Tempo-spatial characteristics and influential factors of rockburst:a case study of transportation and drainage tunnels in Jinping Ⅱ hydropower station 被引量:5
1
作者 Lipeng Liu1, 2, Xiaogang Wang1, Yizhong Zhang3, Zhixin Jia1, Qingwei Duan1 1 Department of Geotechnical Engineering, China Institute of Water Resources and Hydropower Research, Beijing, 100048, China 2 School of Engineering and Technology, China University of Geosciences, Beijing, 100083, China 3 Beijing Vibroflotation Engineering Co., Ltd., Beijing, 100102, China 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第2期179-185,共7页
Jinping Ⅱ hydropower station is located in a high in-situ stress region in Southwest China. During the excavations of the transportation and drainage tunnels, more than 460 rockburst events were recorded in the trans... Jinping Ⅱ hydropower station is located in a high in-situ stress region in Southwest China. During the excavations of the transportation and drainage tunnels, more than 460 rockburst events were recorded in the transportation tunnel and 110 in the drainage tunnel, which has a serious and negative influence on the tunnels' construction and the safety of staff and equipment. In the paper, the characters of rockburst patterns are analyzed for the transportation and drainage tunnels. The results are illustrated as follow: (1) Most of intensive rockbursts occur in the layer T2b, and continuous occurrences of rockbursts are more frequently observed than those in other layers. (2) The critical overburden depth of rockburst in the transportation tunnel is 600 m, and the length of the continuous occurrence section of rockburst is smaller than 25 m. The damaged depth of the rockburst has the tendency to increase with the increasing overburden depth, and the maximum damaged depth is over 3.5 m. (3) From east to west (west to east) in Jinping Ⅱ hydropower station, the rockburst usually takes place in the right (left) side of tunnel working face, and then the left (right) or roof of the tunnel. The total length of the continuous occurrence section of rockburst is 57.4%-62.2% of the overall rockburst length, followed by the rockbursts of flake-splitting type and other types. (4) Compared with the transportation tunnel, the intensity of rockburst in the drainage tunnel is higher while the length of the continuous occurrence section of rockburst is smaller. The rockburst section with length less than 10 m and depth of 1 m mainly occurs in the layer at a depth of 1 800-2 000 m. The influences of opening geometry and excavation method on the characteristics of the adjacent zone are great, but the influence of the stress among the tunnel group induced by excavation is relatively low. 展开更多
关键词 Jinping hydropower station ROCKBURST developing pattern influential factor
下载PDF
Key rock mechanical problems of underground powerhouse in Shuibuya hydropower station 被引量:2
2
作者 Aiqing Wu1,Qigui Yang2,Xiuli Ding1,Huoming Zhou1,Bo Lu1 1 Key Laboratory of Geotechnical Mechanics and Engineering of Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan 430010,China 2 Changjiang Institute of Survey,Planning,Design and Research,Wuhan,430010,China 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第1期64-72,共9页
The complicated rock structures and the stability of surrounding rocks of the underground powerhouse were the key rock mechanical problems in Shuibuya hydropower station.In order to overcome the related rock mechanica... The complicated rock structures and the stability of surrounding rocks of the underground powerhouse were the key rock mechanical problems in Shuibuya hydropower station.In order to overcome the related rock mechanical problems encountered during its construction,a comprehensive research was carried out for the underground powerhouse in Shuibuya hydropower station based on a detailed geological survey.It covers the investigations on the initial in-situ stress distribution features,rock mechanical properties,engineering rock mass classifications by different methods,numerical modeling for stability and support analysis,proper measures for rock excavation and support.The results show that the rock excavations of the underground powerhouse under the given geological conditions can be controlled effectively.Some measures,suggested by the designers,are proved to be rational and effective.These measures mainly consist of:(1) the soft rock replacements by concrete in local area below the crane beam,(2) the shotcrete and reinforcement by rock bolts and anchor cables in surrounding rocks,and (3) 2 m concrete placement on the rock bench between adjacent tailrace tubes.The engineering practice shows that the treated surrounding rocks have a good overall stability.The deformation behaviors observed by safety equipments are within the designing limits.The research conclusions on the related rock mechanical problems,prior to the underground powerhouse excavations,are reliable. 展开更多
