The characteristics of the flow field associated with a multi-hole combined external rotary bit have been studied by means of numerical simulation in the framework of an RNG k-εturbulence model,and compared with the ...The characteristics of the flow field associated with a multi-hole combined external rotary bit have been studied by means of numerical simulation in the framework of an RNG k-εturbulence model,and compared with the results of dedicated rock breaking drilling experiments.The numerical results show that the nozzle velocity and dynamic pressure of the nozzle decrease with an increase in the jet distance,and the axial velocity of the nozzle decays regularly with an increase in the dimensionless jet distance.Moreover,the axial velocity related to the nozzle with inclination angle 20°and 30°can produce a higher hole depth,while the radial velocity of the nozzle with 60°inclination can enlarge the hole diameter.The outcomes of the CFD simulations are consistent with the actual dynamic rock breaking and pore forming process,which lends credence to the present results and indicates that they could be used as a reference for the future optimization of systems based on the multi-hole combined external rotary bit technology.展开更多
Compared with the in-place pile, the pore-forming pouring pile is more simple and convenient, with a wider range of construction. In the actual construction process, it is able to pass through complex bottom layer and...Compared with the in-place pile, the pore-forming pouring pile is more simple and convenient, with a wider range of construction. In the actual construction process, it is able to pass through complex bottom layer and water layer underground without very high requirements in equipment. The actual bearing capacity of single pile is very strong, so that it can be better to adapt to the actual needs of different scales or the different geological conditions in building. And it has been promoted and used greatly in building construction work [1]. This paper introduces the concept of the pore-forming pouring pile technology, analyzes the pore-forming construction technology and the pile construction technology, then talks about prevention problems of the pore-forming pouring pile construction in House Building Project, at last draws a conclusion that the pore-forming pouring pile technology is the most basic construction technology and is the most effective and convenient way of construction.展开更多
Energy dissipation and scour control are all the key issues for the design of hydraulic structures.On the basis of the high energy dissipation for the multiple slit-type energy dissipaters(M-STED)developed by the auth...Energy dissipation and scour control are all the key issues for the design of hydraulic structures.On the basis of the high energy dissipation for the multiple slit-type energy dissipaters(M-STED)developed by the authors,in this work,the characteristics of the scour hole for the M-STED were experimentally investigated through three sets of those physical models with five cases and a scour hole form index was proposed.The results show that,the M-STED results in not only the high energy dissipation but also the mild upstream slope of the scour hole thanks to the scour hole form index of larger than 0.5,which is in favor of the safety of the release works.展开更多
基金the Science and Technology Innovation and Entrepreneurship Fund of China Coal Technology Engineering Group(2019-TD-QN038,2019-TDQN017)Enterprise Independent Innovation Guidance Project(2018ZDXM05,2019YBXM30).
文摘The characteristics of the flow field associated with a multi-hole combined external rotary bit have been studied by means of numerical simulation in the framework of an RNG k-εturbulence model,and compared with the results of dedicated rock breaking drilling experiments.The numerical results show that the nozzle velocity and dynamic pressure of the nozzle decrease with an increase in the jet distance,and the axial velocity of the nozzle decays regularly with an increase in the dimensionless jet distance.Moreover,the axial velocity related to the nozzle with inclination angle 20°and 30°can produce a higher hole depth,while the radial velocity of the nozzle with 60°inclination can enlarge the hole diameter.The outcomes of the CFD simulations are consistent with the actual dynamic rock breaking and pore forming process,which lends credence to the present results and indicates that they could be used as a reference for the future optimization of systems based on the multi-hole combined external rotary bit technology.
文摘Compared with the in-place pile, the pore-forming pouring pile is more simple and convenient, with a wider range of construction. In the actual construction process, it is able to pass through complex bottom layer and water layer underground without very high requirements in equipment. The actual bearing capacity of single pile is very strong, so that it can be better to adapt to the actual needs of different scales or the different geological conditions in building. And it has been promoted and used greatly in building construction work [1]. This paper introduces the concept of the pore-forming pouring pile technology, analyzes the pore-forming construction technology and the pile construction technology, then talks about prevention problems of the pore-forming pouring pile construction in House Building Project, at last draws a conclusion that the pore-forming pouring pile technology is the most basic construction technology and is the most effective and convenient way of construction.
基金Project supported by the National Natural Science Foundation of China(Grant No.51879129).
文摘Energy dissipation and scour control are all the key issues for the design of hydraulic structures.On the basis of the high energy dissipation for the multiple slit-type energy dissipaters(M-STED)developed by the authors,in this work,the characteristics of the scour hole for the M-STED were experimentally investigated through three sets of those physical models with five cases and a scour hole form index was proposed.The results show that,the M-STED results in not only the high energy dissipation but also the mild upstream slope of the scour hole thanks to the scour hole form index of larger than 0.5,which is in favor of the safety of the release works.