The detrimental effect of imprint,which can cause misreading problem,has hindered the application of ferroelectric HfO_(2).In this work,we present results of a comprehensive reliability evaluation of Hf_(0.5)Zr_(0.5)O...The detrimental effect of imprint,which can cause misreading problem,has hindered the application of ferroelectric HfO_(2).In this work,we present results of a comprehensive reliability evaluation of Hf_(0.5)Zr_(0.5)O_(2)-based ferroelectric random access memory.The influence of imprint on the retention and endurance is demonstrated.Furthermore,a solution in circuity is pro-posed to effectively solve the misreading problem caused by imprint.展开更多
The escalating need for reliability analysis(RA)and reliability-based design optimization(RBDO)within engineering challenges has prompted the advancement of saddlepoint approximationmethods(SAM)tailored for such probl...The escalating need for reliability analysis(RA)and reliability-based design optimization(RBDO)within engineering challenges has prompted the advancement of saddlepoint approximationmethods(SAM)tailored for such problems.This article offers a detailed overview of the general SAM and summarizes the method characteristics first.Subsequently,recent enhancements in the SAM theoretical framework are assessed.Notably,the mean value first-order saddlepoint approximation(MVFOSA)bears resemblance to the conceptual framework of the mean value second-order saddlepoint approximation(MVSOSA);the latter serves as an auxiliary approach to the former.Their distinction is rooted in the varying expansion orders of the performance function as implemented through the Taylor method.Both the saddlepoint approximation and third-moment(SATM)and saddlepoint approximation and fourth-moment(SAFM)strategies model the cumulant generating function(CGF)by leveraging the initial random moments of the function.Although their optimal application domains diverge,each method consistently ensures superior relative precision,enhanced efficiency,and sustained stability.Every method elucidated is exemplified through pertinent RA or RBDO scenarios.By juxtaposing them against alternative strategies,the efficacy of these methods becomes evident.The outcomes proffered are subsequently employed as a foundation for contemplating prospective theoretical and practical research endeavors concerning SAMs.The main purpose and value of this article is to review the SAM and reliability-related issues,which can provide some reference and inspiration for future research scholars in this field.展开更多
The reliability of a network is an important indicator for maintaining communication and ensuring its stable operation. Therefore, the assessment of reliability in underlying interconnection networks has become an inc...The reliability of a network is an important indicator for maintaining communication and ensuring its stable operation. Therefore, the assessment of reliability in underlying interconnection networks has become an increasingly important research issue. However, at present, the reliability assessment of many interconnected networks is not yet accurate,which inevitably weakens their fault tolerance and diagnostic capabilities. To improve network reliability,researchers have proposed various methods and strategies for precise assessment. This paper introduces a novel family of interconnection networks called general matching composed networks(gMCNs), which is based on the common characteristics of network topology structure. After analyzing the topological properties of gMCNs, we establish a relationship between super connectivity and conditional diagnosability of gMCNs. Furthermore, we assess the reliability of g MCNs, and determine the conditional diagnosability of many interconnection networks.展开更多
This paper proposes a multi-material topology optimization method based on the hybrid reliability of the probability-ellipsoid model with stress constraint for the stochastic uncertainty and epistemic uncertainty of m...This paper proposes a multi-material topology optimization method based on the hybrid reliability of the probability-ellipsoid model with stress constraint for the stochastic uncertainty and epistemic uncertainty of mechanical loads in optimization design.The probabilistic model is combined with the ellipsoidal model to describe the uncertainty of mechanical loads.The topology optimization formula is combined with the ordered solid isotropic material with penalization(ordered-SIMP)multi-material interpolation model.The stresses of all elements are integrated into a global stress measurement that approximates the maximum stress using the normalized p-norm function.Furthermore,the sequential optimization and reliability assessment(SORA)is applied to transform the original uncertainty optimization problem into an equivalent deterministic topology optimization(DTO)problem.Stochastic response surface and sparse grid technique are combined with SORA to get accurate information on the most probable failure point(MPP).In each cycle,the equivalent topology optimization formula is updated according to the MPP information obtained in the previous cycle.The adjoint variable method is used for deriving the sensitivity of the stress constraint and the moving asymptote method(MMA)is used to update design variables.Finally,the validity and feasibility of the method are verified by the numerical example of L-shape beam design,T-shape structure design,steering knuckle,and 3D T-shaped beam.展开更多
A non-probabilistic reliability topology optimization method is proposed based on the aggregation function and matrix multiplication.The expression of the geometric stiffness matrix is derived,the finite element linea...A non-probabilistic reliability topology optimization method is proposed based on the aggregation function and matrix multiplication.The expression of the geometric stiffness matrix is derived,the finite element linear buckling analysis is conducted,and the sensitivity solution of the linear buckling factor is achieved.For a specific problem in linear buckling topology optimization,a Heaviside projection function based on the exponential smooth growth is developed to eliminate the gray cells.The aggregation function method is used to consider the high-order eigenvalues,so as to obtain continuous sensitivity information and refined structural design.With cyclic matrix programming,a fast topology optimization method that can be used to efficiently obtain the unit assembly and sensitivity solution is conducted.To maximize the buckling load,under the constraint of the given buckling load,two types of topological optimization columns are constructed.The variable density method is used to achieve the topology optimization solution along with the moving asymptote optimization algorithm.The vertex method and the matching point method are used to carry out an uncertainty propagation analysis,and the non-probability reliability topology optimization method considering buckling responses is developed based on the transformation of non-probability reliability indices based on the characteristic distance.Finally,the differences in the structural topology optimization under different reliability degrees are illustrated by examples.展开更多
In time-variant reliability problems,there are a lot of uncertain variables from different sources.Therefore,it is important to consider these uncertainties in engineering.In addition,time-variant reliability problems...In time-variant reliability problems,there are a lot of uncertain variables from different sources.Therefore,it is important to consider these uncertainties in engineering.In addition,time-variant reliability problems typically involve a complexmultilevel nested optimization problem,which can result in an enormous amount of computation.To this end,this paper studies the time-variant reliability evaluation of structures with stochastic and bounded uncertainties using a mixed probability and convex set model.In this method,the stochastic process of a limit-state function with mixed uncertain parameters is first discretized and then converted into a timeindependent reliability problem.Further,to solve the double nested optimization problem in hybrid reliability calculation,an efficient iterative scheme is designed in standard uncertainty space to determine the most probable point(MPP).The limit state function is linearized at these points,and an innovative random variable is defined to solve the equivalent static reliability analysis model.The effectiveness of the proposed method is verified by two benchmark numerical examples and a practical engineering problem.展开更多