关键词 Shuibuya hydropower station underground powerhouse stability of surrounding rocks rock excavation and support soft rock replacement
下载PDF
Safety monitoring and stability analysis of left abutment slope of Jinping Ⅰ hydropower station
3
作者 Shengwu Song, Dewen Cai, Xuemin Feng, Xiaopeng Chen, Dikai Wang Chengdu Hydroelectric Investigation and Design Institute, China Hydropower Engineering Consulting Group Corporation, Chengdu, 610072, China 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第2期117-130,共14页
Safety monitoring and stability analysis of high slopes are important for high dam construction in high mountainous regions or precipitous gorges. In this paper, deformation characteristics of toppling block at upper ... Safety monitoring and stability analysis of high slopes are important for high dam construction in high mountainous regions or precipitous gorges. In this paper, deformation characteristics of toppling block at upper abutment, deforming tensile rip wedge in the middle part and deep fractures are comprehensively analyzed based on the geological conditions, construction methods and monitoring results of left abutment slope in Jinping I hydropower station. Safety analyses of surface and shallow-buried rock masses and the corresponding anchorage system are presented. The monitoring results indicate that the global stability of the large wedge block in the left abutment is effectively under control, and the abutment slope is stable in a global sense. After the completion of excavation, the deformations of toppling block at the top of the slope and deep fracture zone continue at a very low rate, which can be explained as "rock mass creep". Further monitoring and analysis are needed. 展开更多
关键词 Jinping hydropower station left abutment slope safety monitoring analysis and evaluation stability analysis
下载PDF
Decision-making model for risk management of cascade hydropower stations
4
作者 Pan, Bangchuan Chi, Hong +1 位作者 Xu, Jianguo Qi, Mingliang 《Journal of Southeast University(English Edition)》 EI CAS 2008年第S1期22-26,共5页
In a medium-term electricity market,in order to reduce the risks of price and inflow uncertainties, the cascade hydropower stations may use the options contract with electricity supply companies. A profit-based model ... In a medium-term electricity market,in order to reduce the risks of price and inflow uncertainties, the cascade hydropower stations may use the options contract with electricity supply companies. A profit-based model for risk management of cascade hydropower stations in the medium-term electricity market is presented. The objective function is profit maximization of cascade hydropower stations. In order to avoid the risks of price and inflow uncertainties, two different risk-aversion constraints: a minimum profit constraint and a minimum conditional value-at-risk, are introduced in the model. In addition, the model takes into account technology constraints of the generating units, which includes reservoir flow balance, reservoir capacity limits, water discharge constraints, etc. The model is formulated as a mixed integer nonlinear programming problem. Because the search space of the solution is very large, a genetic algorithm is used to deal with the problem. 展开更多
关键词 cascade hydropower station mixed integer nonlinear programming risk management medium-term electricity market
下载PDF
Study on Risk Dispatch Model of Hydropower Station in the Market Environment
5
作者 Duan Jinchang and Ding Jie State Grid Electric Power Research Institute 《Electricity》 2011年第4期38-40,共3页
In the power market environment, due to the uncertainty of the reservoir inflow and the pool purchase price, it is very important to research power generation risk dispatch of hydropower plants, taking into considerat... In the power market environment, due to the uncertainty of the reservoir inflow and the pool purchase price, it is very important to research power generation risk dispatch of hydropower plants, taking into consideration the benefits and risk control of both sides. This paper investigates power generation risk dispatch of hydropower plants in the market environment, and proposes a mathematical model which considers maximization of benefits and risk control, reflects control willingness of risk and benefits, resolves it with the PSO algorithm, finding more economic and reasonable results. The feasibility and validity of the model and resolving methods are verified by an example. 展开更多
关键词 hydropower station optimal dispatch risk dispatch model PSO algorithm
下载PDF
TianshengqiaoⅠcascade and Ⅱ cascade hydropower stations completely built up
