[Objective]The activities of urease and phosphatase in integrated vertical flow constructed wetland and purification effect of black and malodorous river were studied.[Method]Honeycomb stone and soft filler were used ...[Objective]The activities of urease and phosphatase in integrated vertical flow constructed wetland and purification effect of black and malodorous river were studied.[Method]Honeycomb stone and soft filler were used as matrix,the biological grid integrated vertical flow constructed wetland system was built to strengthen treatment for black and malodorous river,and the activities of urease and phosphatase of two fillers in different functional areas of constructed wetland were tested to study the film formation property of two fillers in different functional areas.[Result]Both urease and phosphatase activities on biofilm of soft filler were significantly higher than on biofilm of honeycomb stone filler;indicating that choosing soft filler was more advantageous to the growth of biofilm;and urease activity had significant correlation with total nitrogen removal rate,while phosphatase activity had no significant correlation with total phosphorus removal rate.[Conclusion]This study provided evidences for utilizing the activities of urease and phosphatase to evaluate the purification effect of black and malodorous river and choose appropriate filler.展开更多
The effects of single Cd^(2+)and Pb^(2+),and combined Cd^(2+)and Pb^(2+)on dehydrogenase activity and polysaccharide content of the substrate biofilms in the integrated vertical-flow constructed wetland(IVCW)were stud...The effects of single Cd^(2+)and Pb^(2+),and combined Cd^(2+)and Pb^(2+)on dehydrogenase activity and polysaccharide content of the substrate biofilms in the integrated vertical-flow constructed wetland(IVCW)were studied.Dehydrogenase activities decreased linearly with the increasing concentrations of Cd^(2+)and Pb^(2+)at different times(6,24,72,and 120 h).The activities at both 6 and 24 h were significantly higher than that at 72 and 120 h in the case of single and combined treatments.The single Cd^(2+)and...展开更多
[Objective] The aim was to al eviate the constructed wetland clogging problems and to explore to the effects of hydraulic loading on wetland clogging. [Method] The experiment, through artificial soil columns, simulate...[Objective] The aim was to al eviate the constructed wetland clogging problems and to explore to the effects of hydraulic loading on wetland clogging. [Method] The experiment, through artificial soil columns, simulated vertical flow arti-ficial wetland, set four hydraulic load level at 50, 100, 150 and 200 cm/d, to identify the impact of hydraulic loading on wetland clogging and to explore the factors run-ning threshold. [Result] The results show that the different levels of hydraulic loading have greater impact; in the constructed wetland clogging process under high hy-draulic loading of 200 cm/d, the effective life was only six months, and the single factor can be speculated that the threshold of the hydraulic load should be at 100-150 cm/d; system can last for six months at low hydraulic loading and last for three months at medium hydraulic load. [Conclusion] The research provides references for wetland clogging experiments in future.展开更多
This research explores strategies to enhance the efficiency of secondary treatment in Vertical Flow Constructed Wetlands (CW) in Montenegro. The focus is on selecting appropriate primary treatment methods alongside th...This research explores strategies to enhance the efficiency of secondary treatment in Vertical Flow Constructed Wetlands (CW) in Montenegro. The focus is on selecting appropriate primary treatment methods alongside three distinct substrate types to improve wastewater treatment efficacy. The study examines the combination of two primary treatments with different substrate types in constructed wetlands (CW1, CW2, and CW3). The primary treatments include the existing wastewater treatment plant (WWTP) in Podgorica, involving coarse material removal through screens, inert material separation in aerated sand traps, and sediment and suspended matter removal in primary sedimentation tanks. The Extreme Separator (ExSep) was employed to evaluate its efficacy as a primary treatment method. The research demonstrates that the efficiency of CW can be significantly enhanced by selecting suitable primary treatment methods and substrates in Podgorica’s conditions. The most promising results were achieved by combining ExSep as a primary treatment with secondary treatment in CW-3. The removal efficiencies after CW3 for COD, BOD, and TSS exceeded 89%, 93%, and 91%, respectively. The outcomes underscore the significance of primary treatment in mitigating pollutant loads before discharge into the constructed wetlands, emphasizing potential areas for further optimization in wastewater treatment practices to enhance environmental sustainability and water quality management.展开更多
