In the maintenance work of highway and bridge engineering structures,the fracture delay of high-strength bolts is a content that needs to be focused on and researched.Based on this,the paper analyzes the fracture dela...In the maintenance work of highway and bridge engineering structures,the fracture delay of high-strength bolts is a content that needs to be focused on and researched.Based on this,the paper analyzes the fracture delay of high-strength bolts in highway bridge maintenance,including an overview of the fundamental research on fracture delay and related specific studies.It is hoped that this study can provide scientific reference for the reasonable maintenance of high-strength bolts,so as to ensure the overall maintenance effect of highway bridge projects.展开更多
In deep ground engineering,the use of high-strength and high-toughness steels for rock bolt can significantly improve its energy absorption capacity.However,the mechanisms and effects of rock loading conditions on thi...In deep ground engineering,the use of high-strength and high-toughness steels for rock bolt can significantly improve its energy absorption capacity.However,the mechanisms and effects of rock loading conditions on this kind of high energy-absorbing steel for rock bolt remain immature.In this study,taking Muzhailing highway tunnel as the background,physically based crystal plasticity simulations were performed to understand the effect of rock loading rate and pretension on the deformation behaviors of twinning induced plasticity(TWIP)steel used for rock bolt.The material physical connecting to the underlying microscopic mechanisms of dislocation glide and deformation twinning were incorporated in numerical modeling.The rock loading conditions were mimicked by the real-time field monitoring data of the NPR bolt/cable equipment installed on the tunnel surrounding rock surface.The results indicate that the bolt rod exhibits pronounced deformation-softening behavior with decrease of the loading rate.There is also a sound deformation-relaxation phenomenon induced by the dramatic decrease of loading rate after pre-tensioning.The high pretension(>600 MPa or 224 k N)can help bolt rod steel resist deformation-softening behavior,especially at low loading rate(<10~(-1)MPa/s or 10~(-2)kN/s).The loading rate was found to be a significant factor affecting deformation-softening behavior while the pretension was found to be the major parameter accounting for the deformation-relaxation scenario.The results provide the theoretical basis and technical support for practical applications.展开更多
The high-strength bolted end plate connection is widely used in the construction industry with its green environmental protection and excellent seismic performance. The joints of the joints are semi-rigid, the force p...The high-strength bolted end plate connection is widely used in the construction industry with its green environmental protection and excellent seismic performance. The joints of the joints are semi-rigid, the force performance is extremely complicated, and the experimental research cost is relatively high, and the cycle is very long. Therefore, the establishment of an efficient numerical model is of great significance for evaluating the force performance of high-strength bolt end plates. In this paper, the influence of different material models on the rotation performance of the joint is studied by numerical simulation, and the bending moment-rotation curve is obtained. The numerical simulation and the experimental results are in good agreement, so as to provide a reference for the design and application of this kind of joint.展开更多
In coal mining roadway support design,the working resistance of the rock bolt is the key factor affecting its maximum support load.Effective improvement of the working resistance is of great significance to roadway su...In coal mining roadway support design,the working resistance of the rock bolt is the key factor affecting its maximum support load.Effective improvement of the working resistance is of great significance to roadway support.Based on the rock bolt’s tensile characteristics and the mining roadway surrounding rock deformation,a mechanical model for calculating the working resistance of the rock bolt was established and solved.Taking the mining roadway of the 17102(3)working face at the Panji No.3 Coal Mine of China as a research site,with a quadrilateral section roadway,the influence of pretension and anchorage length on the working resistance of high-strength and ordinary rock bolts in the middle and corner of the roadway is studied.The results show that when the bolt is in the elastic stage,increasing the pretension and anchorage length can effectively improve the working resistance.When the bolt is in the yield and strain-strengthening stages,increasing the pretension and anchorage length cannot effectively improve the working resistance.The influence of pretension and anchorage length on the ordinary and high-strength bolts is similar.The ordinary bolt’s working resistance is approximately 25 kN less than that of the high-strength bolt.When pretension and anchorage length are considered separately,the best pretensions of the high-strength bolt in the middle of the roadway side and the roadway corner are 41.55 and 104.26 kN,respectively,and the best anchorage lengths are 1.54 and 2.12 m,respectively.The best anchorage length of the ordinary bolt is the same as that of the high-strength bolt,and the best pretension for the ordinary bolt in the middle of the roadway side and at the roadway corner is 33.51 and 85.12 kN,respectively.The research results can provide a theoretical basis for supporting the design of quadrilateral mining roadways.展开更多
