期刊文献+
共找到1,741篇文章
< 1 2 88 >
每页显示 20 50 100
Study on Safeguard System of Eco-tourism Compensation of Hukou Section during Ecological Water-control Project of Poyang Lake 被引量:1
1
作者 龚双双 沈中印 +1 位作者 孙冬英 杨云仙 《Journal of Landscape Research》 2010年第12期58-62,72,共6页
Through analysis on the background to develop eco-tourism and necessity for ecological compensation,based on specific condition of Hukou County,in line with the situation to develop eco-tourism during ecological water... Through analysis on the background to develop eco-tourism and necessity for ecological compensation,based on specific condition of Hukou County,in line with the situation to develop eco-tourism during ecological water control project of Poyang Lake,residents' interest protection system and ecological benefit safeguard system for eco-tourism compensation were put forward. 展开更多
关键词 Poyang Lake ECOLOGICAL water control project ECO-TOURISM COMPENSATION Hukou SECTION
下载PDF
A Study on Cost Control of Agricultural Water Conservancy Projects Based on Activity-based Costing
2
作者 Tiantian TANG 《Asian Agricultural Research》 2017年第7期11-14,共4页
Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through th... Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through the use of literature review,case analysis and statistical analysis and other methods,with agricultural water conservancy projects as the research object,and comparing activity-based costing with the traditional model of cost accounting,the writer carries out the corresponding value chain analysis,and comes to the following conclusion: the statistical calculation and analysis of the entire construction process based on activity-based costing can accurately and effectively control the costs of water conservancy projects. Through the use of activity-based costing,the cost data of agricultural water conservancy projects is more detailed and accurate,and cost management personnel can also find non-value-added activities,optimize the enterprise's value chain and achieve cost control objectives through the analysis of the activity chain and value chain of agricultural water conservancy projects. 展开更多
关键词 Activity-based costing Agricultural water conservancy projects Cost control
下载PDF
Assessment of dam impacts on river flow regimes and water quality:a case study of the Huai River Basin in P.R.China 被引量:2
3
作者 夏军 张永勇 《Journal of Chongqing University》 CAS 2008年第4期261-276,共16页
The Huai River Basin is a unique area in P.R.China with the highest densities of population and water projects.It is also subject to the most serious water pollution.We proposed a distributional SWAT(Soil and Water As... The Huai River Basin is a unique area in P.R.China with the highest densities of population and water projects.It is also subject to the most serious water pollution.We proposed a distributional SWAT(Soil and Water Assessment Tool) model coupled with a water quality-quantity balance model to evaluate dam impacts on river flow regimes and water quality in the middle and upper reaches of the Huai River Basin.We calibrated and validated the SWAT model with data from 29 selected cross-sections in four typical years(1971,1981,1991 and 1999) and used scenario analysis to compensate for the unavailability of historical data regarding uninterrupted river flows before dam and floodgate construction,a problem of prediction for ungauged basins.The results indicate that dam and floodgate operations tended to reduce runoff,decrease peak value and shift peaking time.The contribution of water projects to river water quality deterioration in the concerned river system was between 0 to 40%,while pollutant discharge contributed to 60% to 100% of the water pollution.Pollution control should therefore be the key to the water quality rehabilitation in the Huai River Basin. 展开更多
关键词 DAMS river control river basin projects prediction in ungauged basins flow regime water environment huai River Basin
下载PDF
Floodwater utilization of the Three Gorges Project
4
作者 董前进 《Journal of Chongqing University》 CAS 2009年第2期82-88,共7页
Floods are both risks and resources. Floodwater utilization is an important part of flood management. Considering the rising shortage of water resources, serious water pollution, and undersupply of electric power, it... Floods are both risks and resources. Floodwater utilization is an important part of flood management. Considering the rising shortage of water resources, serious water pollution, and undersupply of electric power, it’s imperative to strengthen flood management. In light of the hydrological characteristics of the Three Gorges Project (TGP) on the Yangtze River in P. R. China, we investigated the necessity and feasibility of TGP floodwater utilization, proprosed dynamic control of limited water level during flood season of the reservoir and basin-wide integrated floodwater management as strategies, and identified problems that might occur in practice. 展开更多
关键词 flood control flood managementi floodwater utilization limited water level in flood seasons Three Gorges project .