Vertical flow constructed wetlands is a typical ecological sanitation system for sewage treatment. The removal rates for COD, BOD 5, SS, TN, and TP were 60%, 80%, 74%, 49% and 79%, respectively, when septic tank effl...Vertical flow constructed wetlands is a typical ecological sanitation system for sewage treatment. The removal rates for COD, BOD 5, SS, TN, and TP were 60%, 80%, 74%, 49% and 79%, respectively, when septic tank effluent was treated by vertical flow filter. So the concentration of COD and BOD\-5 in the treated effluent could meet the quality standard for irrigation water. After that the treated effluent was used for hydroponic cultivation of water spinach and romaine lettuce, the removal efficiencies of the whole system for COD, BOD\-5, SS, TN and TP were 71 4%, 97 5%, 96 9%, 86 3%, and 87 4%, respectively. And it could meet the integrated wastewater discharge standard for secondary biological treatment plant. It was found that using treated effluent for hydroponic cultivation of vegetables could reduce the nitrate content in vegetables. The removal rates for total bacteria and coliform index by using vertical flow bed system with cinder substrate were 80%—90% and 85%—96%, respectively.展开更多
Livestock wastewater has been a major contributor to Chinese cultural eutrophication of surface waters. Constructed wetlands are under study as a best management practice to treat wastewater from dairy and swine opera...Livestock wastewater has been a major contributor to Chinese cultural eutrophication of surface waters. Constructed wetlands are under study as a best management practice to treat wastewater from dairy and swine operations, but the removal efficiency of pollutants is relatively low. Enhancing the treatment efficiency of livestock wastewater by effluent recirculation was investigated in a pilot-scale vertical-flow constructed wetland. The wetland system was composed of downflow and upflow stages, on which narrow-leaf Phragmites communis and common reed Phragraites Typhia are planted, respectively; each stage has a dimension of 4 m^2 (2 m × 2 m). Wastewater from facultative pond was fed into the system intermittently at a flow rate of 0.4 m^3/d. Recirculation rates of 0, 25%, 50%, 100% and 150% were adopted to evaluate the effect of the recirculation rate on pollutants removal. It shows that with effluent recirculation the average removal efficiencies of NH4-N, biological oxygen demand (BOD5) and suspended solids(SS) obviously increase to 61.7%, 81.3%, and 77.1%, respectively, in comparison with the values of 35.6%, 50.2%, and 49.3% without effluent recirculation. But the improvement of TP removal is slight, only from 42.3% to 48.9%. The variations of NH4-N, dissolved oxygen(DO) and oxidation-reduction potential(ORP) of inflow and outflow reveal that the adoption of effluent recirculation is benefi- cial to the formation of oxide environment in wetland. The exponential relationships with excellent correlation coefficients (R2 〉0.93) are found between the removal rates of NH4-N and BOD5 and the recirculation rates. With recirculation the pH value of the outflow decreases as the alkalinity is consumed by gradually enhanced nitrification process. When recirculation rate is kept constant 100%, the ambient temperature appears to affect NH4-N removal, but does not have significant influence on BOD5 removal.展开更多
With the increase of requirement for ecological function of environment,for quality of water environment,for sewage treatment cost and for comprehensive utilization of water resources,it was bound to introduce a new t...With the increase of requirement for ecological function of environment,for quality of water environment,for sewage treatment cost and for comprehensive utilization of water resources,it was bound to introduce a new type of ecological technology for pollution treatment which was low in cost,convenient in management and stable in operation.High-efficient vertical flow constructed wetland developed by Shenzhen Academy of Environmental Science was characterized by good landscape effect and high efficiency of pollutants removal,and it had been widely applied in sewa-ge treatment and recycling and in lake water circulation purification.A lot of practical results showed that this technology could achieve high removal efficiency of SS,COD,BOD5,NH4-N and TP and the removal rate had arrived at more than 80% when hydraulic loading was 0.33-0.50 m/d.Effluent quality had met the water quality standard for recycling of urban sewage.展开更多