为提高无人机对架空输电线路巡检的效率和线路中螺栓缺销的检测精度,提出了改进的你只看一次第7微小版(you only look once version 7-tiny,YOLOv7-tiny)输电线路螺栓缺销检测算法。该算法采用高效的分布移位卷积(distribution shifting...为提高无人机对架空输电线路巡检的效率和线路中螺栓缺销的检测精度,提出了改进的你只看一次第7微小版(you only look once version 7-tiny,YOLOv7-tiny)输电线路螺栓缺销检测算法。该算法采用高效的分布移位卷积(distribution shifting convolution,DSConv)来替换YOLOv7-tiny网络中的3×3卷积,以提高模型的计算速度并降低计算复杂度;在模型的检测头部分,添加了高效解耦头结构,以提高模型的准确度和稳定性;并采用明智的交并比(wise intersection over union,WIoU)损失函数来提高正样本的权重,使模型更加关注缺销螺栓目标,以减少正负样本不平衡带来的噪声干扰。实验结果表明,改进YOLOv7-tiny算法对输电线路螺栓缺销检测的平均精度均值达到90.6%,检测速度达到143.0帧/s,同时实现了检测的高速度和高精度。该算法在无人机输电线路巡检中具有一定的优势。展开更多
The hydrogen-induced delayed fracture(HIDF)behavior of a 1300-MPa-grade high-strength bolt steel 42CrMoV containing 0.42 wt.%Cu was investigated by constant load tensile test in a pH 3.5 Walpole solution.It is shown t...The hydrogen-induced delayed fracture(HIDF)behavior of a 1300-MPa-grade high-strength bolt steel 42CrMoV containing 0.42 wt.%Cu was investigated by constant load tensile test in a pH 3.5 Walpole solution.It is shown that the addition of Cu is beneficial to enhance the HIDF resistance by~13%.The observation of the fracture surface revealed that the area fraction of brittle crack initiation zone decreased remarkably for the Cu-added steel.Both the corrosion pit depth and the corrosion rate of the Cu-added steel in the Walpole solution are notably decreased,which is primarily because of the formation of a Cu-rich protective compact rust layer and slightly higher corrosion potential.As a result,the absorbed hydrogen content in that solution was also decreased by~21%.It is concluded that the improvement in the HIDF resistance of the tested steel is primarily due to the increase in corrosion resistance and resultant decrease in the absorbed diffusible hydrogen content in the acidic condition.展开更多
The condition of bolted connections significantly affects the structural safety.However,conventional bolt tension sensors fail to provide precise measurements due to their bulky size or inadequate stability.This study...The condition of bolted connections significantly affects the structural safety.However,conventional bolt tension sensors fail to provide precise measurements due to their bulky size or inadequate stability.This study employs the piezoresistive effect of crystalline silicon material to fabricate an ultrathin sensor.The sensor exhibits a linear relationship between pressure and voltage,an exceptional stability at varying temperatures,and a superior resistance to corrosion,making it adaptable and user-friendly for applications of high-strength bolt tension monitoring.A monitoring system,incorporating the proposed sensor,has also been developed.This system provides real-time display of bolt tension and enables the assessment of sensor and structural conditions,including bolt loosening or component failure.The efficacy of the proposed sensor and monitoring system was validated through a project carried out at the Xiluodu Hydropower Plant.According to the results,the sensor and online monitoring system effectively gauged and proficiently conveyed and stored bolt tension data.In addition,correlations were created between bolt tensions and essential unit parameters,such as water head,active power,and pressures at vital points,facilitating anomaly detection and early warning.展开更多
To study the seismic performance and load-transferring mechanism of an innovative precast shear wall(IPSW) involving vertical joints, an experimental investigation and theoretical analysis were successively conducted ...To study the seismic performance and load-transferring mechanism of an innovative precast shear wall(IPSW) involving vertical joints, an experimental investigation and theoretical analysis were successively conducted on two test walls. The test results confirm the feasibility of the novel joints as well as the favorable seismic performance of the walls, even though certain optimization measures should be taken to improve the ductility. The load-transferring mechanism subsequently is theoretically investigated based on the experimental study. The theoretical results show the load-transferring route of the novel joints is concise and definite. During the elastic stage, the vertical shear stress in the connecting steel frame(CSF) distributes uniformly; and each high-strength bolt(HSB)primarily delivers vertical shear force. However, the stress in the CSF redistributes when the walls develop into the elastic-plastic stage. At the ultimate state, the vertical shear stress and horizontal normal stress in the CSF distribute linearly; and the HSBs at both ends of the CSF transfer the maximum shear forces.展开更多
文摘In the maintenance work of highway and bridge engineering structures,the fracture delay of high-strength bolts is a content that needs to be focused on and researched.Based on this,the paper analyzes the fracture delay of high-strength bolts in highway bridge maintenance,including an overview of the fundamental research on fracture delay and related specific studies.It is hoped that this study can provide scientific reference for the reasonable maintenance of high-strength bolts,so as to ensure the overall maintenance effect of highway bridge projects.
