Effective application of digital integrated management and maintenance systems is essential for successful operation and maintenance management of bridge projects.This article analyzes the application strategy of such...Effective application of digital integrated management and maintenance systems is essential for successful operation and maintenance management of bridge projects.This article analyzes the application strategy of such systems.It provides an overview of comprehensive digital management and maintenance of bridges,an analysis of the basic components of the integrated management and maintenance system,and its application strategies.This study aims to offer guidance for the application of the system and to improve the quality of modern bridge engineering management and maintenance work.展开更多
The questions of what kind of individuals university education should cultivate,how to cultivate them,and for whom they are being trained are pressing issues that require immediate solutions.Implementing ideological a...The questions of what kind of individuals university education should cultivate,how to cultivate them,and for whom they are being trained are pressing issues that require immediate solutions.Implementing ideological and political education is a fundamental way to address these challenges.Integrating political education into professional courses is just as important as imparting knowledge,fostering interest,transmitting values,and shaping students’character and spirit.The excavation of ideological and political elements in bridge engineering courses should comprehensively consider the dependent subject of ideological and political elements,the source of cases,the depth of excavation,the trade-offs between courses,the commonality and multifaceted nature of ideological and political elements,as well as the two ways of ideological and political elements integration.Ideological and political elements should be integrated into all stages of classroom lectures,course assignments,final examinations,course design,discipline competitions,school-enterprise cooperation,etc.,so as to achieve the effect of educating people in the whole process.展开更多
A novel topology of Integrated Boost-SEPIC (IBS) AC-DC converter using common part sharing method (CPSM) has been proposed in this paper. Conventional boost converters with bridge rectifier configuration are inefficie...A novel topology of Integrated Boost-SEPIC (IBS) AC-DC converter using common part sharing method (CPSM) has been proposed in this paper. Conventional boost converters with bridge rectifier configuration are inefficient due to limited voltage step-up ratio which may not be applicable for high step-up applications as in the case of micro generators. The proposed IBS topology is based on the common part sharing method capable of operating both for positive and negative half cycle of the input signal. Result and simulation were conducted using PSIM environment. The proposed AC-DC IBS topology eliminates the requirement of bridge rectifier achieving high efficiency (about 99%), improved power factor (0.75, leading) and lower THD (about 38.8%) which is within IEEE standard.展开更多
MIBS算法是由Izadi等人在CANS 2009上提出的一个轻量级分组密码算法,整体采用Feistel结构,轮函数使用SP结构,分组长度为64 b,包含MIBS-64和MIBS-80这2个版本,适用于资源受限的环境,例如RFID(radio frequency identification)标签.研究M...MIBS算法是由Izadi等人在CANS 2009上提出的一个轻量级分组密码算法,整体采用Feistel结构,轮函数使用SP结构,分组长度为64 b,包含MIBS-64和MIBS-80这2个版本,适用于资源受限的环境,例如RFID(radio frequency identification)标签.研究MIBS算法针对积分攻击的安全性.首先,针对该算法的密钥编排算法,利用密钥搭桥技术,分别得到了MIBS-64和MIBS-80的轮密钥的相关性质.其次,利用基于MILP(mixed integer linear programming)的比特可分性的自动化建模搜索方法,构造了MIBS的8轮和9轮积分区分器.然后,基于8轮积分区分器,给出了12轮MIBS-64的密钥恢复攻击,数据复杂度为2^(60),时间复杂度为2^(63.42);最后,基于9轮积分区分器,给出了14轮MIBS-64的密钥恢复攻击,数据复杂度为2^(63),时间复杂度为2^(66).这是目前对MIBS-64和MIBS-80轮数最长的积分攻击.展开更多
The thermally induced cyclic loading on integral bridge abutments causes soil deformation and lateral stress ratcheting behind the abutment wall due to the expansion and contraction of the bridge deck.The forward and ...The thermally induced cyclic loading on integral bridge abutments causes soil deformation and lateral stress ratcheting behind the abutment wall due to the expansion and contraction of the bridge deck.The forward and backward movements of the abutment in response to the expansion/contraction of the bridge deck lead to the formation of settlement trough and surface heaving,frequently creating a bump at the bridge approach and increasing the lateral earth pressure behind the abutment.Measures to reduce the bump at the bridge approach,including several treatment methods,such as compaction of selected backfill materials,grout injection,installation of approach slab,and using a layer of compressible inclusion material behind the abutment were proposed.However,these guidelines still lack sufficient design details and there are limited experimental findings to validate design assumptions.In this paper,the use of engineered compressible materials to alleviate the lateral earth pressure ratcheting and settlement at the bridge approach is investigated.The comparative study is presented for the soil-inclusion,material-structure and soil-structure interactions for an integral bridge under three different backfill conditions,i.e.(a)sand,(b)sand and EPS geofoam,and(c)sand and Infinergy®.The study was conducted in a special large-scale test chamber with a semi-scale abutment to gain better insights into the soil-structure interaction(SSI).The kinematics and rearrangement of the soil during the cyclic loading have been investigated to identify the mitigating effects of compressible inclusions.The comparative study indicates that both compressible inclusions perform comparatively well,however,Infinergy®is a better alternative than the medium-density EPS geofoam,as it works more effectively to reduce the backfill settlement and heaving as well as soil ratcheting effects under cyclic translational movement.展开更多
文摘Effective application of digital integrated management and maintenance systems is essential for successful operation and maintenance management of bridge projects.This article analyzes the application strategy of such systems.It provides an overview of comprehensive digital management and maintenance of bridges,an analysis of the basic components of the integrated management and maintenance system,and its application strategies.This study aims to offer guidance for the application of the system and to improve the quality of modern bridge engineering management and maintenance work.