This study evaluates the performance of shale from Ivory Coast used as substrate in vertical-flow constructed wetlands in removal of phosphates and nitrogen. The pilot-scale artificial wetland has been duplicated: fil...This study evaluates the performance of shale from Ivory Coast used as substrate in vertical-flow constructed wetlands in removal of phosphates and nitrogen. The pilot-scale artificial wetland has been duplicated: filter planted with Panicum maximun and unplanted. They were set up outdoors, and fed with a municipal wastewater. The wetlands have been fed with three batches per week (intermittent) over a period of 3 months. During the operation period, the hydraulic residence time (HRT) 52 h was used, while wastewater temperatures varied from about ~33°C. The removal performance of the constructed wetland units was very good, since it reached on an average 98%, 89.4%, 89.4%, 84%, 80%, 84.8% and 92% for TSS, DOC, BOD<sub>5</sub>, , TKN, TP and respectively. In addition, the vegetation did not demonstrate superior performance to unplanted controls. Therefore, this study focuses on the role of shale in the phosphorus and nitrogen removal from wastewater by constructed wetland.展开更多
Constructed wetlands (CWs) can achieve a high-quality wastewater treatment and a quality that meets the prescribed standard, defined by legislation on wastewater discharge. A limitation in the application of construct...Constructed wetlands (CWs) can achieve a high-quality wastewater treatment and a quality that meets the prescribed standard, defined by legislation on wastewater discharge. A limitation in the application of constructed wetlands (CWs) is the large area requirement, which limits their application. The subject matter of this research is to check the possibility of improving the efficiency of wastewater treatment and reducing the required area for constructed wetlands (CWs) by using an adequate substrate under the conditions found in Montenegro. In the described experiment, the constructed wetlands (CW) have a vertical flow system and play the role of a secondary wastewater treatment, receiving water from the existing WWTP in Podgorica after the primary treatment. These vertical flow systems reflect experience with the use of similar systems in Slovenija, Austria and Italy. Measurements to date show that the substrate plays an important role and that wastewater treatment efficacy varies significantly with respect to the type of substrate when used under the conditions available in Montenegro.展开更多
The integrated wetland systems were constructed by combining horizontal-flow and vertical-flow bed, and their purification efficiencies for septic tank effluent were detected when the hydraulic retention time (HRT) ...The integrated wetland systems were constructed by combining horizontal-flow and vertical-flow bed, and their purification efficiencies for septic tank effluent were detected when the hydraulic retention time (HRT) was 1 d, 3 d, 5 d under different seasons. The results showed that the removal efficiencies of the organics, phosphorus were steady in the hybrid systems, but the removal efficiency of total nitrogen was not steady due to high total nitrogen concentration in the septic tank effluent. The average removal rates of COD (chemical oxygen demand) were 89%, 87%, 83%, and 86% in summer, autumn, winter and spring, respectively, and it was up to 88%, 85%, 73%, and 74% for BOD5 (5 d biochemical oxygen demand) removal rate in four seasons. The average removal rates of TP (total phosphorous) could reach up to 97%, 98%, 95%, 98% in four seasons, but the removal rate of TN (total nitrogen) was very low. The results of this study also indicated that the capability of purification was the worst in winter. Cultivating with plants could improve the treated effluent quality fTom the hybrid systems. The results of the operation of the horizontal-flow and vertical-flow cells (hybrid systems) showed that the removal efficiencies of the organics, TP and TN in horizontal-flow and vertical-flow cells were improved significantly with the extension of HRT under the same season. The removal rate of 3 d HRT was obviously higher than that of 1 d HRT, and the removal rate of 5 d HRT was better than that of 3 d HRT, but the removal efficiency was not very obvious with the increment of HRT. Therefore, 3 d HRT might be recommended in the actual operation of the hybrid systems for economic and technical reasons.展开更多
The integrated vertical-flow constructed wetland(IVCW) was simulated with three suits of designed experiment columns planted with Kandelia candel.Units A,B and C were irrigated with sewage of different salinity(A...The integrated vertical-flow constructed wetland(IVCW) was simulated with three suits of designed experiment columns planted with Kandelia candel.Units A,B and C were irrigated with sewage of different salinity(A:10‰ B:20‰,C:30‰),respectively.The removal rates of dissolved organic carbon(DOC),NH3-N and NO3--N dropped 90.4%-48.6%,80.2%-40.3% and 84.8%-60.9%,respectively,when salinity increases from 10‰ to 30‰.The removal rate of TP increased 14%-31.2%,oppositely.A 20-day inflow salinity drastic change shock affective trial was done on units D and E.Unit D was used as a control and irrigated with saline sewage(20‰).Unit E was irrigated with sewage with low salinity(5‰) as a salinity drastic change shock on the third and fourth days.DOC,NH3-N and NO3--N removal efficiency of unit E showed a three-stage process of change,"rapidly decrease,increase beyond the normal standard,and then back to the normal standard".TP removal value was negative during the 2-day shock period.展开更多