The unmanned aerial vehicle(UAV)swarm plays an increasingly important role in the modern battlefield,and the UAV swarm operational test is a vital means to validate the combat effectiveness of the UAV swarm.Due to the...The unmanned aerial vehicle(UAV)swarm plays an increasingly important role in the modern battlefield,and the UAV swarm operational test is a vital means to validate the combat effectiveness of the UAV swarm.Due to the high cost and long duration of operational tests,it is essential to plan the test in advance.To solve the problem of planning UAV swarm operational test,this study considers the multi-stage feature of a UAV swarm mission,composed of launch,flight and combat stages,and proposes a method to find test plans that can maximize mission reliability.Therefore,a multi-stage mission reliability model for a UAV swarm is proposed to ensure successful implementation of the mission.A multi-objective integer optimization method that considers both mission reliability and cost is then formulated to obtain the optimal test plans.This study first constructs a mission reliability model for the UAV swarm in the combat stage.Then,the launch stage and flight stage are integrated to develop a complete PMS(Phased Mission Systems)reliability model.Finally,the Binary Decision Diagrams(BDD)and Multi Objective Quantum Particle Swarm Optimization(MOQPSO)methods are proposed to solve the model.The optimal plans considering both reliability and cost are obtained.The proposed model supports the planning of UAV swarm operational tests and represents a meaningful exploration of UAV swarm test planning.展开更多
Spatial variability of soil properties imposes a challenge for practical analysis and design in geotechnical engineering.The latter is particularly true for slope stability assessment,where the effects of uncertainty ...Spatial variability of soil properties imposes a challenge for practical analysis and design in geotechnical engineering.The latter is particularly true for slope stability assessment,where the effects of uncertainty are synthesized in the so-called probability of failure.This probability quantifies the reliability of a slope and its numerical calculation is usually quite involved from a numerical viewpoint.In view of this issue,this paper proposes an approach for failure probability assessment based on Latinized partially stratified sampling and maximum entropy distribution with fractional moments.The spatial variability of geotechnical properties is represented by means of random fields and the Karhunen-Loève expansion.Then,failure probabilities are estimated employing maximum entropy distribution with fractional moments.The application of the proposed approach is examined with two examples:a case study of an undrained slope and a case study of a slope with cross-correlated random fields of strength parameters under a drained slope.The results show that the proposed approach has excellent accuracy and high efficiency,and it can be applied straightforwardly to similar geotechnical engineering problems.展开更多
The traditional deterministic analysis for tunnel face stability neglects the uncertainties of geotechnical parameters,while the simplified reliability analysis which models the potential uncertainties by means of ran...The traditional deterministic analysis for tunnel face stability neglects the uncertainties of geotechnical parameters,while the simplified reliability analysis which models the potential uncertainties by means of random variables usually fails to account for soil spatial variability.To overcome these limitations,this study proposes an efficient framework for conducting reliability analysis and reliability-based design(RBD)of tunnel face stability in spatially variable soil strata.The three-dimensional(3D)rotational failure mechanism of the tunnel face is extended to account for the soil spatial variability,and a probabilistic framework is established by coupling the extended mechanism with the improved Hasofer-Lind-Rackwits-Fiessler recursive algorithm(iHLRF)as well as its inverse analysis formulation.The proposed framework allows for rapid and precise reliability analysis and RBD of tunnel face stability.To demonstrate the feasibility and efficacy of the proposed framework,an illustrative case of tunnelling in frictional soils is presented,where the soil's cohesion and friction angle are modelled as two anisotropic cross-correlated lognormal random fields.The results show that the proposed method can accurately estimate the failure probability(or reliability index)regarding the tunnel face stability and can efficiently determine the required supporting pressure for a target reliability index with soil spatial variability being taken into account.Furthermore,this study reveals the impact of various factors on the support pressure,including coefficient of variation,cross-correlation between cohesion and friction angle,as well as autocorrelation distance of spatially variable soil strata.The results also demonstrate the feasibility of using the forward and/or inverse first-order reliability method(FORM)in high-dimensional stochastic problems.It is hoped that this study may provide a practical and reliable framework for determining the stability of tunnels in complex soil strata.展开更多
Large-scale wireless sensor networks(WSNs)play a critical role in monitoring dangerous scenarios and responding to medical emergencies.However,the inherent instability and error-prone nature of wireless links present ...Large-scale wireless sensor networks(WSNs)play a critical role in monitoring dangerous scenarios and responding to medical emergencies.However,the inherent instability and error-prone nature of wireless links present significant challenges,necessitating efficient data collection and reliable transmission services.This paper addresses the limitations of existing data transmission and recovery protocols by proposing a systematic end-to-end design tailored for medical event-driven cluster-based large-scale WSNs.The primary goal is to enhance the reliability of data collection and transmission services,ensuring a comprehensive and practical approach.Our approach focuses on refining the hop-count-based routing scheme to achieve fairness in forwarding reliability.Additionally,it emphasizes reliable data collection within clusters and establishes robust data transmission over multiple hops.These systematic improvements are designed to optimize the overall performance of the WSN in real-world scenarios.Simulation results of the proposed protocol validate its exceptional performance compared to other prominent data transmission schemes.The evaluation spans varying sensor densities,wireless channel conditions,and packet transmission rates,showcasing the protocol’s superiority in ensuring reliable and efficient data transfer.Our systematic end-to-end design successfully addresses the challenges posed by the instability of wireless links in large-scaleWSNs.By prioritizing fairness,reliability,and efficiency,the proposed protocol demonstrates its efficacy in enhancing data collection and transmission services,thereby offering a valuable contribution to the field of medical event-drivenWSNs.展开更多