下载PDF
Site Selection of Waste Slag Yard and Design of Protective Measures in Water Supply Project of Drawing from the Songhua River in Central Cities of Jilin
5
作者 Hongchao LIU Jun LV 《Meteorological and Environmental Research》 CAS 2021年第4期49-51,共3页
Water supply project of drawing from the Songhua River in central cities of Jilin is taken as research object.On the basis of analyzing project characteristics and natural conditions of the project area,site selection... Water supply project of drawing from the Songhua River in central cities of Jilin is taken as research object.On the basis of analyzing project characteristics and natural conditions of the project area,site selection of waste slag yard of water diversion project and design of water and soil conservation measures are discussed.Rationality of site selection of waste slag yard and pertinence of prevention and control measures of water and soil loss in waste slag yard are analyzed,and comprehensive utilization of waste slag in large-scale production and construction projects is explored. 展开更多
关键词 Waste slag yard Layout principle Prevention and control measures Comprehensive utilization of waste slag water supply project of drawing from the Songhua River Jilin
下载PDF
Key techniques for evaluation of safety monitoring sensors in water conservancy and hydropower engineering 被引量:1
6
作者 Yan XIANG Lin WANG +2 位作者 Zhan-jun WANG Hui YUAN Yun-jie GUAN 《Water Science and Engineering》 EI CAS 2012年第4期440-449,共10页
For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitorin... For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitoring sensors are employed in a majority of engineering projects. These sensors are used to monitor the project during the dam construction and operation periods, and play an important role in reservoir safety operation