The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 20...The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 2012, which played important roles in guiding and planning the following transmission and transformation projects in environmental protection. In this paper, through the detail analysis on the objective and significance of the planning EIA of transmission and transformation power grid, legal basis and planning EIA practices, some suggestions and thinking about the planning EIA of transmission and transformation power grid were put forward.展开更多
晋北—南京和锡盟—泰州特高压直流工程落点苏北电网后,将会对江苏电网潮流分布带来不小的影响,因此,有必要对这2个直流投产后周边500 kV电网进行潮流优化控制研究。首先在PSS/E仿真程序中建立统一潮流控制器(unified power flow contro...晋北—南京和锡盟—泰州特高压直流工程落点苏北电网后,将会对江苏电网潮流分布带来不小的影响,因此,有必要对这2个直流投产后周边500 kV电网进行潮流优化控制研究。首先在PSS/E仿真程序中建立统一潮流控制器(unified power flow controller,UPFC)的机电暂态仿真模型;然后针对江苏电网2020年规划运行方式下,晋北—南京直流和锡盟—泰州直流相关断面线路N-1和N-2典型故障,研究断面线路潮流转移与过载情况;最后在江都—大港和泰州—凤城500 kV线路上安装UPFC,对存在线路潮流过载的故障,通过UPFC控制断面线路潮流转移,并计算所需的UPFC容量。展开更多
直流系统单极运行时会在周边变压器中引起直流偏磁,以江苏苏北电网±800 k V晋北—南京、±800 k V锡盟—泰州、±800 k V陇彬—徐州特高压直流工程为例,研究其对500 k V变电站直流偏磁的综合影响。兼顾各接地极附近土壤情...直流系统单极运行时会在周边变压器中引起直流偏磁,以江苏苏北电网±800 k V晋北—南京、±800 k V锡盟—泰州、±800 k V陇彬—徐州特高压直流工程为例,研究其对500 k V变电站直流偏磁的综合影响。兼顾各接地极附近土壤情况,采用综合水平多层土壤模型,建立了苏北电网直流系统模型,对单条或多条直流线路同时单极运行时附近变电站的偏磁电流进行仿真分析。结果表明:土壤电阻率越大,距离接地极同一位置处地电位越高;多条直流线路同时单极运行时主变偏磁电流数值等于各单条直流线路单极运行时的代数和;相邻变电站的抑制措施应综合考虑。展开更多
基金Supported by the National Key Technology R&D Program(2012BAC20B1003)the Key National Social Science Fund Project(12&ZD214)the Special Fund Project for the Scientific Research of the Environmental Protection Welfare Industry(201209001)
文摘The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 2012, which played important roles in guiding and planning the following transmission and transformation projects in environmental protection. In this paper, through the detail analysis on the objective and significance of the planning EIA of transmission and transformation power grid, legal basis and planning EIA practices, some suggestions and thinking about the planning EIA of transmission and transformation power grid were put forward.
文摘直流系统单极运行时会在周边变压器中引起直流偏磁,以江苏苏北电网±800 k V晋北—南京、±800 k V锡盟—泰州、±800 k V陇彬—徐州特高压直流工程为例,研究其对500 k V变电站直流偏磁的综合影响。兼顾各接地极附近土壤情况,采用综合水平多层土壤模型,建立了苏北电网直流系统模型,对单条或多条直流线路同时单极运行时附近变电站的偏磁电流进行仿真分析。结果表明:土壤电阻率越大,距离接地极同一位置处地电位越高;多条直流线路同时单极运行时主变偏磁电流数值等于各单条直流线路单极运行时的代数和;相邻变电站的抑制措施应综合考虑。