For high-reliability systems in military,aerospace,and railway fields,the challenges of reliability analysis lie in dealing with unclear failure mechanisms,complex fault relationships,lack of fault data,and uncertaint...For high-reliability systems in military,aerospace,and railway fields,the challenges of reliability analysis lie in dealing with unclear failure mechanisms,complex fault relationships,lack of fault data,and uncertainty of fault states.To overcome these problems,this paper proposes a reliability analysismethod based on T-S fault tree analysis(T-S FTA)and Hyper-ellipsoidal Bayesian network(HE-BN).The method describes the connection between the various systemfault events by T-S fuzzy gates and translates them into a Bayesian network(BN)model.Combining the advantages of T-S fault tree modeling with the advantages of Bayesian network computation,a reliability modeling method is proposed that can fully reflect the fault characteristics of complex systems.Experts describe the degree of failure of the event in the form of interval numbers.The knowledge and experience of experts are fused with the D-S evidence theory to obtain the initial failure probability interval of the BN root node.Then,the Hyper-ellipsoidal model(HM)constrains the initial failure probability interval and constructs a HE-BN for the system.A reliability analysismethod is proposed to solve the problem of insufficient failure data and uncertainty in the degree of failure.The failure probability of the system is further calculated and the key components that affect the system’s reliability are identified.The proposedmethod accounts for the uncertainty and incompleteness of the failure data in complex multi-state systems and establishes an easily computable reliability model that fully reflects the characteristics of complex faults and accurately identifies system weaknesses.The feasibility and accuracy of the method are further verified by conducting case studies.展开更多
Land acquisition is subject of many frauds worldwide. In Africa countries, land acquisition frauds are a real curse. Main reasons of the high land acquisition frauds in Africa are a lack of a reliable land acquisition...Land acquisition is subject of many frauds worldwide. In Africa countries, land acquisition frauds are a real curse. Main reasons of the high land acquisition frauds in Africa are a lack of a reliable land acquisition protocol implementation, no centralized information system that records land transactions and integrates all actors, lack of education about the acquisition protocol and lack of applied sanctions in case of frauds. As of sanctions, the issue is bound to the corruption plague in Africa. Authorities that are supposed to rule the laws are not well paid and are part of the corruption scheme. Most frequent frauds are multiple sales of the same land, falsified land title, false owner identification. In Africa, a land belongs generally to the first residents of the area. To claim ownership of a land, an owner should be recognized by the rural or city authorities. To achieve this recognition, he must obtain from those authorities an attribution letter. The author proposed a complete and reliable land acquisition protocol named ACLAP (Africa Countries Land Acquisition Protocol). The purpose of this paper is to explain the main components of the protocol implementation and show its efficiency when confronting fraud threats. In this paper, a Generic and Reliable Land Acquisition Protocol Implementation in Sub-Saharan Africa countries context is proposed. The platform keeps relevant land transaction information for administrators, managers, buyers, sellers, or for people consultation purpose. The application may be used in village, city, department, region, or country for land management decision making.展开更多
At present,the operation and maintenance of photovoltaic power generation systems mainly comprise regular maintenance,breakdown maintenance,and condition-based maintenance,which is very likely to lead to over-or under...At present,the operation and maintenance of photovoltaic power generation systems mainly comprise regular maintenance,breakdown maintenance,and condition-based maintenance,which is very likely to lead to over-or under-repair of equipment.Therefore,a preventive maintenance and replacement strategy for PV power generation systems based on reliability as a constraint is proposed.First,a hybrid failure function with a decreasing service age factor and an increasing failure rate factor is introduced to describe the deterioration of PV power generation equipment,and the equipment is replaced when its reliability drops to the replacement threshold in the last cycle.Then,based on the reliability as a constraint,the average maintenance cost and availability of the equipment are considered,and the non-periodic incomplete maintenance model of the PV power generation system is established to obtain the optimal number of repairs,each maintenance cycle and the replacement cycle of the PV power generation system components.Next,the inverter of a PV power plant is used as a research object.The model in this paper is compared and analyzed with the equal cycle maintenance model without considering reliability and the maintenance model without considering the equipment replacement threshold,Through model comparison,when the optimal maintenance strategy is(0.80,4),the average maintenance cost of this paper’s model are decreased by 20.3%and 5.54%and the availability is increased by 0.2395% and 0.0337%,respectively,compared with the equal-cycle maintenance model without considering the reliability constraint and the maintenance model without considering the equipment replacement threshold.Therefore,this maintenance model can ensure the high reliability of PV plant operation while increasing the equipment availability to improve the system economy.展开更多
The objective of this paper is to evaluate the reliability of a system in its different states (absence of failures, partial failure and total failure) and to propose actions to improve this reliability by an approach...The objective of this paper is to evaluate the reliability of a system in its different states (absence of failures, partial failure and total failure) and to propose actions to improve this reliability by an approach based on Monte Carlo simulation. It consists of a probabilistic evaluation based on Markov Chains. In order to achieve this goal, the functionalities of Markov Chains and Monte Carlo simulation steps are deployed. The application is made on a production system. .展开更多
Reliability-based design optimization (RBDO) is intrinsically a double-loop procedure since it involves an overall optimization and an iterative reliability assessment at each search point. Due to the double-loop pr...Reliability-based design optimization (RBDO) is intrinsically a double-loop procedure since it involves an overall optimization and an iterative reliability assessment at each search point. Due to the double-loop procedure, the computational expense of RBDO is normally very high. Current RBDO research focuses on problems with explicitly expressed performance functions and readily available gradients. This paper addresses a more challenging type of RBDO problem in which the performance functions are computation intensive. These computation intensive functions are often considered as a "black-box" and their gradients are not available or not reliable. On the basis of the reliable design space (RDS) concept proposed earlier by the authors, this paper proposes a Reliable Space Pursuing (RSP) approach, in which RDS is first identified and then gradually refined while optimization is performed. It fundamentally avoids the nested optimization and probabilistic assessment loop. Three well known RBDO problems from the literature are used for testing and demonstrating the effectiveness of the proposed RSP method.展开更多