and producing benefits. With the changing of operating environments and run-time of projects, there are some factors affecting the operation and management of projects, such as a certain amount of damaged sensors and instability of the measured data. Therefore, it is urgent to evaluate existing safety monitoring sensors in water conservancy and hydropower engineering projects. However, there are neither standards nor evaluation guidelines at present. Based on engineering practice, this study examined some key techniques for the evaluation of safety monitoring sensors, including the evaluation process of the safety monitoring system, on-site detection methods of two typical pieces of equipment, the differential resistor sensor and vibrating wire sensor, the on-site detection methods of communication cable faults, and a validity test of the sensor measured data. These key techniques were applied in the Xiaolangdi Water Control Project and Xiaoxi Hydropower Project. The results show that the measured data of a majority of sensors are reliable and reasonable, and can reasonably reflect the structural change behavior in the project operating process, indicating that the availabilities of the safety monitoring sensors of the two projects are high 展开更多
关键词 water conservancy and hydropower engineering safety monitoring sensor Xiaolangdi water control project Xiaoxi Hydropower project
下载PDF
长距离调水工程安全风险综合评估 被引量:1
7
作者 胡江 叶伟 马福恒 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第3期417-426,共10页
以某跨流域、跨多省市的长距离调水工程为例,分析工程安全面临的各类风险事件,确定两座节制闸之间的运行调度渠段为风险评估单元,发展基于层次分析法的风险综合评估模型;以一梁式输水渡槽为例,阐释建筑物风险因子识别、风险事件分析和... 以某跨流域、跨多省市的长距离调水工程为例,分析工程安全面临的各类风险事件,确定两座节制闸之间的运行调度渠段为风险评估单元,发展基于层次分析法的风险综合评估模型;以一梁式输水渡槽为例,阐释建筑物风险因子识别、风险事件分析和风险等级标准划分的方法,描述风险评估过程;以该渡槽所在的运行调度渠段为评估单元,采用层次分析法进行风险综合评估;在此基础上,对其余运行调度渠段进行风险综合评估,讨论造成较大风险的主要原因。结果表明:提出的方法辨识出了较大风险的运行调度渠段,造成运行调度渠段工程安全风险综合评估结果为较大风险的因素可归结为左岸水库溃坝或超调水工程防洪标准泄洪导致的风险、交叉河道过流能力不足风险以及左排下游通道排水不畅风险等,进而有针对性地提出了风险管控措施。研究结果可为类似长距离调水工程安全风险综合评估和管控提供参考。 展开更多
