期刊文献+
共找到74篇文章
< 1 2 4 >
每页显示 20 50 100
Critical discharge at Datong for controlling operation of South-to-North Water Transfer Project in dry seasons 被引量:3
1
作者 Wang Yigang Huang Huiming Li Xi 《Water Science and Engineering》 EI CAS 2008年第2期47-58,共12页
关键词 saltwater intrusion critical discharge at Datong water diversion the south-to-north water transfer project
下载PDF
Geological conditions and key rock mechanics issues in the Western Route of South-to-North Water Transfer Project 被引量:2
2
作者 XuechaoWang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第3期234-243,共10页
In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel... In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed. 展开更多
关键词 the Western Route of south-to-north water transfer project rock mechanics issues classification of surrounding rocks stability of surrounding rocks excavation-induced damage lining design
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
3
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model south-to-north water Diversion project
下载PDF
Forecasting Loss of Ecosystem Service Value Using a BP Network: A Case Study of the Impact of the South-to-north Water Transfer Project on the Ecological Environmental in Xiangfan, Hubei Province, China 被引量:1
4
作者 YUN-FENG CHEN, JING-XUAN ZHOU, JIE XIAO, AND YAN-PING LIEnvironmental Science and Engineering College, Huazhong University of Science and Technology, Wuhan 430074, Hubei, China 《Biomedical and Environmental Sciences》 SCIE CAS CSCD 2003年第4期379-391,共13页
Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific... Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific countermeasures. Methods A three-layer BP network was built to simulate topology and process of the eco-economy system of Xiangfan. Historical data of ecological environmental factors and socio-economic factors as inputs, and corresponding historical data of ecosystem service value (ESV) and GDP as target outputs, were presented to train and test the network. When predicted input data after 2001 were presented to trained network as generalization sets, ESVs and GDPs of 2002, 2003, 2004... till 2050 were simulated as output in succession. Results Up to 2050, the area would have suffered an accumulative total ESV loss of RMB 104.9 billion, which accounted for 37.36% of the present ESV. The coinstantaneous GDP would change asynchronously with ESV, it would go through an up-to-down process and finally lose RMB89.3 billion, which accounted for 18.71% of 2001. Conclusions The simulation indicates that ESV loss means damage to the capability of socio-economic sustainable development, and suggests that artificial neural networks (ANNs) provide a feasible and effective method and have an important potential in ESV modeling. 展开更多
关键词 Artificial neural network BP Ecosystem service value south-to-north water transfer project
下载PDF
Price Analysis of Water Supply for South-to-North Water Transfer Project
5
作者 QIU Zhong enProfessor, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China Tan Chang liSenior Engineer, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China ZHU Qin Engineer, Design Institute, Chan 《人民长江》 北大核心 2001年第S1期29-32,共4页
The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from ... The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from the viewpoint of economic policies. It is considered that if the project is assigned as a profitable one and built depending on commercial loan from bank completely or mostly, the water price will be too high to be undertaken by users,and if the project places the public good at first while considering the economic benefit, its investment mainly relies on the state (national or local governments) appropriation and self-raised funds and a little from the bank loan on favorable terms, the price determined according to the principle of satisfying the cost and reasonable profit will be relatively lower and can be undertaken by the users in the North China where water shortage is serious. The problem of higher water price of agricultural irrigation to the north of the Yellow River can be tackled by taking measures such as "compensating agriculture by industry" according to foreign practical experiences and relevant suggestions. 展开更多