基金the National Natural Science Foundation of China(Grant No.41941018)the Science and Technology Major Project of Gansu Province(Grant No.19ZD2GA005)the Research Institute for Deep Underground Science and Engineering Foundation(Grant No.XD2021023)。
文摘In deep ground engineering,the use of high-strength and high-toughness steels for rock bolt can significantly improve its energy absorption capacity.However,the mechanisms and effects of rock loading conditions on this kind of high energy-absorbing steel for rock bolt remain immature.In this study,taking Muzhailing highway tunnel as the background,physically based crystal plasticity simulations were performed to understand the effect of rock loading rate and pretension on the deformation behaviors of twinning induced plasticity(TWIP)steel used for rock bolt.The material physical connecting to the underlying microscopic mechanisms of dislocation glide and deformation twinning were incorporated in numerical modeling.The rock loading conditions were mimicked by the real-time field monitoring data of the NPR bolt/cable equipment installed on the tunnel surrounding rock surface.The results indicate that the bolt rod exhibits pronounced deformation-softening behavior with decrease of the loading rate.There is also a sound deformation-relaxation phenomenon induced by the dramatic decrease of loading rate after pre-tensioning.The high pretension(>600 MPa or 224 k N)can help bolt rod steel resist deformation-softening behavior,especially at low loading rate(<10~(-1)MPa/s or 10~(-2)kN/s).The loading rate was found to be a significant factor affecting deformation-softening behavior while the pretension was found to be the major parameter accounting for the deformation-relaxation scenario.The results provide the theoretical basis and technical support for practical applications.
文摘The high-strength bolted end plate connection is widely used in the construction industry with its green environmental protection and excellent seismic performance. The joints of the joints are semi-rigid, the force performance is extremely complicated, and the experimental research cost is relatively high, and the cycle is very long. Therefore, the establishment of an efficient numerical model is of great significance for evaluating the force performance of high-strength bolt end plates. In this paper, the influence of different material models on the rotation performance of the joint is studied by numerical simulation, and the bending moment-rotation curve is obtained. The numerical simulation and the experimental results are in good agreement, so as to provide a reference for the design and application of this kind of joint.
基金This work was supported by the National Natural Science Foundation of China(51774009,51874006,and 51904010)Key Research and Development Projects in Anhui Province(202004a07020045)+2 种基金Colleges and Universities Natural Science Foundation of Anhui(KJ2019A0134)Anhui Provincial Natural Science Foundation(2008085ME147)Anhui University of Technology and Science Graduate Innovation Foundation(2019CX2007).
文摘In coal mining roadway support design,the working resistance of the rock bolt is the key factor affecting its maximum support load.Effective improvement of the working resistance is of great significance to roadway support.Based on the rock bolt’s tensile characteristics and the mining roadway surrounding rock deformation,a mechanical model for calculating the working resistance of the rock bolt was established and solved.Taking the mining roadway of the 17102(3)working face at the Panji No.3 Coal Mine of China as a research site,with a quadrilateral section roadway,the influence of pretension and anchorage length on the working resistance of high-strength and ordinary rock bolts in the middle and corner of the roadway is studied.The results show that when the bolt is in the elastic stage,increasing the pretension and anchorage length can effectively improve the working resistance.When the bolt is in the yield and strain-strengthening stages,increasing the pretension and anchorage length cannot effectively improve the working resistance.The influence of pretension and anchorage length on the ordinary and high-strength bolts is similar.The ordinary bolt’s working resistance is approximately 25 kN less than that of the high-strength bolt.When pretension and anchorage length are considered separately,the best pretensions of the high-strength bolt in the middle of the roadway side and the roadway corner are 41.55 and 104.26 kN,respectively,and the best anchorage lengths are 1.54 and 2.12 m,respectively.The best anchorage length of the ordinary bolt is the same as that of the high-strength bolt,and the best pretension for the ordinary bolt in the middle of the roadway side and at the roadway corner is 33.51 and 85.12 kN,respectively.The research results can provide a theoretical basis for supporting the design of quadrilateral mining roadways.