Three lab-scale vertical-flow constructed wetlands (VFCWs), including the non-aerated (NA), intermittently aerated (IA) and continuously aerated (CA) ones, were operated at different hydraulic loading rates (...Three lab-scale vertical-flow constructed wetlands (VFCWs), including the non-aerated (NA), intermittently aerated (IA) and continuously aerated (CA) ones, were operated at different hydraulic loading rates (HLRs) to evaluate the effect of artificial aeration on the treatment efficiency of heavily polluted river water. Results indicated that artificial aeration increased the dissolved oxygen (DO) concentrations in IA and CA, which significantly favored the removal of organic matter and NH4+-N. The DO grads caused by intermittent aeration formed aerobic and anoxic regions in IA and thus promoted the removal of total nitrogen (TN). Although the removal efficiencies of CODEr, NH4+-N and TN in the three VFCWs all decreased with an increase in HLR, artificial aeration enhanced the reactor resistance to the fluctuation of pollutant loadings. The maximal removal efficiencies of CODEr, NH4+-N and total phosphorus (TP) (i.e., 81%, 87% and 37%, respectively) were observed in CA at 19 cm/day HLR, while the maximal TN removal (i.e., 57%) was achieved in IA. Although the improvement of artificial aeration on TP removal was limited, this study has demonstrated the feasibility of applying artificial aeration to VFCWs treating polluted river water, particularly at a high HLR.展开更多
Subtropical climatic conditions can contribute to the death of the aerial parts of constructed wetland plants in winter. This presents a barrier to the widespread application of constructed wetland and is an issue tha...Subtropical climatic conditions can contribute to the death of the aerial parts of constructed wetland plants in winter. This presents a barrier to the widespread application of constructed wetland and is an issue that urgently needs to be solved. Three contrasting experi- ments, the plant-intercropping model (A), the warm- seasonal plant model (B), and the non-plant model (C), were studied in terms of their efficiency in removing pollutants, and the change in root structure of plants in the plant-intercropping model within the vertical-flow con- structed wetlands. The results indicate that model A was able to solve the aforementioned problem. Overall, average removal rates of three pollutants (CODcr, total nitrogen (TN) and total phosphorous (TP)) using model A were significantly higher than those obtained using models B and C (P 〈 0.01). Moreover, no significant differences in removal rates of the three pollutants were detected between A and B during the higher temperature part of the year (P〉 0.05). Conversely, removal rates of the three pollutants were found to be significantly higher using model A than those observed using model B during the lower temperature part of the year (P 〈 0.01). Furthermore, the morphologies and internal structures of plant roots further demonstrate that numerous white roots, whose distribution in soil was generally shallow, extend further under model A. The roots of these aquatic plants have an aerenchyma structure composed of parenchyma cells, therefore, roots of the cold-seasonal plants with major growth advantages used in A were capable of creating a more favorable vertical-flow constructed wetlands media- microenvironment. In conclusion, the plant-intercropping model (A) is more suitable for use in the cold environment experienced by constructed wetland during winter.展开更多
Plants constitute a major element of constructed wetlands(CWs).In this study,a coupled system comprising an integrated vertical flow CW(IVCW) and a microbial fuel cell(MFC) for swine wastewater tre atment was develope...Plants constitute a major element of constructed wetlands(CWs).In this study,a coupled system comprising an integrated vertical flow CW(IVCW) and a microbial fuel cell(MFC) for swine wastewater tre atment was developed to research the effects of macrophytes commonly employed in CWs,Canna indica,Acorus calamus,and Ipomoea aquatica,on decontamination and electricity production in the system.Because of the different root types and amounts of oxygen released by the roots,the rates of chemical oxygen demand(COD) and ammonium nitrogen(NH4^+-N) removal from the swine wastewater differed as well.In the unplanted,Canna indica,Acorus calamus,and Ipomoea aquatica systems,the COD removal rates were 80.20%,88.07%,84.70%,and 82.20%,respectively,and the NH4+-N removal rates were 49.96%,75.02%,70.25%,and 68.47%,respectively.The decontamination capability of the Canna indica system was better than those of the other systems.The average output voltages were 520±42,715±20,660±27,and 752±26 mV for the unplanted,Canna indica,Acorus calamus,and Ipomoea aquatica systems,respectively,and the maximum power densities were 0.2230,0.4136,0.3614,and0.4964 W/m^3,respectively.Ipomoea aquatica had the largest effect on bioelectricity generation promotion.In addition,electrochemically active bacteria,Geobacter and Desulfuromonas,were detected in the anodic biofilm by high-throughput sequencing analysis,and Comamonas(Proteobacteria),which is widely found in MFCs,was also detected in the anodic biofilm.These results confirmed the important role of plants in IVCW-MFCs.展开更多