关键词 PRICE of water supply water PRICE estimation FUND RAISING schemes water transfer cost Middle-Route project of south-to-north water transfer
下载PDF
On conservation and development of architecture and environment in the construction of large-scale national infrastructure——Exemplified by the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project 被引量:1
6
作者 DUAN Jin ,LUO JianLi,WANG XingPing,TANG Jun&YU Gang School of Architecture,Southeast University,Nanjing 210096,China 《Science China(Technological Sciences)》 SCIE EI CAS 2009年第12期3613-3625,共13页
The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through ... The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through proposing and studying the canal culture routes,the water resources heritage corridors,the landscape and recreation corridors,and the town economic corridors.The station areas along the water-diverting route were scientifically zoned and graded through quantitative and qualitative synthetic methods.Both planning compendiums and construction controlling methods were proposed based on the project grades of points,lines,and areas.Conservation and development of architecture and environment in the large-scale national infrastructure construction were explored systemically.Theories and methods of developing harmonious water-supplying functions,ecological functions,landscape effects,and cultural effects of large-scale water resources were examined. 展开更多
关键词 jiangsu section of Eastern Route south-to-north water DIVERSION project CANAL culture routes water resources heritage CORRIDORS landscape and RECREATION CORRIDORS town economic CORRIDORS synthetical ZONING and grading
原文传递
引黄入冀补淀省界水质监测现状与问题对策分析
7
作者 田艳龙 任晓敏 +1 位作者 方新盛 李慧 《海河水利》 2024年第4期24-27,共4页
探讨了引黄入冀补淀工程的水质监测现状,分析了省界断面水质监测数据,指出了存在的问题,并提出了相应的对策。通过优化水质监测站点布局及监测频次、加强沿线监督检查、提升生活污水处理能力、建立健全协调机制、强化法律法规和政策支... 探讨了引黄入冀补淀工程的水质监测现状,分析了省界断面水质监测数据,指出了存在的问题,并提出了相应的对策。通过优化水质监测站点布局及监测频次、加强沿线监督检查、提升生活污水处理能力、建立健全协调机制、强化法律法规和政策支持等措施,以期提高水质监测的准确性和及时性,为进一步实施水资源管理提供理论依据和实践指导。 展开更多
关键词 引黄入冀补淀工程 水质监测 省界断面 对策
下载PDF
Simulation of Transport Channel in China's Middle Route South-to-North Water Transfer Project 被引量:3
8
作者 方神光 魏加华 +1 位作者 吴保生 尚毅梓 《Tsinghua Science and Technology》 SCIE EI CAS 2009年第3期367-377,共11页
The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate t... The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate the effect of many transfer structures on the water levels in the main channel. Various gate operating and control methods were analyzed to study the response to disturbances produced by varying the flow rates through the Tianjin outlet. The results show that when the inflow at the head changes in the same way as the sum of the flow rates through all the outlets, the transition time and the fluctuation of the water levels using the timed gate operation method are less than when using the simultaneous gate operation method, but the variations of the gate openings and flow rates through each control gate are much larger. The flow disturbances produced by the Tianjin outlet can be rectified within several channel sections and the transition time can be greatly shortened by allowing the water levels immediately upstream of the control gates to vary within proscribed ranges, rather than being held constant. 展开更多
关键词 Middle Route south-to-north water transfer project unsteady flow open channel control system SIMULATION
原文传递
Ecological assessment of lakeshore wetland rehabilitation on eastern route of South-to-North Water Transfer Project 被引量:1
9
