automatica Sinica》 SCIE EI CSCD 2024年第4期1066-1068,共3页
Dear Editor,This letter addresses the resilient distributed cooperative control problem of a virtually coupled train convoy under stochastic disturbances and cyber attacks.The main purpose is to achieve distributed co... Dear Editor,This letter addresses the resilient distributed cooperative control problem of a virtually coupled train convoy under stochastic disturbances and cyber attacks.The main purpose is to achieve distributed coordination of virtually coupled high-speed trains with the prescribed inter-train distance and same cruise velocity. 展开更多
关键词 PRESCRIBED speed trainS
下载PDF
Study on the pattern of train arrival headway time in high-speed railway
2
作者 Changhai Tian Shoushuai Zhang 《Railway Sciences》 2024年第3期344-366,共23页
Purpose-The design goal for the tracking interval of high-speed railway trains in China is 3 min,but it is difficult to achieve,and it is widely believed that it is mainly limited by the tracking interval of train arr... Purpose-The design goal for the tracking interval of high-speed railway trains in China is 3 min,but it is difficult to achieve,and it is widely believed that it is mainly limited by the tracking interval of train arrivals.If the train arrival tracking interval can be compressed,it will be beneficial for China's high-speed railway to achieve a 3-min train tracking interval.The goal of this article is to study how to compress the train arrival tracking interval.Design/methodologylapproach-By simulating the process of dense train groups arriving at the station and stopping,the headway between train arrivals at the station was calculated,and the pattern of train arrival headway was obtained,changing the traditional understanding that the train arrival headway is considered the main factor limiting the headway of trains.Findings-When the running speed of trains is high,the headway between trains is short,the length of the station approach throat area is considerable and frequent train arrivals at the station,the arrival headway for the first group or several groups of trains will exceed the headway,but the subsequent sets of trains will havea headway equal to the arrival headway.This convergence characteristic is obtained by appropriately increasing the running time.Originality/value-According to this pattern,there is no need to overly emphasize the impact of train arrival headway on the headway.This plays an important role in compressing train headway and improving high-speedrailwaycapacity. 展开更多
关键词 high speed railway train headway train arrival headway Regular pattern Paper type Research paper
下载PDF
Warhead fragments motion trajectories tracking and spatio-temporal distribution reconstruction method based on high-speed stereo photography
3
作者 Pengyu Hu Jiangpeng Wu +3 位作者 Zhengang Yan Meng He Chao Liang Hao Bai 《Defence Technology(防务技术)》 SCIE EI CAS CSCD 2024年第7期162-172,共11页
High speed photography technique is potentially the most effective way to measure the motion parameter of warhead fragment benefiting from its advantages of high accuracy,high resolution and high efficiency.However,it... High speed photography technique is potentially the most effective way to measure the motion parameter of warhead fragment benefiting from its advantages of high accuracy,high resolution and high efficiency.However,it faces challenge in dense objects tracking and 3D trajectories reconstruction due to the characteristics of small size and dense distribution of fragment swarm.To address these challenges,this work presents a warhead fragments motion trajectories tracking and spatio-temporal distribution reconstruction method based on high-speed stereo photography.Firstly,background difference algorithm is utilized to extract the center and area of each fragment in the image sequence.Subsequently,a multi-object tracking(MOT)algorithm using Kalman filtering and Hungarian optimal assignment is developed to realize real-time and robust trajectories tracking of fragment swarm.To reconstruct 3D motion trajectories,a global stereo trajectories matching strategy is presented,which takes advantages of epipolar constraint and continuity constraint to correctly retrieve stereo correspondence followed by 3D trajectories refinement using polynomial fitting.Finally,the simulation and experimental results demonstrate that the proposed method can accurately track the motion trajectories and reconstruct the spatio-temporal distribution of 1.0×10^(3)fragments in a field of view(FOV)of 3.2 m×2.5 m,and the accuracy of the velocity estimation can achieve 98.6%. 展开更多
关键词 Warhead fragment measurement high speed photography Stereo vision Multi-object tracking Spatio-temporal reconstruction
下载PDF
Switching Frequency Improvement of a High Speed on/off Valve Based on Pre-excitation Control Algorithm
4