基金Supported by National Major Science and Technology Projects(2009ZX07317-006)National Major Science and Technology Projects(2009ZX07317-009)~~
文摘[Objective]The activities of urease and phosphatase in integrated vertical flow constructed wetland and purification effect of black and malodorous river were studied.[Method]Honeycomb stone and soft filler were used as matrix,the biological grid integrated vertical flow constructed wetland system was built to strengthen treatment for black and malodorous river,and the activities of urease and phosphatase of two fillers in different functional areas of constructed wetland were tested to study the film formation property of two fillers in different functional areas.[Result]Both urease and phosphatase activities on biofilm of soft filler were significantly higher than on biofilm of honeycomb stone filler;indicating that choosing soft filler was more advantageous to the growth of biofilm;and urease activity had significant correlation with total nitrogen removal rate,while phosphatase activity had no significant correlation with total phosphorus removal rate.[Conclusion]This study provided evidences for utilizing the activities of urease and phosphatase to evaluate the purification effect of black and malodorous river and choose appropriate filler.
文摘The effects of single Cd^(2+)and Pb^(2+),and combined Cd^(2+)and Pb^(2+)on dehydrogenase activity and polysaccharide content of the substrate biofilms in the integrated vertical-flow constructed wetland(IVCW)were studied.Dehydrogenase activities decreased linearly with the increasing concentrations of Cd^(2+)and Pb^(2+)at different times(6,24,72,and 120 h).The activities at both 6 and 24 h were significantly higher than that at 72 and 120 h in the case of single and combined treatments.The single Cd^(2+)and...
基金Supported by National Natural Science Foundation of China(41071214)~~
文摘[Objective] The aim was to al eviate the constructed wetland clogging problems and to explore to the effects of hydraulic loading on wetland clogging. [Method] The experiment, through artificial soil columns, simulated vertical flow arti-ficial wetland, set four hydraulic load level at 50, 100, 150 and 200 cm/d, to identify the impact of hydraulic loading on wetland clogging and to explore the factors run-ning threshold. [Result] The results show that the different levels of hydraulic loading have greater impact; in the constructed wetland clogging process under high hy-draulic loading of 200 cm/d, the effective life was only six months, and the single factor can be speculated that the threshold of the hydraulic load should be at 100-150 cm/d; system can last for six months at low hydraulic loading and last for three months at medium hydraulic load. [Conclusion] The research provides references for wetland clogging experiments in future.
文摘This research explores strategies to enhance the efficiency of secondary treatment in Vertical Flow Constructed Wetlands (CW) in Montenegro. The focus is on selecting appropriate primary treatment methods alongside three distinct substrate types to improve wastewater treatment efficacy. The study examines the combination of two primary treatments with different substrate types in constructed wetlands (CW1, CW2, and CW3). The primary treatments include the existing wastewater treatment plant (WWTP) in Podgorica, involving coarse material removal through screens, inert material separation in aerated sand traps, and sediment and suspended matter removal in primary sedimentation tanks. The Extreme Separator (ExSep) was employed to evaluate its efficacy as a primary treatment method. The research demonstrates that the efficiency of CW can be significantly enhanced by selecting suitable primary treatment methods and substrates in Podgorica’s conditions. The most promising results were achieved by combining ExSep as a primary treatment with secondary treatment in CW-3. The removal efficiencies after CW3 for COD, BOD, and TSS exceeded 89%, 93%, and 91%, respectively. The outcomes underscore the significance of primary treatment in mitigating pollutant loads before discharge into the constructed wetlands, emphasizing potential areas for further optimization in wastewater treatment practices to enhance environmental sustainability and water quality management.
