期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Guidelines Procurement under IBRD Loans and IDA Credits
1
《中国招标》 1996年第Z1期21+24-46,共24页
I. INTRODUCTIONPurpose1.1 The purpose of these Guidelines is to informthose carrying out a project that is financed in wholeor in part by a loan from the International Bank forReconstruction and Development (IBRD) or ... I. INTRODUCTIONPurpose1.1 The purpose of these Guidelines is to informthose carrying out a project that is financed in wholeor in part by a loan from the International Bank forReconstruction and Development (IBRD) or a creditfrom the International Development Association(IDA), of the arrangements to be made for procur-ing the goods and works (including relatedservices) required for the project. The Loan Agree-ment governs the legal relationships between the Bor-rower and the Bank, and the Guidelines are made ap-plicable to procurement of goods and works for theproject, as provided in the agreement. The rightsand obligations of the Borrower and the providers ofgoods and works for the project are governed by thebidding documents, and by the contracts signed bythe Borrower with the providers of goods and works,and not by these Guidelines or the Loan Agreements.No party other than the parties to the Loan Agree-ment shall derive any rights therefrom or have anyclaim to loan proceeds. 展开更多
关键词 BANK Guidelines Procurement under ibrd Loans and IDA Credits IDA
下载PDF
百色水利枢纽利用世行贷款采购的设想和意见
2
作者 吕森全 《广西水利水电》 1997年第3期18-23,共6页
简述世界银行贷款项目的采购要求,分析影响百色水利枢纽采购工作的关键因素,并对优化采购提出了看法和建议。
关键词 水利枢纽 世界银行 贷款项目 采购
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部