作者 Qi Zhong Xiaotian Li +4 位作者 Yongxin Mao Enguang Xu Tiwei Jia Yanbiao Li Huayong Yang 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2024年第4期94-106,共13页
The high-speed on/off valve(HSV)serves as the fundamental component responsible for generating discrete fluids within digital hydraulic systems.As the switching frequency of the HSV increases,the properties of the gen... The high-speed on/off valve(HSV)serves as the fundamental component responsible for generating discrete fluids within digital hydraulic systems.As the switching frequency of the HSV increases,the properties of the generated discrete fluid approach those of continuous fluids.Therefore,a higher frequency response characteristic of HSV is the key to ensure the control accuracy of digital hydraulic systems.However,the current research mainly focuses on its dynamic performance,but neglect its FRC.This paper presents a theoretical analysis demonstrating that the FRC of the HSV can be enhanced by minimizing its switching time.The maximum switching frequency(MSF)is mainly determined by opening dynamic performance when HSV operates with low switching duty ratio(SDR),whereas the closing dynamic performance limits the MSF when HSV operates with high SDR.Building upon these findings,the pre-excitation control algorithm(PECA)is proposed to reduce the switching time of the HSV,and consequently enhance its FRC.Experimental results demonstrate that PECA shortens the opening delay time of HSV by 1.12 ms,the closing delay time by 2.54 ms,and the closing moving time by 0.47 ms in comparison to the existing advanced control algorithms.As a result,a larger MSF of 417 Hz and a wider controllable SDR range from 20%to 70%were achieved at a switching frequency of 250 Hz.Thus,the proposed PFCA in this paper has been verified as an effective and promising approach for enhancing the control performance of digital hydraulic systems. 展开更多
关键词 high speed on/off valve Switching frequency Pre-excitation Dynamic performance Switching duty ratio
下载PDF
Time-Domain Higher-Order Boundary Element Method for Simulating High Forward-Speed Ship Motions in Waves
5
作者 ZHOU Xiao-guo CHENG Yong PAN Su-yong 《China Ocean Engineering》 SCIE EI CSCD 2024年第5期904-914,共11页
The hydrodynamic performance of a high forward-speed ship in obliquely propagating waves is numerically examined to assess both free motions and wave field in comparison with a low forward-speed ship.This numerical mo... The hydrodynamic performance of a high forward-speed ship in obliquely propagating waves is numerically examined to assess both free motions and wave field in comparison with a low forward-speed ship.This numerical model is based on the time-domain potential flow theory and higher-order boundary element method,where an analytical expression is completely expanded to determine the base-unsteady coupling flow imposed on the moving condition of the ship.The ship in the numerical model may possess different advancing speeds,i.e.stationary,low speed,and high speed.The role of the water depth,wave height,wave period,and incident wave angle is analyzed by means of the accurate numerical model.It is found that the resonant motions of the high forward-speed ship are triggered by comparison with the stationary one.More specifically,a higher forward speed generates a V-shaped wave region with a larger elevation,which induces stronger resonant motions corresponding to larger wave periods.The shoaling effect is adverse to the motion of the low-speed ship,but is beneficial to the resonant motion of the high-speed ship.When waves obliquely propagate toward the ship,the V-shaped wave region would be broken due to the coupling effect between roll and pitch motions.It is also demonstrated that the maximum heave motion occurs in beam seas for stationary cases but occurs in head waves for high speeds.However,the variation of the pitch motion with period is hardly affected by wave incident angles. 展开更多
关键词 high forward speed oblique incident waves ship motion higher-order boundary element method time domain wave field
下载PDF
Adaptive Fault Estimation for Dynamics of High Speed Train Based on Robust UKF Algorithm 被引量:1
6
作者 Kexin Li Tiantian Liang 《Journal of Harbin Institute of Technology(New Series)》 CAS 2023年第1期61-72,共12页
This paper proposes an adaptive unscented Kalman filter algorithm(ARUKF)to implement fault estimation for the dynamics of high⁃speed train(HST)with measurement uncertainty and time⁃varying noise with unknown statistic... This paper proposes an adaptive unscented Kalman filter algorithm(ARUKF)to implement fault estimation for the dynamics of high⁃speed train(HST)with measurement uncertainty and time⁃varying noise with unknown statistics.Firstly,regarding the actuator and sensor fault as the auxiliary variables of the dynamics of HST,an augmented system is established,and the fault estimation problem for dynamics of HST is formulated as the state estimation of the augmented system.Then,considering the measurement uncertainties,a robust lower bound is proposed to modify the update of the UKF to decrease the influence of measurement uncertainty on the filtering accuracy.Further,considering the unknown time⁃varying noise of the dynamics of HST,an adaptive UKF algorithm based on moving window is proposed to estimate the time⁃varying noise so that accurate concurrent actuator and sensor fault estimations of dynamics of HST is implemented.Finally,a five-car model of HST is given to show the effectiveness of this method. 展开更多