AIM: To assess the inter-observer agreement and reliability as well as intra-observer repeatability for lacrimal scintigraphy(LS) reports with and without considering the irrigation test results.METHODS: A prospective...AIM: To assess the inter-observer agreement and reliability as well as intra-observer repeatability for lacrimal scintigraphy(LS) reports with and without considering the irrigation test results.METHODS: A prospective, observational, cross sectional study. Two masked clinicians(lacrimal surgeon and nuclear medicine specialist) independently reported 100 LS images(50 patients of >6 years of age with unilateral anophthalmic socket) in a university hospital. The lacrimal surgeon performed a diagnostic irrigation test and repeated the report of the same LS images 2 y after the first report(intra-observer agreement). A weighted Kappa analysis was performed to determine inter-observer agreement and reliability as well as intra-observer repeatability for the type(normal, partial and complete obstruction) and location(presac, preduct, and intraduct) of the obstruction. Subgroup analysis was also performed with consideration of irrigation test results. RESULTS: A significantly moderate agreement was found between lacrimal surgeon and nuclear medicine specialist for both the type(Kappa=0.55) and location(Kappa=0.48) of obstruction. Agreement values were higher for the type(Kappa=0.61 vs 0.41) and location(Kappa=0.56 vs 0.31) of obstruction in cases with normal than abnormal irrigation test. Strong and significant intraobserver(lacrimal surgeon) repeatability was found for both the type(Kappa=0.66) and location(Kappa=0.69) of obstruction. LS showed no to slight reliability based on irrigation test.CONCLUSION: A moderate agreement is found between lacrimal surgeon and nuclear medicine specialist regarding the interpretation of LS suggesting the importance ofconsensus groups among nuclear medicine specialists and lacrimal surgeons to create a common language for interpretation of LS. Intra-observer repeatability is strong for the lacrimal surgeon.展开更多
In this work,an improved active kriging method based on the AK-IS and truncated importance sampling(TIS)method is proposed to efficiently evaluate structural reliability.The novel method called AWK-TIS is inspired by ...In this work,an improved active kriging method based on the AK-IS and truncated importance sampling(TIS)method is proposed to efficiently evaluate structural reliability.The novel method called AWK-TIS is inspired by AK-IS and RBF-GA previously published in the literature.The innovation of the AWK-TIS is that TIS is adopted to lessen the sample pool size significantly,and the whale optimization algorithm(WOA)is employed to acquire the optimal Krigingmodel and themost probable point(MPP).To verify the performance of theAWK-TISmethod for structural reliability,four numerical cases which are utilized as benchmarks in literature and one real engineering problem about a jet van manipulate mechanism are tested.The results indicate the accuracy and efficiency of the proposed method.展开更多
To effectively predict the mechanical dispatch reliability(MDR),the artificial neural networks method combined with aircraft operation health status parameters is proposed,which introduces the real civil aircraft oper...To effectively predict the mechanical dispatch reliability(MDR),the artificial neural networks method combined with aircraft operation health status parameters is proposed,which introduces the real civil aircraft operation data for verification,to improve the modeling precision and computing efficiency.Grey relational analysis can identify the degree of correlation between aircraft system health status(such as the unscheduled maintenance event,unit report event,and services number)and dispatch release and screen out themost closely related systems to determine the set of input parameters required for the prediction model.The artificial neural network using radial basis function(RBF)as a kernel function,has the best applicability in the prediction of multidimensional,small sample problems.Health status parameters of related systems are used as the input to predict the changing trend ofMDR,under the artificial neural network modeling framework.The case study collects real operation data for a certain civil aircraft over the past five years to validate the performance of the model which meets the requirements of the application.The results show that the prediction quadratic error Ep of the model reaches 6.9×10−8.That is to say,in the existing operating environment,the prediction of the number of delay&cancel events per month can be less than once.The accuracy of RBF ANN,BP ANN and GA-BP ANN are compared further,and the results show that RBF ANN has better adaptability to such multidimensional small sample problems.The efforts of this paper provide a highly efficientmethod for theMDR prediction through aircraft system health state parameters,which is a promising model to enhance the prediction and controllability of the dispatch release,providing support for the construction of the civil aircraft operation system.展开更多
Introduction:Rotatory chair testing has been used to evaluate horizontal canal function.Frequently used tests include sinusoidal harmonic acceleration test(SHAT)and velocity step test(VST).Objectives:Assessment of age...Introduction:Rotatory chair testing has been used to evaluate horizontal canal function.Frequently used tests include sinusoidal harmonic acceleration test(SHAT)and velocity step test(VST).Objectives:Assessment of age effect on the SHAT and VST and assessment of test-retest reliability of the parameters of those two tests.Methods:A prospective study was performed on 100 subjects with no ear or vestibular complaints and normal vestibular evaluation.They were divided into two groups;Group A:below 50 years of age and Group B:50 years of age or above.SHAT was presented at frequencies 0.02,0.04,0.08,0.16,0.32,0.64 Hz with a peak velocity of 60°/s.VST was performed using a maximum velocity of 100°/s with acceleration and deceleration of 200°/s2.Thirty subjects were tested twice to assess reliability.Results:Study participants ranged in age from 20 to 67 years.Regarding group A,the mean age was30.92±7.31 and 55.36±4.61 for group B.No significant differences were found in SHAT parameters between the two groups.As well,there was no significant difference in VST per-rotatory time constant,however,post-rotatory time constant was significantly longer for Group B(P value<0.05).Intraclass correlation coefficient(ICC)values showed moderate to good reliability(ICC 0.5800.818)for SHAT parameters for the lower frequencies and indicated moderate reliability for VST time constant(ICC 0.5090.652).Conclusions:Age has no significant effect on the parameters of SHAT and VST.Test-retest reliability is generally good for both tests.展开更多
The reliability analysis of vertically integrated protection devices is crucial for designing International Electrotechnical Commission(IEC)61850-based substations.This paper presents the hardware architecture of a fo...The reliability analysis of vertically integrated protection devices is crucial for designing International Electrotechnical Commission(IEC)61850-based substations.This paper presents the hardware architecture of a four-inone vertically integrated device and the information transmission path of each function based on the functional information transmission chain of protection devices,measurement and control devices,merging units,and intelligent terminals.Additionally,a reliability analysis model of the protection device and its protection system is constructed using the fault tree analysis method while considering the characteristics of each module of the vertically integrated device.The stability probability of the protection system in each state is analyzed by combining the state-transfer equations of line and busbar protection with a Markov chain.Finally,the failure rate and availability of the protection device and its protection system are calculated under different ambient temperatures using a 110 kV intelligent substation as an example.The sensitivity of each device module is analyzed.展开更多
基金This research was supported by the National Key R&D Program of China(Grant No.2022YFB3606900)in part by the National Natural Science of China(Grant No.62004217).