文摘Vertical flow constructed wetlands is a typical ecological sanitation system for sewage treatment. The removal rates for COD, BOD 5, SS, TN, and TP were 60%, 80%, 74%, 49% and 79%, respectively, when septic tank effluent was treated by vertical flow filter. So the concentration of COD and BOD\-5 in the treated effluent could meet the quality standard for irrigation water. After that the treated effluent was used for hydroponic cultivation of water spinach and romaine lettuce, the removal efficiencies of the whole system for COD, BOD\-5, SS, TN and TP were 71 4%, 97 5%, 96 9%, 86 3%, and 87 4%, respectively. And it could meet the integrated wastewater discharge standard for secondary biological treatment plant. It was found that using treated effluent for hydroponic cultivation of vegetables could reduce the nitrate content in vegetables. The removal rates for total bacteria and coliform index by using vertical flow bed system with cinder substrate were 80%—90% and 85%—96%, respectively.
文摘Livestock wastewater has been a major contributor to Chinese cultural eutrophication of surface waters. Constructed wetlands are under study as a best management practice to treat wastewater from dairy and swine operations, but the removal efficiency of pollutants is relatively low. Enhancing the treatment efficiency of livestock wastewater by effluent recirculation was investigated in a pilot-scale vertical-flow constructed wetland. The wetland system was composed of downflow and upflow stages, on which narrow-leaf Phragmites communis and common reed Phragraites Typhia are planted, respectively; each stage has a dimension of 4 m^2 (2 m × 2 m). Wastewater from facultative pond was fed into the system intermittently at a flow rate of 0.4 m^3/d. Recirculation rates of 0, 25%, 50%, 100% and 150% were adopted to evaluate the effect of the recirculation rate on pollutants removal. It shows that with effluent recirculation the average removal efficiencies of NH4-N, biological oxygen demand (BOD5) and suspended solids(SS) obviously increase to 61.7%, 81.3%, and 77.1%, respectively, in comparison with the values of 35.6%, 50.2%, and 49.3% without effluent recirculation. But the improvement of TP removal is slight, only from 42.3% to 48.9%. The variations of NH4-N, dissolved oxygen(DO) and oxidation-reduction potential(ORP) of inflow and outflow reveal that the adoption of effluent recirculation is benefi- cial to the formation of oxide environment in wetland. The exponential relationships with excellent correlation coefficients (R2 〉0.93) are found between the removal rates of NH4-N and BOD5 and the recirculation rates. With recirculation the pH value of the outflow decreases as the alkalinity is consumed by gradually enhanced nitrification process. When recirculation rate is kept constant 100%, the ambient temperature appears to affect NH4-N removal, but does not have significant influence on BOD5 removal.
文摘With the increase of requirement for ecological function of environment,for quality of water environment,for sewage treatment cost and for comprehensive utilization of water resources,it was bound to introduce a new type of ecological technology for pollution treatment which was low in cost,convenient in management and stable in operation.High-efficient vertical flow constructed wetland developed by Shenzhen Academy of Environmental Science was characterized by good landscape effect and high efficiency of pollutants removal,and it had been widely applied in sewa-ge treatment and recycling and in lake water circulation purification.A lot of practical results showed that this technology could achieve high removal efficiency of SS,COD,BOD5,NH4-N and TP and the removal rate had arrived at more than 80% when hydraulic loading was 0.33-0.50 m/d.Effluent quality had met the water quality standard for recycling of urban sewage.