关键词 high speed train Kalman filter adaptive algorithm robust algorithm unknown noise measurement uncertainty
下载PDF
Determining future high speed rail review topics through bibliometric analysis
7
作者 Heather Steele Marcelo Blumenfeld Paul Plummer 《High-Speed Railway》 2024年第1期17-29,共13页
As High Speed Rail(HSR)has proliferated globally,so has a related research field dedicated to exploring and addressing its unique issues.Yet,studies to understand and classify the HSR research domain are limited.This ... As High Speed Rail(HSR)has proliferated globally,so has a related research field dedicated to exploring and addressing its unique issues.Yet,studies to understand and classify the HSR research domain are limited.This paper addresses the gap,using bibliometric analysis to identify future research areas and 20 candidate topics for literature review based on keyword analysis through VOSviewer.Article and review papers related to HSR published in the last 20 years(2003-2022)were retrieved from Scopus,and then analyzed to determine the split in knowledge between languages,the collaboration between countries and institutions,highly productive and cited journals,and research topics which have and have not been reviewed.Approximately 30%of the search results were published exclusively in Chinese,highlighting the importance of extending the evaluation to cover both languages.This is a novel aspect of the work,which has enabled the recognition of potential knowledge gaps.It is recommended that future reviews incorporate works in both languages,possibly through international collaboration.Institutions in China and other countries that are strong collaborators have been identified,as well as relevant,highly cited journals. 展开更多
关键词 high speed rail Literature review Bibliometric analysis Vosviewer Keyword co-occurrence
下载PDF
Key technologies of earthquake early warning system for China’s high-speed railway
8
作者 Geming Zhang Lin Yang Wenxiang Jiang 《Railway Sciences》 2024年第2期239-262,共24页
Purpose–The purpose of this study is to introduce the top-level design ideas and the overall architecture of earthquake early-warning system for high speed railways in China,which is based on P-wave earthquake early-... Purpose–The purpose of this study is to introduce the top-level design ideas and the overall architecture of earthquake early-warning system for high speed railways in China,which is based on P-wave earthquake early-warning and multiple ways of rapid treatment.Design/methodology/approach–The paper describes the key technologies that are involved in the development of the system,such as P-wave identification and earthquake early-warning,multi-source seismic information fusion and earthquake emergency treatment technologies.The paper also presents the test results of the system,which show that it has complete functions and its major performance indicators meet the design requirements.Findings–The study demonstrates that the high speed railways earthquake early-warning system serves as an important technical tool for high speed railways to cope with the threat of earthquake to the operation safety.The key technical indicators of the system have excellent performance:The first report time of the P-wave is less than three seconds.From the first arrival of P-wave to the beginning of train braking,the total delay of onboard emergency treatment is 3.63 seconds under 95%probability.The average total delay for power failures triggered by substations is 3.3 seconds.Originality/value–The paper provides a valuable reference for the research and development of earthquake early-warning system for high speed railways in other countries and regions.It also contributes to the earthquake prevention and disaster reduction efforts. 展开更多
关键词 Earthquake early-warning high speed railway China earthquake networks center(CENC) Earthquake emergency treatment
下载PDF
Corrosion Test of the Steel Plate in a WJ-8 Fastener for High Speed Rail
9
作者 Zhiyong Wang Zhiping Zeng Hualiang (Harry) Teng 《Journal of Transportation Technologies》 2024年第1期16-30,共15页