关键词 调水工程 风险评估 工程安全 层次分析法 风险管控
下载PDF
水利工程白蚁防治研究进展 被引量:1
8
作者 高长胜 刘成栋 +1 位作者 孟颖 沈光泽 《水利水运工程学报》 CSCD 北大核心 2024年第3期1-13,共13页
白蚁是一种主要的害堤动物,一直是水利工程安全运行的重大隐患,经济社会的发展和复杂环境的变化对白蚁防治提出了更高的要求。梳理了水利工程白蚁防治中预防、探查、处置三个环节的研究进展,阐述了白蚁防治关键技术的基本原理、适用场... 白蚁是一种主要的害堤动物,一直是水利工程安全运行的重大隐患,经济社会的发展和复杂环境的变化对白蚁防治提出了更高的要求。梳理了水利工程白蚁防治中预防、探查、处置三个环节的研究进展,阐述了白蚁防治关键技术的基本原理、适用场景及应用效果;回顾了白蚁监测预警技术的发展过程,介绍了技术原理、系统架构和功能实现;总结了白蚁综合防治技术的实践及探索,探讨了现阶段白蚁防治技术的适用性和局限性。在此基础上提出了对白蚁习性规律、白蚁蚁巢精准探测、白蚁智能监控预警、堤坝动物危害风险评估、白蚁防治综合治理及体制机制建设等研究方向的思考,为促进白蚁防治更加精准高效、绿色智能提供借鉴。 展开更多
关键词 水利工程 白蚁防治 监测预警 综合治理 对策展望
下载PDF
南水北调中线水源区农田面源污染防治现状分析与对策建议
9
作者 辛小康 王超 +4 位作者 柳根 程靖华 秦赫 陈正友 肖新宗 《中国水利》 2024年第20期81-88,共8页
为进一步明晰当前南水北调中线水源区污染来源,精准开展水源地水质保护,采用2017—2023年长系列水质资料,分析丹江口水库及入库河流水质特征,采用资料收集、文献调研及模型计算等方法,估算总氮、总磷污染负荷组成,采用实证分析方法分析... 为进一步明晰当前南水北调中线水源区污染来源,精准开展水源地水质保护,采用2017—2023年长系列水质资料,分析丹江口水库及入库河流水质特征,采用资料收集、文献调研及模型计算等方法,估算总氮、总磷污染负荷组成,采用实证分析方法分析了南水北调中线水源区面源污染治理存在的问题并提出对策建议。结果表明:丹江口水库总体水质良好,整体可达到Ⅱ类水质目标(湖库水质标准),但汛期水量较大时因总磷浓度升高会引起超标断面个数明显增加,以2021年和2023年丹江口水库实现170 m正常蓄水位的年份最为典型,而此时汉江、丹江等主要入库河流水质也下降,由以往Ⅱ类下降为Ⅲ类(河流水质标准)。无论是枯水年、丰水年,农田面源污染均已成为影响丹江口水库水质主导因素,总氮贡献率分别达到85.16%和57.73%,总磷贡献率分别达到77.74%和57.17%。当前水源区农田面源污染治理存在农田面源底数不清、农民减施化肥农药积极性不高、生态产品价值实现机制不顺等问题,迫切需要加强南水北调中线水源区农田面源污染防治。提出建立“天空地”一体化面源污染监测预警体系,研究新型高效生物农药、生物肥料,开展沟塘水系面源阻控体系建设,研究生态产品价值实现机制等对策建议。 展开更多
关键词 南水北调中线 水源区 农田面源污染 防治对策
下载PDF
水利工程白蚁防控技术体系构建的研究
10
作者 于保庭 郝晓伟 宋晓钢 《中华卫生杀虫药械》 CAS 2024年第4期394-397,共4页
水利工程蚁害风险不容忽视,构建白蚁防控技术体系尤为必要。通过对水利工程白蚁防控对象、防控目标、总体策略进行探讨,明确水利工程白蚁防控应建立“控、防、治、测、填”的技术体系,采取日常防控、蚁情调查、方案设计、防治实施、质... 水利工程蚁害风险不容忽视,构建白蚁防控技术体系尤为必要。通过对水利工程白蚁防控对象、防控目标、总体策略进行探讨,明确水利工程白蚁防控应建立“控、防、治、测、填”的技术体系,采取日常防控、蚁情调查、方案设计、防治实施、质效评价的工作流程,在白蚁防治用品选择、白蚁预防对象确定、保证结构安全方面加强质量管理,强化科技赋能,全面推动水利工程白蚁防控工作规范开展。 展开更多