文摘This study evaluates the performance of shale from Ivory Coast used as substrate in vertical-flow constructed wetlands in removal of phosphates and nitrogen. The pilot-scale artificial wetland has been duplicated: filter planted with Panicum maximun and unplanted. They were set up outdoors, and fed with a municipal wastewater. The wetlands have been fed with three batches per week (intermittent) over a period of 3 months. During the operation period, the hydraulic residence time (HRT) 52 h was used, while wastewater temperatures varied from about ~33°C. The removal performance of the constructed wetland units was very good, since it reached on an average 98%, 89.4%, 89.4%, 84%, 80%, 84.8% and 92% for TSS, DOC, BOD<sub>5</sub>, , TKN, TP and respectively. In addition, the vegetation did not demonstrate superior performance to unplanted controls. Therefore, this study focuses on the role of shale in the phosphorus and nitrogen removal from wastewater by constructed wetland.
文摘Constructed wetlands (CWs) can achieve a high-quality wastewater treatment and a quality that meets the prescribed standard, defined by legislation on wastewater discharge. A limitation in the application of constructed wetlands (CWs) is the large area requirement, which limits their application. The subject matter of this research is to check the possibility of improving the efficiency of wastewater treatment and reducing the required area for constructed wetlands (CWs) by using an adequate substrate under the conditions found in Montenegro. In the described experiment, the constructed wetlands (CW) have a vertical flow system and play the role of a secondary wastewater treatment, receiving water from the existing WWTP in Podgorica after the primary treatment. These vertical flow systems reflect experience with the use of similar systems in Slovenija, Austria and Italy. Measurements to date show that the substrate plays an important role and that wastewater treatment efficacy varies significantly with respect to the type of substrate when used under the conditions available in Montenegro.
文摘The integrated wetland systems were constructed by combining horizontal-flow and vertical-flow bed, and their purification efficiencies for septic tank effluent were detected when the hydraulic retention time (HRT) was 1 d, 3 d, 5 d under different seasons. The results showed that the removal efficiencies of the organics, phosphorus were steady in the hybrid systems, but the removal efficiency of total nitrogen was not steady due to high total nitrogen concentration in the septic tank effluent. The average removal rates of COD (chemical oxygen demand) were 89%, 87%, 83%, and 86% in summer, autumn, winter and spring, respectively, and it was up to 88%, 85%, 73%, and 74% for BOD5 (5 d biochemical oxygen demand) removal rate in four seasons. The average removal rates of TP (total phosphorous) could reach up to 97%, 98%, 95%, 98% in four seasons, but the removal rate of TN (total nitrogen) was very low. The results of this study also indicated that the capability of purification was the worst in winter. Cultivating with plants could improve the treated effluent quality fTom the hybrid systems. The results of the operation of the horizontal-flow and vertical-flow cells (hybrid systems) showed that the removal efficiencies of the organics, TP and TN in horizontal-flow and vertical-flow cells were improved significantly with the extension of HRT under the same season. The removal rate of 3 d HRT was obviously higher than that of 1 d HRT, and the removal rate of 5 d HRT was better than that of 3 d HRT, but the removal efficiency was not very obvious with the increment of HRT. Therefore, 3 d HRT might be recommended in the actual operation of the hybrid systems for economic and technical reasons.
基金Supported by the National High Technology Research and Development Program of China (863 Program) (2009ZX07106-002-004)the National Natural Science Foundation of China (50808172,30870221)
文摘The integrated vertical-flow constructed wetland(IVCW) was simulated with three suits of designed experiment columns planted with Kandelia candel.Units A,B and C were irrigated with sewage of different salinity(A:10‰ B:20‰,C:30‰),respectively.The removal rates of dissolved organic carbon(DOC),NH3-N and NO3--N dropped 90.4%-48.6%,80.2%-40.3% and 84.8%-60.9%,respectively,when salinity increases from 10‰ to 30‰.The removal rate of TP increased 14%-31.2%,oppositely.A 20-day inflow salinity drastic change shock affective trial was done on units D and E.Unit D was used as a control and irrigated with saline sewage(20‰).Unit E was irrigated with sewage with low salinity(5‰) as a salinity drastic change shock on the third and fourth days.DOC,NH3-N and NO3--N removal efficiency of unit E showed a three-stage process of change,"rapidly decrease,increase beyond the normal standard,and then back to the normal standard".TP removal value was negative during the 2-day shock period.
