In recent years, the data collecting and processing of magnetotelluric sounding (MT) have progressed greatly. How to improve the quality of field surveyed data and obtain the high quality parameters such as apparent...In recent years, the data collecting and processing of magnetotelluric sounding (MT) have progressed greatly. How to improve the quality of field surveyed data and obtain the high quality parameters such as apparent resistivity and phase is the most important link during the overall flow. It is closely related to the signal-to-noise ratio of magnetic sensors, the resolution of data collecting units and relevant processing methods as well. Produced by Germany Metronix Measurement Instruments and Electronics Ltd., the new type multi-channel geophysical measurement system GMS-06 was already adopted and used by domeslic units such as Institute of Geology and Geophysics of Chinese Academy of Sciences and Tongji University. Based on the brief introduction of GMS-06, this paper will give the comparisons and analyses of the synchronous surveyed MT data by GMS-06, MMS-03 MT system which was also produced by Metronix and V5-2000 MT system produced by Canada Phoenix Geophysics Ltd.. Then the preliminary processing and interpretation results of the long period MT data observed by GMS-06 in the area of Shanghai and Zhejiang are also discussed in the paper.展开更多
基金National Natural Science Foundation of China (40104005) and National High Technical Research and Development Project (2004AA615010).
文摘In recent years, the data collecting and processing of magnetotelluric sounding (MT) have progressed greatly. How to improve the quality of field surveyed data and obtain the high quality parameters such as apparent resistivity and phase is the most important link during the overall flow. It is closely related to the signal-to-noise ratio of magnetic sensors, the resolution of data collecting units and relevant processing methods as well. Produced by Germany Metronix Measurement Instruments and Electronics Ltd., the new type multi-channel geophysical measurement system GMS-06 was already adopted and used by domeslic units such as Institute of Geology and Geophysics of Chinese Academy of Sciences and Tongji University. Based on the brief introduction of GMS-06, this paper will give the comparisons and analyses of the synchronous surveyed MT data by GMS-06, MMS-03 MT system which was also produced by Metronix and V5-2000 MT system produced by Canada Phoenix Geophysics Ltd.. Then the preliminary processing and interpretation results of the long period MT data observed by GMS-06 in the area of Shanghai and Zhejiang are also discussed in the paper.