In a hard-rock mine,blasting is an important rock-breakage process that impacts energy consumption both in downstream comminution processes and mine productivity.Optimizing the blast fragmentation to improve rock-brea...In a hard-rock mine,blasting is an important rock-breakage process that impacts energy consumption both in downstream comminution processes and mine productivity.Optimizing the blast fragmentation to improve rock-breakage efficiencies during crushing and grinding is key to mine-to-mill(MTM)optimization.This study explores the use of monitoring while drilling(MWD)data to achieve this goal.Representative penetration rates(PRs)were extracted from blastholes to estimate intact rock properties and predict the breakage efficiencies that directly affect comminution energy consumption.Two intact rock properties,tensile strength(TS)and Bond work index(BWI),were correlated with the PR data to predict these efficiencies in crushing and grinding,respectively.Because of the complexity of the raw MWD data and effects of various disturbances,the MWD data was preprocessed and normalized to achieve a representative PR value at each blasthole.This preprocessing entailed defining valid PR ranges from the MWD data that could eliminate the noise related to discontinuity features in the rock mass structure as well as errors in operator behaviors.The PR data was also normalized using the adjusted penetration rate(APR)to minimize the effects of mechanical factors such as drill feed force,torque,and rotational speed.To correlate the representative APR value with intact rock properties,TS and BWI,various laboratory experiments were conducted:drilling tests using a high-precision coring machine,Brazilian disc tests,and Bond grindability tests.Based on the results of these experiments,models were developed to predict rock-breakage efficiencies during crushing and grinding based on APR.The result of this study can be used to obtain blast energy designs that consider comminution energy consumption and efficiency in the downstream rock-breakage processes.展开更多
In recent years, a new kind of drilling fluid system with unique structure micro-foam has been developed. Compared with other drilling fluid systems, it possesses many advantages. And it has been successfully applied ...In recent years, a new kind of drilling fluid system with unique structure micro-foam has been developed. Compared with other drilling fluid systems, it possesses many advantages. And it has been successfully applied in hundreds of wells to drill depleted reservoirs in the world wide. The geological structure is very complex in Haita area, it is difficult to achieve the requirement of increasing drilling rate by conventional drilling methods, even can’t make footage. The micro-foam drilling fluid can apply to Haita area, and solve the drilling problems commendably, which is comprehended by studying the structure and plugging, prevent caving, speed mechanism of the micro-foam drilling fluid. Field practice indicates that micro-foam drilling fluid technology can resolve the drilling problem effectively in Haita basin. It has the extremely vital significance to improve drilling speed, discover and protect reservoir stratum, decrease the risk of circulation loss and save the drilling cost.展开更多
文摘In a hard-rock mine,blasting is an important rock-breakage process that impacts energy consumption both in downstream comminution processes and mine productivity.Optimizing the blast fragmentation to improve rock-breakage efficiencies during crushing and grinding is key to mine-to-mill(MTM)optimization.This study explores the use of monitoring while drilling(MWD)data to achieve this goal.Representative penetration rates(PRs)were extracted from blastholes to estimate intact rock properties and predict the breakage efficiencies that directly affect comminution energy consumption.Two intact rock properties,tensile strength(TS)and Bond work index(BWI),were correlated with the PR data to predict these efficiencies in crushing and grinding,respectively.Because of the complexity of the raw MWD data and effects of various disturbances,the MWD data was preprocessed and normalized to achieve a representative PR value at each blasthole.This preprocessing entailed defining valid PR ranges from the MWD data that could eliminate the noise related to discontinuity features in the rock mass structure as well as errors in operator behaviors.The PR data was also normalized using the adjusted penetration rate(APR)to minimize the effects of mechanical factors such as drill feed force,torque,and rotational speed.To correlate the representative APR value with intact rock properties,TS and BWI,various laboratory experiments were conducted:drilling tests using a high-precision coring machine,Brazilian disc tests,and Bond grindability tests.Based on the results of these experiments,models were developed to predict rock-breakage efficiencies during crushing and grinding based on APR.The result of this study can be used to obtain blast energy designs that consider comminution energy consumption and efficiency in the downstream rock-breakage processes.
文摘In recent years, a new kind of drilling fluid system with unique structure micro-foam has been developed. Compared with other drilling fluid systems, it possesses many advantages. And it has been successfully applied in hundreds of wells to drill depleted reservoirs in the world wide. The geological structure is very complex in Haita area, it is difficult to achieve the requirement of increasing drilling rate by conventional drilling methods, even can’t make footage. The micro-foam drilling fluid can apply to Haita area, and solve the drilling problems commendably, which is comprehended by studying the structure and plugging, prevent caving, speed mechanism of the micro-foam drilling fluid. Field practice indicates that micro-foam drilling fluid technology can resolve the drilling problem effectively in Haita basin. It has the extremely vital significance to improve drilling speed, discover and protect reservoir stratum, decrease the risk of circulation loss and save the drilling cost.