Globally, traditional power systems are rapidly transforming towards the adoption of smart grid platforms. Substations which are at the center of the electric power transformation from the power plant are changing to ...Globally, traditional power systems are rapidly transforming towards the adoption of smart grid platforms. Substations which are at the center of the electric power transformation from the power plant are changing to IEC 61850 based digital substations. Therefore, within substation, there is a growing demand for the IEC 61850 based Intelligent Electronic Devices (IEDs). The operation of multiple manufacturers of IEDs in a single digital substation network increases the need for IEC 61850 communications specification conformance diagnosis to ensure interoperability for efficient data exchange between IEDs. The IEC 61850-10 presents test items for diagnosing communication specification conformance. There are many test tools available in the market today to test the compliance of the IEC 61850 communications specifications to the IED. In this paper, we propose a model-based diagnostic method for IED communication conformance testing. The proposed model-based software therefore uses the “drag and drop” technique to select the various IEC 61850 communication services (objects) required to design the test case in a user friendly Graphical User Interface (GUI). This makes the service conformance testing more flexible for test engineers and system integrators especially in situations that require test case modifications. Also, the proposed software tool makes it easy to understand the various IEC 61850 services using the friendly GUI.展开更多
In this paper, a conformance test platform is built for intelligent electronic devices (IEDs) from different manufacturers based on IEC 61850 communication protocol. A conformance test of time delay of message transmi...In this paper, a conformance test platform is built for intelligent electronic devices (IEDs) from different manufacturers based on IEC 61850 communication protocol. A conformance test of time delay of message transmission between two IEDs, made by the same or different manufacturers, is performed. The conformance test platform, as well as the test results provide a helpful reference for IEC 61850 implementation.展开更多
The digital substation system consists of an Intelligent Electronic Device (IED) which requires information for the supervision, protection, and control, as well as a client operating system for substation operation. ...The digital substation system consists of an Intelligent Electronic Device (IED) which requires information for the supervision, protection, and control, as well as a client operating system for substation operation. IEC 61850 communication standard has been defined for information exchange between heterogeneous digital devices in such substations. Currently, the Korea Electric Power Corporation (KEPCO) digital substation system uses unbuffered reporting and Generic Object Oriented Substation Events (GOOSE) communication functions for monitoring, protection and control automation. However, it is expected that the Setting Group function will be needed to operate adaptive intelligent substation system. The Setting Group function is advantageous in that it is possible to change the setting of the IED in one unified way through the client operating system, rather than changing the correction value of an IED through different manufacturer-based engineering tools. In order to utilize the Setting Group function of the IED in real substation scenario, it is necessary to test both the communication function with the host operating device and the electric functional test to ensure that correction value is properly changed. In this paper, we introduce the IEC 61850 Setting Group function, and propose a method that can integrate communication function and electrical function test of an IED conforming to the setting group functionality. We also tested the Setting Group function of the actual IED device through the proposed integrated functional test method and analyzed the results. We were able to simplify the process of testing both the electrical and communication signals in digital substations.展开更多
Korea Electric Power Corporation in charge of the power IT project "Development of Prototype for Advanced Substation Automation System based on the Digital Control Technology", is performing the verification of perf...Korea Electric Power Corporation in charge of the power IT project "Development of Prototype for Advanced Substation Automation System based on the Digital Control Technology", is performing the verification of performance of the substation automation system based on IEC 61850. In order to verify a transformer protective lED that might be operating in substation automation system, the new standardized document and procedures are required in the aspect of the utility like KEPCO. But there is nothing to describe systematically how to verify IEC 6 1850 based lED in the system environment except an individual IED testing way. This paper will present the substation automation system based ways and procedures to verify the protective function of the IED using UML (Unified Modeling Language).展开更多
文摘Globally, traditional power systems are rapidly transforming towards the adoption of smart grid platforms. Substations which are at the center of the electric power transformation from the power plant are changing to IEC 61850 based digital substations. Therefore, within substation, there is a growing demand for the IEC 61850 based Intelligent Electronic Devices (IEDs). The operation of multiple manufacturers of IEDs in a single digital substation network increases the need for IEC 61850 communications specification conformance diagnosis to ensure interoperability for efficient data exchange between IEDs. The IEC 61850-10 presents test items for diagnosing communication specification conformance. There are many test tools available in the market today to test the compliance of the IEC 61850 communications specifications to the IED. In this paper, we propose a model-based diagnostic method for IED communication conformance testing. The proposed model-based software therefore uses the “drag and drop” technique to select the various IEC 61850 communication services (objects) required to design the test case in a user friendly Graphical User Interface (GUI). This makes the service conformance testing more flexible for test engineers and system integrators especially in situations that require test case modifications. Also, the proposed software tool makes it easy to understand the various IEC 61850 services using the friendly GUI.
文摘In this paper, a conformance test platform is built for intelligent electronic devices (IEDs) from different manufacturers based on IEC 61850 communication protocol. A conformance test of time delay of message transmission between two IEDs, made by the same or different manufacturers, is performed. The conformance test platform, as well as the test results provide a helpful reference for IEC 61850 implementation.
文摘The digital substation system consists of an Intelligent Electronic Device (IED) which requires information for the supervision, protection, and control, as well as a client operating system for substation operation. IEC 61850 communication standard has been defined for information exchange between heterogeneous digital devices in such substations. Currently, the Korea Electric Power Corporation (KEPCO) digital substation system uses unbuffered reporting and Generic Object Oriented Substation Events (GOOSE) communication functions for monitoring, protection and control automation. However, it is expected that the Setting Group function will be needed to operate adaptive intelligent substation system. The Setting Group function is advantageous in that it is possible to change the setting of the IED in one unified way through the client operating system, rather than changing the correction value of an IED through different manufacturer-based engineering tools. In order to utilize the Setting Group function of the IED in real substation scenario, it is necessary to test both the communication function with the host operating device and the electric functional test to ensure that correction value is properly changed. In this paper, we introduce the IEC 61850 Setting Group function, and propose a method that can integrate communication function and electrical function test of an IED conforming to the setting group functionality. We also tested the Setting Group function of the actual IED device through the proposed integrated functional test method and analyzed the results. We were able to simplify the process of testing both the electrical and communication signals in digital substations.
文摘Korea Electric Power Corporation in charge of the power IT project "Development of Prototype for Advanced Substation Automation System based on the Digital Control Technology", is performing the verification of performance of the substation automation system based on IEC 61850. In order to verify a transformer protective lED that might be operating in substation automation system, the new standardized document and procedures are required in the aspect of the utility like KEPCO. But there is nothing to describe systematically how to verify IEC 6 1850 based lED in the system environment except an individual IED testing way. This paper will present the substation automation system based ways and procedures to verify the protective function of the IED using UML (Unified Modeling Language).