关键词 水利工程 白蚁防控 技术体系 工作流程 质量管理
下载PDF
流域水资源调配关键技术研究
11
作者 巴音达拉 魏光辉 +2 位作者 陈红川 宋莹 谢镇泽 《电脑与电信》 2024年第4期10-13,共4页
长距离调水工程往往具有规模大、管理难、条件差和系民生等特点,根据中央提出的关于加快构建“系统完备、安全可靠,集约高效、绿色智能,循环通畅、调控有序”的国家水网的要求,以提升流域水资源调配能力为目的,通过建设自动化和信息化软... 长距离调水工程往往具有规模大、管理难、条件差和系民生等特点,根据中央提出的关于加快构建“系统完备、安全可靠,集约高效、绿色智能,循环通畅、调控有序”的国家水网的要求,以提升流域水资源调配能力为目的,通过建设自动化和信息化软件,推行扁平化改革,压缩管理层级,形成高效的水资源调配管理新模式。通过对某流域调水工程信息化系统的建设,开发水资源管控、流量平衡和恒水位控制系统,能够满足水资源调配业务的需求。 展开更多
关键词 调水工程 水资源管控 水量平衡 恒水位控制
下载PDF
对某城乡供水工程自动化控制的设计和应用研究
12
作者 王艳平 《云南水力发电》 2024年第2期25-29,共5页
城乡供水自动化是解决农村饮水安全的重要措施,能够有效保证供水工程的管理决策能力和应用服务水平。总结了某城乡供水项目中自动化控制的设计和应用,不仅能有效的弥补水利工程建设过程中存在的不足,此外在实现水利工程长远发展、提高... 城乡供水自动化是解决农村饮水安全的重要措施,能够有效保证供水工程的管理决策能力和应用服务水平。总结了某城乡供水项目中自动化控制的设计和应用,不仅能有效的弥补水利工程建设过程中存在的不足,此外在实现水利工程长远发展、提高水利工程管理水平中也发挥了重要性作用,可以实现城乡供水后期运行中节水、减员、降本、增效的功能优势,推动了城乡供水的均等化服务,有效巩固当地的脱贫攻坚工作。 展开更多
关键词 城乡供水工程 自动化控制 需求分析 必要性 自控设计方案
下载PDF
广东省流域控制性水利工程管理体制优化研究 被引量:3
13
作者 肖洵 谭超 +3 位作者 黄本胜 罗志发 张世发 李宁宁 《水利经济》 北大核心 2024年第3期102-108,共7页
针对流域控制性水利工程存在管理主体多样、政府职能“缺位”、流域管理机构统筹监管能力不足等问题,为理顺流域控制性水利工程管理体制,在文献调研基础上提出了流域控制性水利工程定义,梳理确定了广东省流域控制性水利工程名录,提出了... 针对流域控制性水利工程存在管理主体多样、政府职能“缺位”、流域管理机构统筹监管能力不足等问题,为理顺流域控制性水利工程管理体制,在文献调研基础上提出了流域控制性水利工程定义,梳理确定了广东省流域控制性水利工程名录,提出了省级流域控制性水利工程的5项条件,并结合国内外流域控制性水利工程管理体制建立的经验,提出了优化广东省流域控制性水利工程管理体制的具体措施。研究结果表明:广东省有新丰江水库等流域控制性水利工程22宗,其中应纳入省级管理的省级流域控制性水利工程有15宗,流域控制性水利工程应按照提出的分级管理、统筹调度、协同运维的管理模式加强管理。 展开更多
关键词 流域控制性水利工程 多目标管理 管理体制 分级管理 广东省
下载PDF
我国水污染防治资金项目成效、管理经验与优化实施建议
14
作者 陈强 董姣 +2 位作者 赵少延 赵丽 姜霞 《环境工程技术学报》 CAS CSCD 北大核心 2024年第2期672-680,共9页
水污染防治资金自2015年设立以来,中央和地方政府部门在加强与规范资金项目管理方面开展了大量工作,为提高资金使用效益发挥了重要作用。但目前针对水污染防治资金项目管理的研究较少,也缺少相关经验做法总结。基于环境状况公报、绩效... 水污染防治资金自2015年设立以来,中央和地方政府部门在加强与规范资金项目管理方面开展了大量工作,为提高资金使用效益发挥了重要作用。但目前针对水污染防治资金项目管理的研究较少,也缺少相关经验做法总结。基于环境状况公报、绩效评价等数据,分析了项目在推动水质改善、促进生态修复、建立长效机制、带动社会投入等方面取得的成效;从资金投向、项目谋划、资金分配、资金使用、绩效评价等方面梳理总结了水污染防治资金设立以来的项目管理经验,并通过调研提炼了部分省(区)在制度建设、项目谋划、过程监管、绩效管理等方面的典型做法;同时,分析了现阶段水污染防治资金项目管理存在的资金支持范围有待拓宽、项目谋划系统性有待提升、技术保障有待加强、绩效管理有待优化等问题。为进一步提升资金项目管理水平、提高资金使用效益,提出如下建议:结合新时期水生态环境保护重点任务和地方实际需求,合理拓宽资金支持范围;坚持流域统筹,提升项目谋划系统性;制定完善技术指导文件,强化技术保障;完善绩效管理制度,加强成效监管。 展开更多