It was found that the steel plate in the composite plate in the WJ-8 fastener used in high speed rail is rusty. The objective of this study is to test the zinc coating of the steel plate. A literature review was condu... It was found that the steel plate in the composite plate in the WJ-8 fastener used in high speed rail is rusty. The objective of this study is to test the zinc coating of the steel plate. A literature review was conducted to identify the zinc coating techniques, and the companies that can provide different coating service was identified. A salt fog chamber was built that was in compliance with the ANSI B117 code, and the steel plates that were coated by the identified companies were tested using the salt fog chamber. The results indicated that the coating technique that had the best performance in preventing corrosion was the Greenkote plates with passivation. The galvanized option had the roughest coating layer, and it was the most reactive in the salt water solution. This makes it non-ideal for the dynamic rail environment because the increased friction of the plate could damage the supports, especially during extreme temperatures that would cause the rail to expand or contract. Greenkote with Phosphate and ArmorGalv also provided increased corrosion prevention with a smooth, strong finish, but it had more rust on the surface area than the Greenkote with ELU passivation. The ArmorGalv sample had more rust on the surface area than the Greenkote samples. This may not be a weakness in the ArmorGalv process;rather, it likely was the result of this particular sample not having the added protection of a colored coating. 展开更多
关键词 Steel Plate for high speed Rail Fastening Steel Corrosion Zinc Coating Salt-Fog Chamber
下载PDF
Research on fault time prediction method for high speed rail BTM unit based on multi method interactive validation
10
作者 Limin Fu Junqiang Gou +2 位作者 Chao Sun Hanrui Li Wei Liu 《High-Speed Railway》 2024年第3期164-171,共8页
The Balise Transmission Module(BTM)unit of the on-board train control system is a crucial component.Due to its unique installation position and complex environment,this unit has a higher fault rate within the on-board... The Balise Transmission Module(BTM)unit of the on-board train control system is a crucial component.Due to its unique installation position and complex environment,this unit has a higher fault rate within the on-board train control system.To conduct fault prediction for the BTM unit based on actual fault data,this study proposes a prediction method combining reliability statistics and machine learning,and achieves the fusion of prediction results from different dimensions through multi-method interactive validation.Firstly,a method for predicting equipment fault time targeting batch equipment is introduced.This method utilizes reliability statistics to construct a model of the remaining faultless operating time distribution considering uncertainty,thereby predicting the remaining faultless operating probability of the BTM unit.Secondly,considering the complexity of the BTM unit’s fault mechanism,the small sample size of fault cases,and the potential presence of multiple fault features in fault text records,an individual-oriented fault prediction method based on Bayesian-optimized Gradient Boosting Regression Tree(Bayes-GBRT)is proposed.This method achieves better prediction results compared to linear regression algorithms and random forest regression algorithms,with an average absolute error of only 0.224 years for predicting the fault time of this type of equipment.Finally,a multi-method interactive validation approach is proposed,enabling the fusion and validation of multi-dimensional results.The results indicate that the predicted fault time and the actual fault time conform to a log-normal distribution,and the parameter estimation results are basically consistent,verifying the accuracy and effectiveness of the prediction results.The above research findings can provide technical support for the maintenance and modification of BTM units,effectively reducing maintenance costs and ensuring the safe operation of high-speed railway,thus having practical engineering value for preventive maintenance. 展开更多
关键词 high speed rail BTM unit Remaining faultless operating time Machine learning Multi method interactive verification
下载PDF
Effects of High-Intensity Intermittent Training on Metabolic Parameters and Irisin Levels in High-Fat-Fed Rats
11
作者 Dongping Tan Wenbin Zhang +1 位作者 Longxia Zheng Huijun Lin 《Journal of Clinical and Nursing Research》 2024年第8期52-59,共8页