文摘The detrimental effect of imprint,which can cause misreading problem,has hindered the application of ferroelectric HfO_(2).In this work,we present results of a comprehensive reliability evaluation of Hf_(0.5)Zr_(0.5)O_(2)-based ferroelectric random access memory.The influence of imprint on the retention and endurance is demonstrated.Furthermore,a solution in circuity is pro-posed to effectively solve the misreading problem caused by imprint.
基金funded by the National Natural Science Foundation of China under Grant No.52175130the Sichuan Science and Technology Program under Grants Nos.2022YFQ0087 and 2022JDJQ0024+1 种基金the Guangdong Basic and Applied Basic Research Foundation under Grant No.2022A1515240010the Students Go Abroad for Scientific Research and Internship Funding Program of University of Electronic Science and Technology of China.
文摘The escalating need for reliability analysis(RA)and reliability-based design optimization(RBDO)within engineering challenges has prompted the advancement of saddlepoint approximationmethods(SAM)tailored for such problems.This article offers a detailed overview of the general SAM and summarizes the method characteristics first.Subsequently,recent enhancements in the SAM theoretical framework are assessed.Notably,the mean value first-order saddlepoint approximation(MVFOSA)bears resemblance to the conceptual framework of the mean value second-order saddlepoint approximation(MVSOSA);the latter serves as an auxiliary approach to the former.Their distinction is rooted in the varying expansion orders of the performance function as implemented through the Taylor method.Both the saddlepoint approximation and third-moment(SATM)and saddlepoint approximation and fourth-moment(SAFM)strategies model the cumulant generating function(CGF)by leveraging the initial random moments of the function.Although their optimal application domains diverge,each method consistently ensures superior relative precision,enhanced efficiency,and sustained stability.Every method elucidated is exemplified through pertinent RA or RBDO scenarios.By juxtaposing them against alternative strategies,the efficacy of these methods becomes evident.The outcomes proffered are subsequently employed as a foundation for contemplating prospective theoretical and practical research endeavors concerning SAMs.The main purpose and value of this article is to review the SAM and reliability-related issues,which can provide some reference and inspiration for future research scholars in this field.
基金supported by National Natural Science Foundation of China (No.62362005)。
文摘The reliability of a network is an important indicator for maintaining communication and ensuring its stable operation. Therefore, the assessment of reliability in underlying interconnection networks has become an increasingly important research issue. However, at present, the reliability assessment of many interconnected networks is not yet accurate,which inevitably weakens their fault tolerance and diagnostic capabilities. To improve network reliability,researchers have proposed various methods and strategies for precise assessment. This paper introduces a novel family of interconnection networks called general matching composed networks(gMCNs), which is based on the common characteristics of network topology structure. After analyzing the topological properties of gMCNs, we establish a relationship between super connectivity and conditional diagnosability of gMCNs. Furthermore, we assess the reliability of g MCNs, and determine the conditional diagnosability of many interconnection networks.
基金supported by the National Natural Science Foundation of China(Grant 52175236).
文摘This paper proposes a multi-material topology optimization method based on the hybrid reliability of the probability-ellipsoid model with stress constraint for the stochastic uncertainty and epistemic uncertainty of mechanical loads in optimization design.The probabilistic model is combined with the ellipsoidal model to describe the uncertainty of mechanical loads.The topology optimization formula is combined with the ordered solid isotropic material with penalization(ordered-SIMP)multi-material interpolation model.The stresses of all elements are integrated into a global stress measurement that approximates the maximum stress using the normalized p-norm function.Furthermore,the sequential optimization and reliability assessment(SORA)is applied to transform the original uncertainty optimization problem into an equivalent deterministic topology optimization(DTO)problem.Stochastic response surface and sparse grid technique are combined with SORA to get accurate information on the most probable failure point(MPP).In each cycle,the equivalent topology optimization formula is updated according to the MPP information obtained in the previous cycle.The adjoint variable method is used for deriving the sensitivity of the stress constraint and the moving asymptote method(MMA)is used to update design variables.Finally,the validity and feasibility of the method are verified by the numerical example of L-shape beam design,T-shape structure design,steering knuckle,and 3D T-shaped beam.
基金Project supported by the National Natural Science Foundation of China (Nos.12072007,12072006,12132001,and 52192632)the Ningbo Natural Science Foundation of Zhejiang Province of China (No.202003N4018)the Defense Industrial Technology Development Program of China (Nos.JCKY2019205A006,JCKY2019203A003,and JCKY2021204A002)。
文摘A non-probabilistic reliability topology optimization method is proposed based on the aggregation function and matrix multiplication.The expression of the geometric stiffness matrix is derived,the finite element linear buckling analysis is conducted,and the sensitivity solution of the linear buckling factor is achieved.For a specific problem in linear buckling topology optimization,a Heaviside projection function based on the exponential smooth growth is developed to eliminate the gray cells.The aggregation function method is used to consider the high-order eigenvalues,so as to obtain continuous sensitivity information and refined structural design.With cyclic matrix programming,a fast topology optimization method that can be used to efficiently obtain the unit assembly and sensitivity solution is conducted.To maximize the buckling load,under the constraint of the given buckling load,two types of topological optimization columns are constructed.The variable density method is used to achieve the topology optimization solution along with the moving asymptote optimization algorithm.The vertex method and the matching point method are used to carry out an uncertainty propagation analysis,and the non-probability reliability topology optimization method considering buckling responses is developed based on the transformation of non-probability reliability indices based on the characteristic distance.Finally,the differences in the structural topology optimization under different reliability degrees are illustrated by examples.