基金Chongqing Institute of Engineering Ideological and Political Teaching Demonstration Course Construction Project(KC20230010)。
文摘The questions of what kind of individuals university education should cultivate,how to cultivate them,and for whom they are being trained are pressing issues that require immediate solutions.Implementing ideological and political education is a fundamental way to address these challenges.Integrating political education into professional courses is just as important as imparting knowledge,fostering interest,transmitting values,and shaping students’character and spirit.The excavation of ideological and political elements in bridge engineering courses should comprehensively consider the dependent subject of ideological and political elements,the source of cases,the depth of excavation,the trade-offs between courses,the commonality and multifaceted nature of ideological and political elements,as well as the two ways of ideological and political elements integration.Ideological and political elements should be integrated into all stages of classroom lectures,course assignments,final examinations,course design,discipline competitions,school-enterprise cooperation,etc.,so as to achieve the effect of educating people in the whole process.
文摘A novel topology of Integrated Boost-SEPIC (IBS) AC-DC converter using common part sharing method (CPSM) has been proposed in this paper. Conventional boost converters with bridge rectifier configuration are inefficient due to limited voltage step-up ratio which may not be applicable for high step-up applications as in the case of micro generators. The proposed IBS topology is based on the common part sharing method capable of operating both for positive and negative half cycle of the input signal. Result and simulation were conducted using PSIM environment. The proposed AC-DC IBS topology eliminates the requirement of bridge rectifier achieving high efficiency (about 99%), improved power factor (0.75, leading) and lower THD (about 38.8%) which is within IEEE standard.
文摘MIBS算法是由Izadi等人在CANS 2009上提出的一个轻量级分组密码算法,整体采用Feistel结构,轮函数使用SP结构,分组长度为64 b,包含MIBS-64和MIBS-80这2个版本,适用于资源受限的环境,例如RFID(radio frequency identification)标签.研究MIBS算法针对积分攻击的安全性.首先,针对该算法的密钥编排算法,利用密钥搭桥技术,分别得到了MIBS-64和MIBS-80的轮密钥的相关性质.其次,利用基于MILP(mixed integer linear programming)的比特可分性的自动化建模搜索方法,构造了MIBS的8轮和9轮积分区分器.然后,基于8轮积分区分器,给出了12轮MIBS-64的密钥恢复攻击,数据复杂度为2^(60),时间复杂度为2^(63.42);最后,基于9轮积分区分器,给出了14轮MIBS-64的密钥恢复攻击,数据复杂度为2^(63),时间复杂度为2^(66).这是目前对MIBS-64和MIBS-80轮数最长的积分攻击.
基金The authors gratefully acknowledge and thank BASF for providing the Infinergymaterial used in this research.The continuous technical support provided by Mr.Van Doan and Advanced Materials Characterisation Facility(AMCF)at Western Sydney University(WSU)are also gratefully acknowledged.This research is supported by the Graduate student research fund of WSU.This research did not receive any specific grant from funding agencies in the public,commercial,or not-for-profit sectors.
文摘The thermally induced cyclic loading on integral bridge abutments causes soil deformation and lateral stress ratcheting behind the abutment wall due to the expansion and contraction of the bridge deck.The forward and backward movements of the abutment in response to the expansion/contraction of the bridge deck lead to the formation of settlement trough and surface heaving,frequently creating a bump at the bridge approach and increasing the lateral earth pressure behind the abutment.Measures to reduce the bump at the bridge approach,including several treatment methods,such as compaction of selected backfill materials,grout injection,installation of approach slab,and using a layer of compressible inclusion material behind the abutment were proposed.However,these guidelines still lack sufficient design details and there are limited experimental findings to validate design assumptions.In this paper,the use of engineered compressible materials to alleviate the lateral earth pressure ratcheting and settlement at the bridge approach is investigated.The comparative study is presented for the soil-inclusion,material-structure and soil-structure interactions for an integral bridge under three different backfill conditions,i.e.(a)sand,(b)sand and EPS geofoam,and(c)sand and Infinergy®.The study was conducted in a special large-scale test chamber with a semi-scale abutment to gain better insights into the soil-structure interaction(SSI).The kinematics and rearrangement of the soil during the cyclic loading have been investigated to identify the mitigating effects of compressible inclusions.The comparative study indicates that both compressible inclusions perform comparatively well,however,Infinergy®is a better alternative than the medium-density EPS geofoam,as it works more effectively to reduce the backfill settlement and heaving as well as soil ratcheting effects under cyclic translational movement.