作者 Jian ZHANG Fei MENG +4 位作者 Yifeng LU Yuming JING Huayong ZHANG Bo ZHANG Chenglu ZHANG 《Frontiers of Environmental Science & Engineering》 SCIE EI CSCD 2008年第3期306-310,共5页
To evaluate the ecological effects of lakeshore wetland rehabilitation on the eastern route of the Southto-NorthWater Transfer Project,species composition,coverage,height,and biomass of wetland communities at 22 sites... To evaluate the ecological effects of lakeshore wetland rehabilitation on the eastern route of the Southto-NorthWater Transfer Project,species composition,coverage,height,and biomass of wetland communities at 22 sites of the study area on the shore of Nansi Lake in April and May 2007 were investigated.The wetlands under investigation were divided into platform fields,transition zones,and shallow water zones according to differences in elevations,water levels,and human activities.The species richness index,Shannon-Wiener index,Simpson index,and Pielou Evenness index were adopted to delineate and discuss the ecological effects of lakeshore wetland rehabilitation in 22 quadrates.Results showed that the species richness of the wetland areas after 2 years’rehabilitation amounted to 47 of 24 families,higher than 25 of 20 families in areas without rehabilitation.The biodiversity index and abundance index of rehabilitated areas were also higher than those of platform fields and fish ponds where there was no rehabilitation.In addition,the Shannon-Wiener index,Simpson index,and community evenness index of platform fields in rehabilitated wetland areas were 1.619,0.745,and 0.860,respectively,higher than those of the platform fields before rehabilitating.The results suggested that the constructed lakeshore wetland played an important role in protecting the diversity of species. 展开更多
关键词 wetland rehabilitation Nansi Lake constructed wetland south-to-north water transfer project
原文传递
Coupling interaction between biodiversity and aquatic habitat area in Western Route Project vicinity 被引量:1
10
作者 Shi-min TIAN Zhao-yin WANG +1 位作者 Xiang-jun LIU Shi-kui LIANG 《Water Science and Engineering》 EI CAS 2010年第3期354-360,共7页
The Western Route of the South-to-North Water Transfer Project will divert water from the upper Yangtze River and its tributaries, the Dadu River and Yalong River, to the upper Yellow River. The project may ease the w... The Western Route of the South-to-North Water Transfer Project will divert water from the upper Yangtze River and its tributaries, the Dadu River and Yalong River, to the upper Yellow River. The project may ease the water shortage in the Yellow River Basin. However, it may also have some effects on the ecosystem in the upper Yangtze River Basin. Benthic invertebrates play an important role in the river ecosystem, particularly in the circulation of materials and nutrition. Benthic invertebrates are widely used to quickly assess river ecosystems because of their rapid response to changes in the water environment. The diversity of benthic invertebrates is closely associated with the aquatic habitat area. This study examined this interaction by sampling the benthic invertebrates in an expanding area. The conclusions are that the diversity of benthic invertebrates begins to decrease when the aquatic habitat area is reduced to 45% of the original area, and decreases dramatically when the aquatic habitat area is reduced to 10% of the original area. The aquatic habitat area should be kept at more than 45% of the original area in order to maintain the significant diversity of benthic invertebrates. 展开更多
关键词 Western Route project south-to-north water transfer project river ecosystem benthic invertebrates BIODIVERSITY aquatic habitat area
下载PDF
2-D NUMERICAL SIMULATION OF FLOODING EFFECTS CAUSED BY SOUTH-TO-NORTH WATER TRANSFER PROJECT 被引量:1
11
作者 SUN Dong-po XUE Hai +2 位作者 WANG Peng-tao LU Rui-li LIAO Xiao- long 《Journal of Hydrodynamics》 SCIE EI CSCD 2008年第5期662-667,共6页