基金partially supported by the National Natural Science Foundation of China(52375238)Science and Technology Program of Guangzhou(202201020213,202201020193,202201010399)GZHU-HKUST Joint Research Fund(YH202109).
文摘In time-variant reliability problems,there are a lot of uncertain variables from different sources.Therefore,it is important to consider these uncertainties in engineering.In addition,time-variant reliability problems typically involve a complexmultilevel nested optimization problem,which can result in an enormous amount of computation.To this end,this paper studies the time-variant reliability evaluation of structures with stochastic and bounded uncertainties using a mixed probability and convex set model.In this method,the stochastic process of a limit-state function with mixed uncertain parameters is first discretized and then converted into a timeindependent reliability problem.Further,to solve the double nested optimization problem in hybrid reliability calculation,an efficient iterative scheme is designed in standard uncertainty space to determine the most probable point(MPP).The limit state function is linearized at these points,and an innovative random variable is defined to solve the equivalent static reliability analysis model.The effectiveness of the proposed method is verified by two benchmark numerical examples and a practical engineering problem.
基金supported by the National Natural Science Foundation of China(with Granted Number 72271239,grant recipient P.J.),Research on the Design Method of Reliability Qualification Test for Complex Equipment Based on Multi-Source Information Fusion.https://www.nsfc.gov.cn/.
文摘The unmanned aerial vehicle(UAV)swarm plays an increasingly important role in the modern battlefield,and the UAV swarm operational test is a vital means to validate the combat effectiveness of the UAV swarm.Due to the high cost and long duration of operational tests,it is essential to plan the test in advance.To solve the problem of planning UAV swarm operational test,this study considers the multi-stage feature of a UAV swarm mission,composed of launch,flight and combat stages,and proposes a method to find test plans that can maximize mission reliability.Therefore,a multi-stage mission reliability model for a UAV swarm is proposed to ensure successful implementation of the mission.A multi-objective integer optimization method that considers both mission reliability and cost is then formulated to obtain the optimal test plans.This study first constructs a mission reliability model for the UAV swarm in the combat stage.Then,the launch stage and flight stage are integrated to develop a complete PMS(Phased Mission Systems)reliability model.Finally,the Binary Decision Diagrams(BDD)and Multi Objective Quantum Particle Swarm Optimization(MOQPSO)methods are proposed to solve the model.The optimal plans considering both reliability and cost are obtained.The proposed model supports the planning of UAV swarm operational tests and represents a meaningful exploration of UAV swarm test planning.
基金funding support from the China Scholarship Council(CSC).
文摘Spatial variability of soil properties imposes a challenge for practical analysis and design in geotechnical engineering.The latter is particularly true for slope stability assessment,where the effects of uncertainty are synthesized in the so-called probability of failure.This probability quantifies the reliability of a slope and its numerical calculation is usually quite involved from a numerical viewpoint.In view of this issue,this paper proposes an approach for failure probability assessment based on Latinized partially stratified sampling and maximum entropy distribution with fractional moments.The spatial variability of geotechnical properties is represented by means of random fields and the Karhunen-Loève expansion.Then,failure probabilities are estimated employing maximum entropy distribution with fractional moments.The application of the proposed approach is examined with two examples:a case study of an undrained slope and a case study of a slope with cross-correlated random fields of strength parameters under a drained slope.The results show that the proposed approach has excellent accuracy and high efficiency,and it can be applied straightforwardly to similar geotechnical engineering problems.
基金supported by the National Natural Science Foundation of China(Grant No.U22A20594)the Fundamental Research Funds for the Central Universities(Grant No.B230205028)the Postgraduate Research&Practice Innovation Program of Jiangsu Province(Grant No.KYCX23_0694).
文摘The traditional deterministic analysis for tunnel face stability neglects the uncertainties of geotechnical parameters,while the simplified reliability analysis which models the potential uncertainties by means of random variables usually fails to account for soil spatial variability.To overcome these limitations,this study proposes an efficient framework for conducting reliability analysis and reliability-based design(RBD)of tunnel face stability in spatially variable soil strata.The three-dimensional(3D)rotational failure mechanism of the tunnel face is extended to account for the soil spatial variability,and a probabilistic framework is established by coupling the extended mechanism with the improved Hasofer-Lind-Rackwits-Fiessler recursive algorithm(iHLRF)as well as its inverse analysis formulation.The proposed framework allows for rapid and precise reliability analysis and RBD of tunnel face stability.To demonstrate the feasibility and efficacy of the proposed framework,an illustrative case of tunnelling in frictional soils is presented,where the soil's cohesion and friction angle are modelled as two anisotropic cross-correlated lognormal random fields.The results show that the proposed method can accurately estimate the failure probability(or reliability index)regarding the tunnel face stability and can efficiently determine the required supporting pressure for a target reliability index with soil spatial variability being taken into account.Furthermore,this study reveals the impact of various factors on the support pressure,including coefficient of variation,cross-correlation between cohesion and friction angle,as well as autocorrelation distance of spatially variable soil strata.The results also demonstrate the feasibility of using the forward and/or inverse first-order reliability method(FORM)in high-dimensional stochastic problems.It is hoped that this study may provide a practical and reliable framework for determining the stability of tunnels in complex soil strata.
文摘Large-scale wireless sensor networks(WSNs)play a critical role in monitoring dangerous scenarios and responding to medical emergencies.However,the inherent instability and error-prone nature of wireless links present significant challenges,necessitating efficient data collection and reliable transmission services.This paper addresses the limitations of existing data transmission and recovery protocols by proposing a systematic end-to-end design tailored for medical event-driven cluster-based large-scale WSNs.The primary goal is to enhance the reliability of data collection and transmission services,ensuring a comprehensive and practical approach.Our approach focuses on refining the hop-count-based routing scheme to achieve fairness in forwarding reliability.Additionally,it emphasizes reliable data collection within clusters and establishes robust data transmission over multiple hops.These systematic improvements are designed to optimize the overall performance of the WSN in real-world scenarios.Simulation results of the proposed protocol validate its exceptional performance compared to other prominent data transmission schemes.The evaluation spans varying sensor densities,wireless channel conditions,and packet transmission rates,showcasing the protocol’s superiority in ensuring reliable and efficient data transfer.Our systematic end-to-end design successfully addresses the challenges posed by the instability of wireless links in large-scaleWSNs.By prioritizing fairness,reliability,and efficiency,the proposed protocol demonstrates its efficacy in enhancing data collection and transmission services,thereby offering a valuable contribution to the field of medical event-drivenWSNs.