文摘为提高无人机对架空输电线路巡检的效率和线路中螺栓缺销的检测精度,提出了改进的你只看一次第7微小版(you only look once version 7-tiny,YOLOv7-tiny)输电线路螺栓缺销检测算法。该算法采用高效的分布移位卷积(distribution shifting convolution,DSConv)来替换YOLOv7-tiny网络中的3×3卷积,以提高模型的计算速度并降低计算复杂度;在模型的检测头部分,添加了高效解耦头结构,以提高模型的准确度和稳定性;并采用明智的交并比(wise intersection over union,WIoU)损失函数来提高正样本的权重,使模型更加关注缺销螺栓目标,以减少正负样本不平衡带来的噪声干扰。实验结果表明,改进YOLOv7-tiny算法对输电线路螺栓缺销检测的平均精度均值达到90.6%,检测速度达到143.0帧/s,同时实现了检测的高速度和高精度。该算法在无人机输电线路巡检中具有一定的优势。
基金This work was financially supported by the National Natural Science Foundation of China(Grant No.52071010).
文摘The hydrogen-induced delayed fracture(HIDF)behavior of a 1300-MPa-grade high-strength bolt steel 42CrMoV containing 0.42 wt.%Cu was investigated by constant load tensile test in a pH 3.5 Walpole solution.It is shown that the addition of Cu is beneficial to enhance the HIDF resistance by~13%.The observation of the fracture surface revealed that the area fraction of brittle crack initiation zone decreased remarkably for the Cu-added steel.Both the corrosion pit depth and the corrosion rate of the Cu-added steel in the Walpole solution are notably decreased,which is primarily because of the formation of a Cu-rich protective compact rust layer and slightly higher corrosion potential.As a result,the absorbed hydrogen content in that solution was also decreased by~21%.It is concluded that the improvement in the HIDF resistance of the tested steel is primarily due to the increase in corrosion resistance and resultant decrease in the absorbed diffusible hydrogen content in the acidic condition.
文摘The condition of bolted connections significantly affects the structural safety.However,conventional bolt tension sensors fail to provide precise measurements due to their bulky size or inadequate stability.This study employs the piezoresistive effect of crystalline silicon material to fabricate an ultrathin sensor.The sensor exhibits a linear relationship between pressure and voltage,an exceptional stability at varying temperatures,and a superior resistance to corrosion,making it adaptable and user-friendly for applications of high-strength bolt tension monitoring.A monitoring system,incorporating the proposed sensor,has also been developed.This system provides real-time display of bolt tension and enables the assessment of sensor and structural conditions,including bolt loosening or component failure.The efficacy of the proposed sensor and monitoring system was validated through a project carried out at the Xiluodu Hydropower Plant.According to the results,the sensor and online monitoring system effectively gauged and proficiently conveyed and stored bolt tension data.In addition,correlations were created between bolt tensions and essential unit parameters,such as water head,active power,and pressures at vital points,facilitating anomaly detection and early warning.
基金Project(51078077)supported by the National Natural Science Foundation of China
文摘To study the seismic performance and load-transferring mechanism of an innovative precast shear wall(IPSW) involving vertical joints, an experimental investigation and theoretical analysis were successively conducted on two test walls. The test results confirm the feasibility of the novel joints as well as the favorable seismic performance of the walls, even though certain optimization measures should be taken to improve the ductility. The load-transferring mechanism subsequently is theoretically investigated based on the experimental study. The theoretical results show the load-transferring route of the novel joints is concise and definite. During the elastic stage, the vertical shear stress in the connecting steel frame(CSF) distributes uniformly; and each high-strength bolt(HSB)primarily delivers vertical shear force. However, the stress in the CSF redistributes when the walls develop into the elastic-plastic stage. At the ultimate state, the vertical shear stress and horizontal normal stress in the CSF distribute linearly; and the HSBs at both ends of the CSF transfer the maximum shear forces.