Objective:To investigate the effects of high-intensity intermittent training(HIIT)on preventing significant weight gain and provide scientific theoretical support and practical guidance for reducing the occurrence of ... Objective:To investigate the effects of high-intensity intermittent training(HIIT)on preventing significant weight gain and provide scientific theoretical support and practical guidance for reducing the occurrence of obesity.Methods:Twenty-four Sprague-Dawley rats were randomly divided into four groups:the control sedentary group(CS),the high-fat sedentary group(HS),the high-fat continuous exercise group(HE),and the high-fat intermittent exercise group(HI).The HE and HI groups underwent five days of continuous low-intensity exercise and eight weeks of high-intensity intermittent exercise.Weekly monitoring included measurements of food intake and body weight.An automatic biochemical analyzer was used to assess blood lipid and glucose levels,while ELISA kits measured serum insulin and irisin content.H&E staining was used to observe adipocyte size.Results:In the HS group,body weight,blood lipid levels,blood glucose levels,and adipocyte size significantly increased,while the QUICKI index decreased.In the HI group,body weight,blood lipid levels,blood glucose levels,and adipocyte size decreased,and the QUICKI index increased.The effects of high-intensity intermittent exercise were superior to those of continuous low-intensity exercise.In the HI group,serum irisin levels did not change significantly after exercise,while in the HE group,there was a slight upward trend in irisin levels.Conclusion:A high-fat diet induced abnormal metabolism in rats.HIIT effectively prevents metabolic abnormalities induced by a high-fat diet,and its effects are more pronounced than those of low-intensity exercise.HIIT stimulates the secretion of blood irisin,affecting secretion levels,and may represent a novel mechanism for maintaining metabolic homeostasis.This has important implications for controlling significant weight gain. 展开更多
关键词 high intensity interval training RATS Metabolic characterization Irisin
下载PDF
The Application of China's High Speed Railway Earthquake Early Warning System in Jakarta-Bandung HSR
12
作者 YANG Lin ZHU Jinjing +1 位作者 ZHANG Xiuguang ZHANG Yiran(Translated) 《Chinese Railways》 2024年第1期62-70,共9页
Earthquake has a significant impact on operation safety of the high speed railway,and for Jakarta-Bandung High Speed Railway(HSR)in Indonesia where it is earthquake-prone,it is necessary to establish an earthquake ear... Earthquake has a significant impact on operation safety of the high speed railway,and for Jakarta-Bandung High Speed Railway(HSR)in Indonesia where it is earthquake-prone,it is necessary to establish an earthquake early warning system to strengthen its earthquake resistance.Based on the principle and technical characteristics of China's high speed railway earthquake early warning system and combining the actual situations of Jakarta-Bandung HSR in Indonesia,this paper describes how to implement China's high speed railway earthquake early warning system in Jakarta-Bandung HSR.It focuses on optimizations in environmental adaptation design and seismic network interface design,earthquake attenuation model parameter adjustment and terminal software interface adjustment,so as to make the system better suit the local situations,and meet operation requirements and guarantee safe operation of Jakarta-Bandung HSR. 展开更多
关键词 Jakarta-Bandung HSR China's high speed railway earthquake early warning system attenuation model Indonesia localized application
下载PDF
Study on dynamic response of high speed train window glass under tunnel aerodynamic effects
13
作者 Xiaogen Liu Shuang Qi +1 位作者 Detian Wan Dezhi Zheng 《Railway Sciences》 2023年第2期211-224,共14页
Purpose-This paper aims to analyze the bearing characteristics of the high speed train window glass under aerodynamic load effects.Design/methodology/approach-In order to obtain the dynamic strain response of passenge... Purpose-This paper aims to analyze the bearing characteristics of the high speed train window glass under aerodynamic load effects.Design/methodology/approach-In order to obtain the dynamic strain response of passenger compartment window glass during high-speed train crossing the tunnel,taking the passenger compartment window glass of the CRH3 high speed train onWuhan-Guangzhou High Speed Railway as the research object,this study tests the strain dynamic response and maximum principal stress of the high speed train passing through the tunnel entrance and exit,the tunnel and tunnel groups as well as trains meeting in the tunnel at an average speed of 300 km$h-1.Findings-The results show that while crossing the tunnel,the passenger compartment window glass of high speed train is subjected to the alternating action of positive and negative air pressures,which shows the typical mechanic characteristics of the alternating fatigue stress of positive-negative transient strain.The maximum principal stress of passenger compartment window glass for high speed train caused by tunnel aerodynamic effects does not exceed 5 MPa,and the maximum value occurs at the corresponding time of crossing the tunnel groups.The high speed train window glass bears medium and low strain rates under the action of tunnel aerodynamic effects,while the maximum strain rate occurs at the meeting moment when the window glass meets the train head approaching from the opposite side in the tunnel.The shear modulus of laminated glass PVB film that makes up high speed train window glass is sensitive to the temperature and action time.The dynamically equivalent thickness and stiffness of the laminated glass and the dynamic bearing capacity of the window glass decrease with the increase of the action time under tunnel aerodynamic pressure.Thus,the influence of the loading action time and fatigue under tunnel aerodynamic effects on the glass strength should be considered in the design for the bearing performance of high speed train window glass.Originality/value-The research results provide data support for the analysis of mechanical characteristics,damage mechanism,strength design and structural optimization of high speed train glass. 展开更多