基金the National Natural Science Foundation of China(51875073).
文摘For high-reliability systems in military,aerospace,and railway fields,the challenges of reliability analysis lie in dealing with unclear failure mechanisms,complex fault relationships,lack of fault data,and uncertainty of fault states.To overcome these problems,this paper proposes a reliability analysismethod based on T-S fault tree analysis(T-S FTA)and Hyper-ellipsoidal Bayesian network(HE-BN).The method describes the connection between the various systemfault events by T-S fuzzy gates and translates them into a Bayesian network(BN)model.Combining the advantages of T-S fault tree modeling with the advantages of Bayesian network computation,a reliability modeling method is proposed that can fully reflect the fault characteristics of complex systems.Experts describe the degree of failure of the event in the form of interval numbers.The knowledge and experience of experts are fused with the D-S evidence theory to obtain the initial failure probability interval of the BN root node.Then,the Hyper-ellipsoidal model(HM)constrains the initial failure probability interval and constructs a HE-BN for the system.A reliability analysismethod is proposed to solve the problem of insufficient failure data and uncertainty in the degree of failure.The failure probability of the system is further calculated and the key components that affect the system’s reliability are identified.The proposedmethod accounts for the uncertainty and incompleteness of the failure data in complex multi-state systems and establishes an easily computable reliability model that fully reflects the characteristics of complex faults and accurately identifies system weaknesses.The feasibility and accuracy of the method are further verified by conducting case studies.
文摘Land acquisition is subject of many frauds worldwide. In Africa countries, land acquisition frauds are a real curse. Main reasons of the high land acquisition frauds in Africa are a lack of a reliable land acquisition protocol implementation, no centralized information system that records land transactions and integrates all actors, lack of education about the acquisition protocol and lack of applied sanctions in case of frauds. As of sanctions, the issue is bound to the corruption plague in Africa. Authorities that are supposed to rule the laws are not well paid and are part of the corruption scheme. Most frequent frauds are multiple sales of the same land, falsified land title, false owner identification. In Africa, a land belongs generally to the first residents of the area. To claim ownership of a land, an owner should be recognized by the rural or city authorities. To achieve this recognition, he must obtain from those authorities an attribution letter. The author proposed a complete and reliable land acquisition protocol named ACLAP (Africa Countries Land Acquisition Protocol). The purpose of this paper is to explain the main components of the protocol implementation and show its efficiency when confronting fraud threats. In this paper, a Generic and Reliable Land Acquisition Protocol Implementation in Sub-Saharan Africa countries context is proposed. The platform keeps relevant land transaction information for administrators, managers, buyers, sellers, or for people consultation purpose. The application may be used in village, city, department, region, or country for land management decision making.
基金This researchwas supported by the National Natural Science Foundation of China(Nos.51767017 and 51867015)the Basic Research and Innovation Group Project of Gansu(No.18JR3RA133)the Natural Science Foundation of Gansu(No.21JR7RA258).
文摘At present,the operation and maintenance of photovoltaic power generation systems mainly comprise regular maintenance,breakdown maintenance,and condition-based maintenance,which is very likely to lead to over-or under-repair of equipment.Therefore,a preventive maintenance and replacement strategy for PV power generation systems based on reliability as a constraint is proposed.First,a hybrid failure function with a decreasing service age factor and an increasing failure rate factor is introduced to describe the deterioration of PV power generation equipment,and the equipment is replaced when its reliability drops to the replacement threshold in the last cycle.Then,based on the reliability as a constraint,the average maintenance cost and availability of the equipment are considered,and the non-periodic incomplete maintenance model of the PV power generation system is established to obtain the optimal number of repairs,each maintenance cycle and the replacement cycle of the PV power generation system components.Next,the inverter of a PV power plant is used as a research object.The model in this paper is compared and analyzed with the equal cycle maintenance model without considering reliability and the maintenance model without considering the equipment replacement threshold,Through model comparison,when the optimal maintenance strategy is(0.80,4),the average maintenance cost of this paper’s model are decreased by 20.3%and 5.54%and the availability is increased by 0.2395% and 0.0337%,respectively,compared with the equal-cycle maintenance model without considering the reliability constraint and the maintenance model without considering the equipment replacement threshold.Therefore,this maintenance model can ensure the high reliability of PV plant operation while increasing the equipment availability to improve the system economy.
文摘The objective of this paper is to evaluate the reliability of a system in its different states (absence of failures, partial failure and total failure) and to propose actions to improve this reliability by an approach based on Monte Carlo simulation. It consists of a probabilistic evaluation based on Markov Chains. In order to achieve this goal, the functionalities of Markov Chains and Monte Carlo simulation steps are deployed. The application is made on a production system. .
基金supported by Natural Science and Engineering Research Council (NSERC) of Canada
文摘Reliability-based design optimization (RBDO) is intrinsically a double-loop procedure since it involves an overall optimization and an iterative reliability assessment at each search point. Due to the double-loop procedure, the computational expense of RBDO is normally very high. Current RBDO research focuses on problems with explicitly expressed performance functions and readily available gradients. This paper addresses a more challenging type of RBDO problem in which the performance functions are computation intensive. These computation intensive functions are often considered as a "black-box" and their gradients are not available or not reliable. On the basis of the reliable design space (RDS) concept proposed earlier by the authors, this paper proposes a Reliable Space Pursuing (RSP) approach, in which RDS is first identified and then gradually refined while optimization is performed. It fundamentally avoids the nested optimization and probabilistic assessment loop. Three well known RBDO problems from the literature are used for testing and demonstrating the effectiveness of the proposed RSP method.
