There widely occur stretches of permafrost at more than 3,800-4,200 meters above sea level in the source area of the Huanghe (Yellow) River. The periglacial geomorphology develops quite well, including frozen disinteg...There widely occur stretches of permafrost at more than 3,800-4,200 meters above sea level in the source area of the Huanghe (Yellow) River. The periglacial geomorphology develops quite well, including frozen disintegration geomorphology, freezing and thawing geomorphology in cold environments, periglacial dune, buried ices and fossil periglacial phenomena. In light of the relation between stratigraphy and periglacial phenomena, three periglacial periods can be divided, which are the Middle Pleistocene periglacial period, the Late Pleistocene periglacial period and modern periglacial period.展开更多
The upper Huanghe(Yellow) River basin is situated in the northeast of the Qinghai Xizang(Tibet)Plateau of China. The melt water from the snow cover is main water supply for the rivers in the region during springtime a...The upper Huanghe(Yellow) River basin is situated in the northeast of the Qinghai Xizang(Tibet)Plateau of China. The melt water from the snow cover is main water supply for the rivers in the region during springtime and other arid regions of the northwestern China, and the hydrological conditions of the rivers are directly controlled by the snowmelt water in spring. So snowmelt runoff forecast has importance for hydropower, flood prevention and water resources utilization. The application of remote sensing and Geographic Information System (GIS) techniques in snow cover monitoring and snowmelt runoff calculation in the upper Huanghe River basin are introduced amply in this paper. The key parameter-snow cover area can be computed by satellite images from multi platform, multi temporal and multi spectral. A cluster of snow cover data can be yielded by means of the classification filter method. Meanwhile GIS will provide relevant information for obtaining the parameters and also for zoning. According to the typical samples extracting snow covered mountainous region, the snowmelt runoff calculation models in the upper Huanghe River basin are presented and they are mentioned in detail also. The runoff snowmelt models based on the snow cover data from NOAA images and observation data of runoff, precipitation and air temperature have been satisfactorily used for predicting the inflow to the Longyangxia Reservoir , which is located at lower end of snow cover region and is one of the largest reservoirs on the upper Huanghe River, during late March to early June. The result shows that remote sensing techniques combined with the ground meteorological and hydrological observation is of great potential in snowmelt runoff forecasting for a large river basin. With the development of remote sensing technique and the progress of the interpretation method, the forecast accuracy of snowmelt runoff will be improved in the near future. Large scale extent and few stations are two objective reality situations in China, so they should be considered in simulation and forecast. Apart from dividing, the derivation of snow cover area from satellite images would decide the results of calculating runoff. Field investigation for selection of the learning samples of different snow patterns is basis for the classification.展开更多
In the stability study of the regional structures in the area of the Longyang Gorge Hydroelectrical Power Station, a model of the current stress-deformation field of the area was constructed based on analyses of avail...In the stability study of the regional structures in the area of the Longyang Gorge Hydroelectrical Power Station, a model of the current stress-deformation field of the area was constructed based on analyses of available data of regional surveys and historical earthquakes and field investigations of active faults and ancient earthquakes. This model was examined and verified by physical and mathematical simulation experiments, and quantitative relations and data were obtained.展开更多
文摘There widely occur stretches of permafrost at more than 3,800-4,200 meters above sea level in the source area of the Huanghe (Yellow) River. The periglacial geomorphology develops quite well, including frozen disintegration geomorphology, freezing and thawing geomorphology in cold environments, periglacial dune, buried ices and fossil periglacial phenomena. In light of the relation between stratigraphy and periglacial phenomena, three periglacial periods can be divided, which are the Middle Pleistocene periglacial period, the Late Pleistocene periglacial period and modern periglacial period.
文摘The upper Huanghe(Yellow) River basin is situated in the northeast of the Qinghai Xizang(Tibet)Plateau of China. The melt water from the snow cover is main water supply for the rivers in the region during springtime and other arid regions of the northwestern China, and the hydrological conditions of the rivers are directly controlled by the snowmelt water in spring. So snowmelt runoff forecast has importance for hydropower, flood prevention and water resources utilization. The application of remote sensing and Geographic Information System (GIS) techniques in snow cover monitoring and snowmelt runoff calculation in the upper Huanghe River basin are introduced amply in this paper. The key parameter-snow cover area can be computed by satellite images from multi platform, multi temporal and multi spectral. A cluster of snow cover data can be yielded by means of the classification filter method. Meanwhile GIS will provide relevant information for obtaining the parameters and also for zoning. According to the typical samples extracting snow covered mountainous region, the snowmelt runoff calculation models in the upper Huanghe River basin are presented and they are mentioned in detail also. The runoff snowmelt models based on the snow cover data from NOAA images and observation data of runoff, precipitation and air temperature have been satisfactorily used for predicting the inflow to the Longyangxia Reservoir , which is located at lower end of snow cover region and is one of the largest reservoirs on the upper Huanghe River, during late March to early June. The result shows that remote sensing techniques combined with the ground meteorological and hydrological observation is of great potential in snowmelt runoff forecasting for a large river basin. With the development of remote sensing technique and the progress of the interpretation method, the forecast accuracy of snowmelt runoff will be improved in the near future. Large scale extent and few stations are two objective reality situations in China, so they should be considered in simulation and forecast. Apart from dividing, the derivation of snow cover area from satellite images would decide the results of calculating runoff. Field investigation for selection of the learning samples of different snow patterns is basis for the classification.
文摘In the stability study of the regional structures in the area of the Longyang Gorge Hydroelectrical Power Station, a model of the current stress-deformation field of the area was constructed based on analyses of available data of regional surveys and historical earthquakes and field investigations of active faults and ancient earthquakes. This model was examined and verified by physical and mathematical simulation experiments, and quantitative relations and data were obtained.