关键词 high speed train window glass Tunnel aerodynamic effect Strain dynamic response Maximum principal stress Strain rate Bearing characteristics
下载PDF
A study on aerodynamic noise characteristics of a high-speed maglev train with a speed of 600 km/h
14
作者 Jie Zhang Yuwei Wu +2 位作者 Jianyong Gao Guangjun Gao Zhigang Yang 《Railway Sciences》 2023年第3期310-326,共17页
Purpose–This study aims to explore the formation mechanism of aerodynamic noise of a high-speed maglev train and understand the characteristics of dipole and quadrupole sound sources of the maglev train at different ... Purpose–This study aims to explore the formation mechanism of aerodynamic noise of a high-speed maglev train and understand the characteristics of dipole and quadrupole sound sources of the maglev train at different speed levels.Design/methodology/approach–Based on large eddy simulation(LES)method and Kirchhoff–Ffowcs Williams and Hawkings(K-FWH)equations,the characteristics of dipole and quadrupole sound sources of maglev trains at different speed levels were simulated and analyzed by constructing reasonable penetrable integral surface.Findings–The spatial disturbance resulting from the separation of the boundary layer in the streamlined area of the tail car is the source of aerodynamic sound of the maglev train.The dipole sources of the train are mainly distributed around the radio terminals of the head and tail cars of the maglev train,the bottom of the arms of the streamlined parts of the head and tail cars and the nose tip area of the streamlined part of the tail car,and the quadrupole sources are mainly distributed in the wake area.When the train runs at three speed levels of 400,500 and 600 km$h1,respectively,the radiated energy of quadrupole source is 62.4%,63.3%and 71.7%,respectively,which exceeds that of dipole sources.Originality/value–This study can help understand the aerodynamic noise characteristics generated by the high-speed maglev train and provide a reference for the optimization design of its aerodynamic shape. 展开更多
关键词 high-speed maglev train Aerodynamic noise Penetrable integral surface Large eddy simulation speed level
下载PDF
Numerical study on wake characteristics of high-speed trains 被引量:20
15
作者 Shuan-Bao Yao Zhen-Xu Sun +2 位作者 Di-Long Guo Da-Wei Chen Guo-Wei Yang 《Acta Mechanica Sinica》 SCIE EI CAS CSCD 2013年第6期811-822,共12页
Intensive turbulence exists in the wakes of high speed trains, and the aerodynamic performance of the trailing car could deteriorate rapidly due to complicated features of the vortices in the wake zone. As a result, t... Intensive turbulence exists in the wakes of high speed trains, and the aerodynamic performance of the trailing car could deteriorate rapidly due to complicated features of the vortices in the wake zone. As a result, the safety and amenity of high speed trains would face a great challenge. This paper considers mainly the mechanism of vortex formation and evolution in the train flow field. A real CRH2 model is studied, with a leading car, a middle car and a trailing car included. Different running speeds and cross wind conditions are considered, and the approaches of un- steady Reynold-averaged Navier-Stokes (URANS) and de- tached eddy simulation (DES) are utilized, respectively. Re- suits reveal that DES has better capability of capturing small eddies compared to URANS. However, for large eddies, the effects of two approaches are almost the same. In conditions without cross winds, two large vortex streets stretch from the train nose and interact strongly with each other in the wake zone. With the reinforcement of the ground, a complicated wake vortex system generates and becomes strengthened as the running speed increases. However, the locations of flow separations on the train surface and the separation mechanism keep unchanged. In conditions with cross winds, three large vortices develop along the leeward side of the train, among which the weakest one has no obvious influence on the wake flow while the other two stretch to the tail of the train and combine with the helical vortices in the train wake. Thus, optimization of the aerodynamic performance of the trailing car should be aiming at reducing the intensity of the wake vortex system. 展开更多