文摘AIM: To assess the inter-observer agreement and reliability as well as intra-observer repeatability for lacrimal scintigraphy(LS) reports with and without considering the irrigation test results.METHODS: A prospective, observational, cross sectional study. Two masked clinicians(lacrimal surgeon and nuclear medicine specialist) independently reported 100 LS images(50 patients of >6 years of age with unilateral anophthalmic socket) in a university hospital. The lacrimal surgeon performed a diagnostic irrigation test and repeated the report of the same LS images 2 y after the first report(intra-observer agreement). A weighted Kappa analysis was performed to determine inter-observer agreement and reliability as well as intra-observer repeatability for the type(normal, partial and complete obstruction) and location(presac, preduct, and intraduct) of the obstruction. Subgroup analysis was also performed with consideration of irrigation test results. RESULTS: A significantly moderate agreement was found between lacrimal surgeon and nuclear medicine specialist for both the type(Kappa=0.55) and location(Kappa=0.48) of obstruction. Agreement values were higher for the type(Kappa=0.61 vs 0.41) and location(Kappa=0.56 vs 0.31) of obstruction in cases with normal than abnormal irrigation test. Strong and significant intraobserver(lacrimal surgeon) repeatability was found for both the type(Kappa=0.66) and location(Kappa=0.69) of obstruction. LS showed no to slight reliability based on irrigation test.CONCLUSION: A moderate agreement is found between lacrimal surgeon and nuclear medicine specialist regarding the interpretation of LS suggesting the importance ofconsensus groups among nuclear medicine specialists and lacrimal surgeons to create a common language for interpretation of LS. Intra-observer repeatability is strong for the lacrimal surgeon.
基金supported by the Technical Basic Scientific Research Projects of State Administration of Science,Technology and Industry for National Defence,PRC (Grant No.JSZL2019204C001).
文摘In this work,an improved active kriging method based on the AK-IS and truncated importance sampling(TIS)method is proposed to efficiently evaluate structural reliability.The novel method called AWK-TIS is inspired by AK-IS and RBF-GA previously published in the literature.The innovation of the AWK-TIS is that TIS is adopted to lessen the sample pool size significantly,and the whale optimization algorithm(WOA)is employed to acquire the optimal Krigingmodel and themost probable point(MPP).To verify the performance of theAWK-TISmethod for structural reliability,four numerical cases which are utilized as benchmarks in literature and one real engineering problem about a jet van manipulate mechanism are tested.The results indicate the accuracy and efficiency of the proposed method.
基金supported by research fund for Civil Aircraft of Ministry of Industry and Information Technology(MJ-2020-Y-14)project funded by China Postdoctoral Science Foundation(Grant No.2021M700854).
文摘To effectively predict the mechanical dispatch reliability(MDR),the artificial neural networks method combined with aircraft operation health status parameters is proposed,which introduces the real civil aircraft operation data for verification,to improve the modeling precision and computing efficiency.Grey relational analysis can identify the degree of correlation between aircraft system health status(such as the unscheduled maintenance event,unit report event,and services number)and dispatch release and screen out themost closely related systems to determine the set of input parameters required for the prediction model.The artificial neural network using radial basis function(RBF)as a kernel function,has the best applicability in the prediction of multidimensional,small sample problems.Health status parameters of related systems are used as the input to predict the changing trend ofMDR,under the artificial neural network modeling framework.The case study collects real operation data for a certain civil aircraft over the past five years to validate the performance of the model which meets the requirements of the application.The results show that the prediction quadratic error Ep of the model reaches 6.9×10−8.That is to say,in the existing operating environment,the prediction of the number of delay&cancel events per month can be less than once.The accuracy of RBF ANN,BP ANN and GA-BP ANN are compared further,and the results show that RBF ANN has better adaptability to such multidimensional small sample problems.The efforts of this paper provide a highly efficientmethod for theMDR prediction through aircraft system health state parameters,which is a promising model to enhance the prediction and controllability of the dispatch release,providing support for the construction of the civil aircraft operation system.
文摘Introduction:Rotatory chair testing has been used to evaluate horizontal canal function.Frequently used tests include sinusoidal harmonic acceleration test(SHAT)and velocity step test(VST).Objectives:Assessment of age effect on the SHAT and VST and assessment of test-retest reliability of the parameters of those two tests.Methods:A prospective study was performed on 100 subjects with no ear or vestibular complaints and normal vestibular evaluation.They were divided into two groups;Group A:below 50 years of age and Group B:50 years of age or above.SHAT was presented at frequencies 0.02,0.04,0.08,0.16,0.32,0.64 Hz with a peak velocity of 60°/s.VST was performed using a maximum velocity of 100°/s with acceleration and deceleration of 200°/s2.Thirty subjects were tested twice to assess reliability.Results:Study participants ranged in age from 20 to 67 years.Regarding group A,the mean age was30.92±7.31 and 55.36±4.61 for group B.No significant differences were found in SHAT parameters between the two groups.As well,there was no significant difference in VST per-rotatory time constant,however,post-rotatory time constant was significantly longer for Group B(P value<0.05).Intraclass correlation coefficient(ICC)values showed moderate to good reliability(ICC 0.5800.818)for SHAT parameters for the lower frequencies and indicated moderate reliability for VST time constant(ICC 0.5090.652).Conclusions:Age has no significant effect on the parameters of SHAT and VST.Test-retest reliability is generally good for both tests.
基金supported by the 2020 Infrastructure Engineering Technology Innovation Projectthe“Intelligent Substation”Supporting Technology Research Project(031200WS22200001)。
文摘The reliability analysis of vertically integrated protection devices is crucial for designing International Electrotechnical Commission(IEC)61850-based substations.This paper presents the hardware architecture of a four-inone vertically integrated device and the information transmission path of each function based on the functional information transmission chain of protection devices,measurement and control devices,merging units,and intelligent terminals.Additionally,a reliability analysis model of the protection device and its protection system is constructed using the fault tree analysis method while considering the characteristics of each module of the vertically integrated device.The stability probability of the protection system in each state is analyzed by combining the state-transfer equations of line and busbar protection with a Markov chain.Finally,the failure rate and availability of the protection device and its protection system are calculated under different ambient temperatures using a 110 kV intelligent substation as an example.The sensitivity of each device module is analyzed.