关键词 水污染防治资金 项目管理 典型做法 绩效管理
下载PDF
水下项目质量管理经验浅谈
15
作者 张柏青 《中国标准化》 2024年第14期193-197,共5页
针对水下项目质量管理中存在的问题,本文探讨了水下项目质量管理,强调其对公司综合竞争力的提升作用,分析了项目质量管理的核心内容,包括质量方针、质量管理体系、质量策划、质量控制、质量保证和质量改进等,并深入探讨了项目质量控制... 针对水下项目质量管理中存在的问题,本文探讨了水下项目质量管理,强调其对公司综合竞争力的提升作用,分析了项目质量管理的核心内容,包括质量方针、质量管理体系、质量策划、质量控制、质量保证和质量改进等,并深入探讨了项目质量控制的关键环节。结合实际案例,提出了实施全面的项目质量管理流程,并针对存在的问题提出了改进措施,强调了风险管理在项目执行中的重要性,并提出了有效的风险管理策略,对于提升水下项目的整体质量和效率具有重要意义。 展开更多
关键词 深水项目 项目质量 质量控制 质量监督 质量管理
下载PDF
汉江兴隆水利枢纽下游近坝河段枯水位下降及成因分析 被引量:1
16
作者 陈柯兵 高玉磊 +3 位作者 朱玲玲 由星莹 樊咏阳 邓乐乐 《湖泊科学》 EI CAS CSCD 北大核心 2024年第4期1220-1231,共12页
汉江兴隆水利枢纽运行后,坝下游近坝段枯水位较建坝前下降明显,500~800 m^(3)/s流量下,2021年较运行前坝下水位累计下降2.47~2.55 m,对工程安全及效益发挥带来不利影响。基于水文、断面、水下地形等观测资料,对枯水位下降的原因进行深... 汉江兴隆水利枢纽运行后,坝下游近坝段枯水位较建坝前下降明显,500~800 m^(3)/s流量下,2021年较运行前坝下水位累计下降2.47~2.55 m,对工程安全及效益发挥带来不利影响。基于水文、断面、水下地形等观测资料,对枯水位下降的原因进行深入剖析。结果表明,兴隆水利枢纽的拦沙作用有限,皇庄以上沙量减少是兴隆以下河床冲刷加剧的重要原因,高水调平导致的年内枯水上滩几率下降和航道整治护滩工程是强冲刷过程中“滩淤槽冲”的核心因素。坝下游河段枯水河槽冲刷及汉口最低水位下降是造成兴隆近坝段枯水位下降的直接原因。随机森林算法分析显示,对兴隆坝下水位变化影响最大的因素为兴隆站输沙率的锐减。此外,航道整治工程、河床边界条件对枯水位下降也有十分重要的驱动作用。兴隆坝址及下游河段的河床组成偏细,2012-2022年虽然河床剧烈冲刷,但床沙组成没有出现粗化的现象,预计河床仍将继续冲刷下切,枯水位尚未达到稳定状态。 展开更多
关键词 汉江 兴隆水利枢纽 河床冲刷 枯水位下降 随机森林
下载PDF
水泥灌浆全过程物联网监测系统研究
17
作者 周治刚 丁晔 +2 位作者 黄帆 谭松成 李昌平 《人民长江》 北大核心 2024年第11期250-256,共7页
在水利水电工程建设中,帷幕灌浆工程量大,需采用智能灌浆全过程物联网监测系统替代常规灌浆记录仪,以规范施工操作。设计了一种包含制浆机、灌浆泵及储浆桶的水泥灌浆全过程物联网监测系统,集成智能传感器、PLC、物联网网关模块等设备,... 在水利水电工程建设中,帷幕灌浆工程量大,需采用智能灌浆全过程物联网监测系统替代常规灌浆记录仪,以规范施工操作。设计了一种包含制浆机、灌浆泵及储浆桶的水泥灌浆全过程物联网监测系统,集成智能传感器、PLC、物联网网关模块等设备,利用物联网网关云服务器数据爬取技术实现进浆及返浆流量、进浆密度、压力等数据的采集和处理,并能提供触摸屏人机交互及数据存储功能,且实现了远程物联透传显示及控制。该系统已在南水北调中线雄安调蓄库灌浆试验工程中付诸应用,结果表明:该系统运行稳定,数据实时性好,为实现全过程智能灌浆和管控奠定了基础。 展开更多