基金support from the Ministry of Environmental Protection (No.2008ZX07101-006-08)the Ministry of Science and Technology of China (No. 2009BAC57B02)
文摘Three lab-scale vertical-flow constructed wetlands (VFCWs), including the non-aerated (NA), intermittently aerated (IA) and continuously aerated (CA) ones, were operated at different hydraulic loading rates (HLRs) to evaluate the effect of artificial aeration on the treatment efficiency of heavily polluted river water. Results indicated that artificial aeration increased the dissolved oxygen (DO) concentrations in IA and CA, which significantly favored the removal of organic matter and NH4+-N. The DO grads caused by intermittent aeration formed aerobic and anoxic regions in IA and thus promoted the removal of total nitrogen (TN). Although the removal efficiencies of CODEr, NH4+-N and TN in the three VFCWs all decreased with an increase in HLR, artificial aeration enhanced the reactor resistance to the fluctuation of pollutant loadings. The maximal removal efficiencies of CODEr, NH4+-N and total phosphorus (TP) (i.e., 81%, 87% and 37%, respectively) were observed in CA at 19 cm/day HLR, while the maximal TN removal (i.e., 57%) was achieved in IA. Although the improvement of artificial aeration on TP removal was limited, this study has demonstrated the feasibility of applying artificial aeration to VFCWs treating polluted river water, particularly at a high HLR.
文摘Subtropical climatic conditions can contribute to the death of the aerial parts of constructed wetland plants in winter. This presents a barrier to the widespread application of constructed wetland and is an issue that urgently needs to be solved. Three contrasting experi- ments, the plant-intercropping model (A), the warm- seasonal plant model (B), and the non-plant model (C), were studied in terms of their efficiency in removing pollutants, and the change in root structure of plants in the plant-intercropping model within the vertical-flow con- structed wetlands. The results indicate that model A was able to solve the aforementioned problem. Overall, average removal rates of three pollutants (CODcr, total nitrogen (TN) and total phosphorous (TP)) using model A were significantly higher than those obtained using models B and C (P 〈 0.01). Moreover, no significant differences in removal rates of the three pollutants were detected between A and B during the higher temperature part of the year (P〉 0.05). Conversely, removal rates of the three pollutants were found to be significantly higher using model A than those observed using model B during the lower temperature part of the year (P 〈 0.01). Furthermore, the morphologies and internal structures of plant roots further demonstrate that numerous white roots, whose distribution in soil was generally shallow, extend further under model A. The roots of these aquatic plants have an aerenchyma structure composed of parenchyma cells, therefore, roots of the cold-seasonal plants with major growth advantages used in A were capable of creating a more favorable vertical-flow constructed wetlands media- microenvironment. In conclusion, the plant-intercropping model (A) is more suitable for use in the cold environment experienced by constructed wetland during winter.
基金supported by the Science and Technology Project of the Education Department of Jiangxi Province of China (No.170688).
文摘Plants constitute a major element of constructed wetlands(CWs).In this study,a coupled system comprising an integrated vertical flow CW(IVCW) and a microbial fuel cell(MFC) for swine wastewater tre atment was developed to research the effects of macrophytes commonly employed in CWs,Canna indica,Acorus calamus,and Ipomoea aquatica,on decontamination and electricity production in the system.Because of the different root types and amounts of oxygen released by the roots,the rates of chemical oxygen demand(COD) and ammonium nitrogen(NH4^+-N) removal from the swine wastewater differed as well.In the unplanted,Canna indica,Acorus calamus,and Ipomoea aquatica systems,the COD removal rates were 80.20%,88.07%,84.70%,and 82.20%,respectively,and the NH4+-N removal rates were 49.96%,75.02%,70.25%,and 68.47%,respectively.The decontamination capability of the Canna indica system was better than those of the other systems.The average output voltages were 520±42,715±20,660±27,and 752±26 mV for the unplanted,Canna indica,Acorus calamus,and Ipomoea aquatica systems,respectively,and the maximum power densities were 0.2230,0.4136,0.3614,and0.4964 W/m^3,respectively.Ipomoea aquatica had the largest effect on bioelectricity generation promotion.In addition,electrochemically active bacteria,Geobacter and Desulfuromonas,were detected in the anodic biofilm by high-throughput sequencing analysis,and Comamonas(Proteobacteria),which is widely found in MFCs,was also detected in the anodic biofilm.These results confirmed the important role of plants in IVCW-MFCs.