关键词 Wake flow structures URANS DES high speed trains
下载PDF
Theoretical research and experimental validation of quasi-static load spectra on bogie frame structures of high-speed trains 被引量:15
16
作者 Ning Zhu Shou-Guang Sun +1 位作者 Qiang Li Hua Zou 《Acta Mechanica Sinica》 SCIE EI CAS CSCD 2014年第6期901-909,共9页
One of the major problems in structural fatigue life analysis is establishing structural load spectra under actual operating conditions.This study conducts theoretical research and experimental validation of quasi-sta... One of the major problems in structural fatigue life analysis is establishing structural load spectra under actual operating conditions.This study conducts theoretical research and experimental validation of quasi-static load spectra on bogie frame structures of high-speed trains.The quasistatic load series that corresponds to quasi-static deformation modes are identified according to the structural form and bearing conditions of high-speed train bogie frames.Moreover,a force-measuring frame is designed and manufactured based on the quasi-static load series.The load decoupling model of the quasi-static load series is then established via calibration tests.Quasi-static load–time histories,together with online tests and decoupling analysis,are obtained for the intermediate range of the Beijing—Shanghai dedicated passenger line.The damage consistency calibration of the quasi-static discrete load spectra is performed according to a damage consistency criterion and a genetic algorithm.The calibrated damage that corresponds with the quasi-static discrete load spectra satisfies the safety requirements of bogie frames. 展开更多
关键词 Load spectra QUASI-STATIC Bogie frame CALIBRATION high-speed train
下载PDF
Sound Source Localisation for a High-Speed Train and Its Transfer Path to Interior Noise 被引量:12
17
作者 Jie Zhang Xinbiao Xiao +1 位作者 Xiaozhen Sheng Zhihui Li 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2019年第4期168-183,共16页
Noise is one of the key issues in the operation of high-speed railways, with sound source localisation and its transfer path as the two major aspects. This study investigates both the exterior and interior sound sourc... Noise is one of the key issues in the operation of high-speed railways, with sound source localisation and its transfer path as the two major aspects. This study investigates both the exterior and interior sound source distribution of a high-speed train and presents a method for performing the contribution analysis of airborne sound with regard to the interior noise. First, both exterior and interior sound source locations of the high-speed train are identified through in-situ measurements. Second, the sound source contribution for di erent regions of the train and the relationships between the exterior and interior noises are analysed. Third, a method for conducting the contribution analysis of airborne sound with regard to the interior noise of the high-speed train is described. Lastly, a case study on the sidewall area is carried out, and the contribution of airborne sound to the interior noise of this area is obtained. The results show that, when the high-speed train runs at 310 km/h, dominant exterior sound sources are located in the bogie and pantograph regions, while main interior sound sources are located at the sidewall and roof. The interior noise, the bogie area noise and the sound source at the middle of the coach exhibit very similar rates of increase with increasing train speed. For the selected sidewall area, structure-borne sound dominates in most of the 1/3 octave bands. 展开更多
关键词 high-speed train INTERIOR noise SOUND transfer path Noise source identification EXTERIOR noise AIRBORNE SOUND
下载PDF
An improved algorithm for fluid-structure interaction of high-speed trains under crosswind 被引量:30
18
作者 Tian LI Jiye ZHANG Weihua ZHANG 《Journal of Modern Transportation》 2011年第2期75-81,共7页
Based on the train-track coupling dynamics and high-speed train aerodynamics, this paper deals with an improved algorithm for fluid-structure interaction of high-speed trains. In the algorithm, the data communication ... Based on the train-track coupling dynamics and high-speed train aerodynamics, this paper deals with an improved algorithm for fluid-structure interaction of high-speed trains. In the algorithm, the data communication between fluid solver and structure solver is avoided by inserting the program of train-track coupling dynamics into fluid dynamics program, and the relaxation factor concerning the load boundary of the fluid-structure interface is introduced to improve the fluctuation and convergence of aerodynamic forces. With this method, the fluid-structure dynamics of a highspeed train are simulated under the condition that the velocity of crosswind is 13.8 m/s and the train speed is 350 km/h. When the relaxation factor equals 0.5, the fluctuation of aerodynamic forces is lower and its convergence is faster than in other cases. The side force and lateral displacement of the head train are compared between off-line simulation and co-simulation. Simulation results show that the fluid-structure interaction has a significant influence on the aerodynam- ics and attitude of the head train under crosswind conditions. In addition, the security indexes of the head train worsen after the fluid-structure interaction calculation. Therefore, the fluid-structure interaction calculation is necessary for high-speed trains. 展开更多