关键词 水泥灌浆 物联网监测 智能传感器 PLC控制 远程监控 南水北调中线
下载PDF
水工程联合调度知识图谱构建与应用研究 被引量:1
18
作者 黄艳 王权森 +3 位作者 卢程伟 关雄 郑浩 周涛 《人民长江》 北大核心 2024年第9期1-9,共9页
为了将水工程调度与新一代信息技术进行深度融合,立足流域水工程调度业务需求,按照知识建模、知识抽取、知识存储以及知识应用的总体思路,提出了合理可行的水工程联合调度知识图谱构建与应用总体技术方案,以及场景驱动的水工程联合调度... 为了将水工程调度与新一代信息技术进行深度融合,立足流域水工程调度业务需求,按照知识建模、知识抽取、知识存储以及知识应用的总体思路,提出了合理可行的水工程联合调度知识图谱构建与应用总体技术方案,以及场景驱动的水工程联合调度本体构建方法。具体阐述了结构化、非结构化信息挖掘与知识抽取技术以及基于Neo4j图数据库的知识索引与可视化,并从防洪调度、水资源调配两个方面探索知识图谱的应用实例与发展方向。研究初步实现了调度知识图谱构建全流程贯通,可为知识图谱在水工程联合调度领域的进一步发展与应用提供借鉴。 展开更多
关键词 水工程联合调度 知识图谱 本体构建 防洪调度 水资源调配
下载PDF
三峡工程蓄水运用20年综合效益发挥与展望 被引量:1
19
作者 胡兴娥 曹瑞 《长江科学院院报》 CSCD 北大核心 2024年第6期1-9,共9页
三峡工程自2003年蓄水发电至今已运行20 a,初步设计主要功能全部实现,并适应运行条件变化和发展需求持续优化运行方式,防洪、发电、航运、水资源利用等综合效益全面发挥。截至2023年底,三峡工程累计拦洪运用66次,拦蓄洪水超2 088亿m^(3)... 三峡工程自2003年蓄水发电至今已运行20 a,初步设计主要功能全部实现,并适应运行条件变化和发展需求持续优化运行方式,防洪、发电、航运、水资源利用等综合效益全面发挥。截至2023年底,三峡工程累计拦洪运用66次,拦蓄洪水超2 088亿m^(3),确保了荆江河段防洪安全,极大减轻了长江中下游防洪压力;累计发出清洁电能超16 600亿kW·h,相当于节约标准煤5.1亿t,减少二氧化碳排放13.3亿t;极大改善了库区与长江中游航道条件,累计通过货运量超20亿t,有力促进了长江航运快速发展;枯水期累计向下游补水约3 400亿m^(3),有效保障了长江中下游供水安全;生态调度成效显著,四大家鱼资源量明显恢复。为了应对频发的极端水文事件带来的风险和挑战,确保三峡工程长期安全运行和持续发挥巨大综合效益,从推进气象水文预报技术研究与应用、三峡水库调度运行方案优化、创新成果转化运用、智慧化管理等方面提出了下一步工作展望。 展开更多
关键词 三峡工程 综合效益 防洪 发电 航运 水资源利用
下载PDF
突发水污染事件风险分析——以引江济淮工程(河南段)为例 被引量:1
20
作者 余姚果 赵子昂 +3 位作者 陈喆 蒋恒 郭深深 陈钊 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第2期291-298,共8页
从交通事故风险、污水排入风险以及其他风险等方面识别引江济淮工程(河南段)突发水污染事件的风险源,建立适应性的风险评价指标体系、指标等级划分标准和风险等级评价模型,综合评估7个评价河段突发水污染事件风险等级。结果表明:2个评... 从交通事故风险、污水排入风险以及其他风险等方面识别引江济淮工程(河南段)突发水污染事件的风险源,建立适应性的风险评价指标体系、指标等级划分标准和风险等级评价模型,综合评估7个评价河段突发水污染事件风险等级。结果表明:2个评价河段的风险等级为重大(Ⅱ级),5个评价河段的风险等级为较大(Ⅲ级)。从降低风险源危险性、提高风险控制有效性等方面提出突发水污染事件风险管控对策措施。本研究为降低引江济淮工程(河南段)突发水污染事件的发生概率和危害程度提供了支撑,对发挥工程综合效益、保障受水区供水安全、维护良好的水生态环境具有重要意义。 展开更多
关键词 河南省 引江济淮工程 突发水污染事件 风险评价 风险管控
下载PDF
上一页 1 2 88 下一页 到第
使用帮助 返回顶部