6
《Electricity》 2001年第1期50-50,共1页
关键词 cascade hydropower stations completely built up Tianshengqiao cascade and
下载PDF
Practice of Centralized Control over Cascade Hydropower Stations
7
作者 Jin Zehua General Manager, Guizhou Wujiang Hydropower Development Ltd. 《Electricity》 2010年第1期44-47,共4页
Isolated operation of hydropower stations on Wujinag River was seen disadvantages of low rate of water utilization and much loss of electricity caused by abandoned water during low load periods. To tackle the problem,... Isolated operation of hydropower stations on Wujinag River was seen disadvantages of low rate of water utilization and much loss of electricity caused by abandoned water during low load periods. To tackle the problem, centralized control over cascade hydropower stations is practiced with a considerable economic benef it gained. 展开更多
关键词 RATE Practice of Centralized Control over Cascade hydropower stations OVER
下载PDF
Mianhuatan Hydropower Station Project of Fujian Provinceformally started to construct
8
《Electricity》 1998年第2期45-45,共1页
关键词 PROJECT Mianhuatan hydropower station Project of Fujian Province formally started to construct
下载PDF
ABB Chongqing Co. Ltd Will Provide 500 kV Transformers for Three Gorges Hydropower Station Project
9
《Electricity》 2000年第2期58-58,共1页
关键词 Ltd Will Provide 500 kV Transformers for Three Gorges hydropower station Project ABB Chongqing Co KV
下载PDF
Baozhusi Hydropower Station turned over formally
10
《Electricity》 2001年第1期6-6,共1页
关键词 OVER Baozhusi hydropower station turned over formally
下载PDF
Proposal to build Gongboxia Hydropower Station Project has been approved
11
《Electricity》 2001年第1期51-51,共1页
关键词 PROJECT Proposal to build Gongboxia hydropower station Project has been approved
下载PDF
Guangzhou Pumped-storage Hydropower Station,the Largest in the World is Completed
12
《Electricity》 2000年第2期56-56,共1页
关键词 World Guangzhou Pumped-storage hydropower station the Largest in the World is Completed
下载PDF
Planning Study on National Power Grid Interconnection Centered on Three Gorges Hydropower Station
13
作者 Zhou Xiaoqian(President, China Power Crid Construction Corporation) 《Electricity》 1999年第2期2-3,共2页
关键词 Planning Study on National Power Grid Interconnection Centered on Three Gorges hydropower station GRID
下载PDF
The First Unit of Tianshengqiao No.1 Hydropower Station and Tian-Guang 500 kV Second Line Commissioned
14
《Electricity》 1999年第2期48-48,共1页
关键词 KV The First Unit of Tianshengqiao No.1 hydropower station and Tian-Guang 500 kV Second Line Commissioned
下载PDF
Effects of Mountain Rivers Cascade Hydropower Stations on Water Ecosystems
15
作者 Mengtian Sun Kai Huang +2 位作者 Jinhua Shao Weixiong Wu Xinyue Liang 《Research in Ecology》 2022年第1期17-26,共10页
China is rich in hydropower resources,and mountain rivers have abundant water resources and huge development potential,which have a profound impact on the pattern of water resources allocation in China.As the main way... China is rich in hydropower resources,and mountain rivers have abundant water resources and huge development potential,which have a profound impact on the pattern of water resources allocation in China.As the main way of water resources and hydropower development,the construction of cascade hydropower stations,while meeting the requirements of water resources utilization for social development,has also brought adverse effects on river ecosystems.Therefore,the impact of the construction of cascade hydropower stations on mountainous river ecosystems,where the minimum ecological flow of rivers must be ensured and reviewed.In addition,this paper proposed the deficiencies and outlooks for cascade hydropower stations based on previous research results. 展开更多
关键词 Mountain rivers Cascade hydropower stations Development and operations Ecological flow Water ecosystems Effects and countermeasures
下载PDF
Jinhe Hydropower Station broke ground
16
《Electricity》 2001年第4期43-43,共1页
关键词 Jinhe hydropower station broke ground
下载PDF
Power transmission scheme of Longtan Hydropower Station is defined
17
《Electricity》 2001年第4期43-43,共1页
关键词 Power transmission scheme of Longtan hydropower station is defined
下载PDF
The first 400 MW unit of Lijiaxia Hydropower Station Commissioned
18
《Electricity》 1997年第1期48-48,共1页
关键词 The first 400 MW unit of Lijiaxia hydropower station Commissioned
下载PDF
The Investment intention Letter of Sino-Thailand Jinghong Hydropower Station was Signed
19
《Electricity》 2000年第2期49-49,共1页
关键词 The Investment intention Letter of Sino-Thailand Jinghong hydropower station was Signed
下载PDF
Hongjiadu and Yinzidu hydropower stations on Wujiang River were successfully cut off
20
《Electricity》 2001年第4期7-7,共1页
关键词 Hongjiadu and Yinzidu hydropower stations on Wujiang River were successfully cut off
下载PDF