关键词 high-speed train fluid-structure interaction CROSSWIND AERODYNAMICS relaxation factor
下载PDF
Development of a simulation model for dynamic derailment analysis of high-speed trains 被引量:8
19
作者 Liang Ling Xin-Biao Xiao Xue-Song Jin 《Acta Mechanica Sinica》 SCIE EI CAS CSCD 2014年第6期860-875,共16页
The running safety of high-speed trains has become a major concern of the current railway research with the rapid development of high-speed railways around the world.The basic safety requirement is to prevent the dera... The running safety of high-speed trains has become a major concern of the current railway research with the rapid development of high-speed railways around the world.The basic safety requirement is to prevent the derailment.The root causes of the dynamic derailment of highspeed trains operating in severe environments are not easy to identify using the field tests or laboratory experiments.Numerical simulation using an advanced train–track interaction model is a highly efficient and low-cost approach to investigate the dynamic derailment behavior and mechanism of high-speed trains.This paper presents a three-dimensional dynamic model of a high-speed train coupled with a ballast track for dynamic derailment analysis.The model considers a train composed of multiple vehicles and the nonlinear inter-vehicle connections.The ballast track model consists of rails,fastenings,sleepers,ballasts,and roadbed,which are modeled by Euler beams,nonlinear spring-damper elements,equivalent ballast bodies,and continuous viscoelastic elements,in which the modal superposition method was used to reduce the order of the partial differential equations of Euler beams.The commonly used derailment safety assessment criteria around the world are embedded in the simulation model.The train–track model was then used to investigate the dynamic derailment responses of a high-speed train passing over a buckled track,in which the derailmentmechanism and train running posture during the dynamic derailment process were analyzed in detail.The effects of train and track modelling on dynamic derailment analysis were also discussed.The numerical results indicate that the train and track modelling options have a significant effect on the dynamic derailment analysis.The inter-vehicle impacts and the track flexibility and nonlinearity should be considered in the dynamic derailment simulations. 展开更多
关键词 high-speed railway high-speed train DERAILMENT train–track dynamics Track buckling Numerical simulation
下载PDF
Effect of ambient wind on pressure wave generated by high-speed train entering a tunnel 被引量:7
20
作者 ZHOU Xi-sai LIU Tang-hong +2 位作者 CHEN Zheng-wei ZOU Xiang LIU Dong-run 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第6期1465-1475,共11页
Using three-dimensional, unsteady N-S equations and k-ε turbulence model, the effect of ambient wind on the pressure wave generated by a high-speed train entering a tunnel was studied via numerical simulation. Pressu... Using three-dimensional, unsteady N-S equations and k-ε turbulence model, the effect of ambient wind on the pressure wave generated by a high-speed train entering a tunnel was studied via numerical simulation. Pressure changes of the train surface and tunnel wall were obtained as well as the flow field around the train. Results show that when the train runs downwind, the pressure change is smaller than that generated when there is no wind. When the train runs upwind, the pressure change is larger. The pressure change is more sensitive in the upwind condition than in the downwind condition. Compared with no wind condition, when the wind velocity is 10 m/s and 30 m/s, the pressure amplitude on the train head is reduced by 2.8% and 10.5%, respectively. The wall pressure amplitude at 400 m away from the tunnel entrance is reduced by 2.4% and 13.5%, respectively. When the wind velocity is-10 m/s and-30 m/s, the pressure amplitude on the train head increases by 3.0% and 17.7%, respectively. The wall pressure amplitude at 400 m away from the tunnel entrance increases by 3.6% and 18.6%, respectively. The pressure waveform slightly changes under ambient wind due to the influence of ambient wind on the pressure wave propagation speed. 展开更多
关键词 high-speed train AMBIENT WIND pressure wave TUNNEL
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部