Since the General Channel designed for the South-to-North Water Transfer Project in China has to cross many rivers and streams flowing from west to east, there are potentially serious effects additional flooding on th... Since the General Channel designed for the South-to-North Water Transfer Project in China has to cross many rivers and streams flowing from west to east, there are potentially serious effects additional flooding on the western side of the project alignment. Therefore, a 2-D numerical model for forecasting basin flood disasters was established and verified using historical flood data. The model was applied to researching the interaction between the proposed Project and flooding events for 5 streams in the Anyang River reach as a representative case study. Simulated results indicate that the model could correctly forecast the flood, submerged area and depths, and water surface elevations along the left side of the channel. The discharge capacity and location of hydraulic structures in the transfer canal alignment were analyzed. Then adjustments to the dimensions and positioning of proposed hydraulic structures were recommended at intersections, especially the addition of a channel to transfer flood water from one stream to another, which can effectively limit the sluice and protect the Anyang City from flooding. 展开更多
关键词 south-to-north water transfer project 2-D numerical simulation interpenetrating flood field diffiuent canal
原文传递
南水北调东线工程江苏段水资源调配研究 被引量:2
12
作者 方国华 赵文萃 +2 位作者 李鑫 闻昕 周冰逸 《水资源保护》 EI CAS CSCD 北大核心 2023年第4期1-8,共8页
针对南水北调东线工程江苏段受水区的水资源调度与配置问题,以受水区总缺水量最小和泵站总能耗最小为目标,建立南水北调东线工程江苏段水资源优化调度模型。将南水北调工程调水与本地水资源进行联合配置,并以经济效益、社会效益、环境... 针对南水北调东线工程江苏段受水区的水资源调度与配置问题,以受水区总缺水量最小和泵站总能耗最小为目标,建立南水北调东线工程江苏段水资源优化调度模型。将南水北调工程调水与本地水资源进行联合配置,并以经济效益、社会效益、环境效益最大为目标,构建南水北调东线工程江苏段水资源配置模型。采用基本方案和节水方案进行了模型模拟,结果表明,在降水保证率分别为50%、75%和95%3种情况下,受水区节水方案缺水率比基本方案分别下降了2.91%、3.61%和3.83%;受水区节水方案下各工程基本完成了受水区的供水任务,且优先利用了泵站单位能耗较小的运西线进行调水,说明优化调度配置方式在保障受水区用水的基础上,能够以更为经济节能的方式运行。 展开更多
关键词 南水北调东线工程江苏段 水资源优化调度 水资源配置 需水预测 受水区
下载PDF
江苏省南水北调多工程多目标联合优化调度方法 被引量:3
13
作者 闻昕 黄抒艺 +4 位作者 谭乔凤 方国华 薛刘宇 贾璐 王浩 《水资源保护》 EI CAS CSCD 北大核心 2023年第5期118-124,134,共8页
为统筹协调江苏省南水北调水资源调配系统内各方用水要求和矛盾,提升工程效率,降低系统耗电成本,提出了面向多工程多目标的联合优化调度方法,并基于该方法构建了联合调度优化模型,针对丰、平、枯3种典型年提出了联合优化调度方案。与江... 为统筹协调江苏省南水北调水资源调配系统内各方用水要求和矛盾,提升工程效率,降低系统耗电成本,提出了面向多工程多目标的联合优化调度方法,并基于该方法构建了联合调度优化模型,针对丰、平、枯3种典型年提出了联合优化调度方案。与江水北调工程与南水北调东线一期工程实际的独立运行调度模式对比结果表明,联合优化调度方案总耗电成本可分别降低31%、14%和29%,相较于独立运行调度模式,联合优化调度方案能更科学地进行水源及输水线路的选择和切换,更充分地利用沿线湖泊的调蓄能力,通过复杂闸泵系统的联合运行,实现不同类别水源的互济互调,更有效地提升系统效益。 展开更多
关键词 跨流域调水 多尺度调度 湖泊群调度 梯级泵站运行 南水北调工程 江苏省
下载PDF
南水北调东线工程江苏段大型泵站非电量保护研究与应用
14
作者 沈昌荣 杜鹏程 《江苏水利》 2023年第12期39-43,共5页
针对泵站设备中还有大量非电气数据尚未有效利用与保护的问题,结合南水北调东线工程江苏段洪泽站监控系统软硬件改造,从非电气数据处理、模型构建、逻辑完善、定值管理等方面开展非电量保护研究并试点应用,为泵站非电量保护研究提供借鉴。
关键词 南水北调东线工程江苏段 泵站 非电量保护
下载PDF
改进的多目标量子遗传算法在南水北调东线工程江苏段水资源优化调度中的应用 被引量:23
15
作者 方国华 郭玉雪 +1 位作者 闻昕 黄显峰 《水资源保护》 CAS CSCD 北大核心 2018年第2期34-41,共8页
构建南水北调东线工程江苏段水资源优化调度模型,采用改进的多目标量子遗传算法(multiobjective quantum genetic algorithm,MOQGA),运用组合赋权方法对非劣解集进行多属性决策,提出南水北调东线工程江苏段水资源优化调度方案。在平水... 构建南水北调东线工程江苏段水资源优化调度模型,采用改进的多目标量子遗传算法(multiobjective quantum genetic algorithm,MOQGA),运用组合赋权方法对非劣解集进行多属性决策,提出南水北调东线工程江苏段水资源优化调度方案。在平水年、枯水年和特枯水年3种典型年来水条件下,相对于常规调度,优化调度的受水区总缺水量分别减少了0.89亿m3、0.87亿m3和0.08亿m3,系统总抽水量分别减少21.04亿m3、39.14亿m3和50.76亿m3。该优化调度方案能够充分利用湖泊的调蓄能力,提高各用水户的需水满足度,降低抽水成本。 展开更多
关键词 多目标优化 南水北调东线工程江苏段 改进的多目标量子遗传算法 水资源优化调度
下载PDF
水面蒸发对南水北调江苏段调水效率的影响 被引量:4
16
作者 仇宝云 王斐 +2 位作者 冯晓莉 黄海田 杨兴丽 《排灌机械工程学报》 EI 2011年第3期219-223,共5页
为了掌握南水北调东线江苏境内工程输水河道和调蓄湖库水面蒸发损失水量,及其所造成的泵站机组损失功率,了解水面蒸发对工程调水效率的影响,分析比较了适用于工程所在地区的水面蒸发量计算模型和计算公式,计算了工程沿线输水河道和调蓄... 为了掌握南水北调东线江苏境内工程输水河道和调蓄湖库水面蒸发损失水量,及其所造成的泵站机组损失功率,了解水面蒸发对工程调水效率的影响,分析比较了适用于工程所在地区的水面蒸发量计算模型和计算公式,计算了工程沿线输水河道和调蓄湖库的水面蒸发量,分析了工程水面蒸发量的时间和空间分布特征.通过积分,计算了水面蒸发造成的各梯级泵站的流量损失和输入功率损失,求解并分析了水面蒸发对整个江苏段工程调水效率的影响.结果表明:工程沿线水面年蒸发量自南向北、西北方向逐渐递增;蒸发量夏季最高,冬季最低;全线平均水面年蒸发量为862.2 mm.洪泽湖、骆马湖、白马湖和输水河道蒸发损失水量分别占总蒸发损失水量的77.7%,13.3%,3.6%和5.4%,蒸发损失水量约占源头泵站抽水量的17.46%,使工程平均调水效率降低10.33%.调水工程可以考虑采用管道输水,从而避免蒸发损失. 展开更多
关键词 南水北调东线 江苏段 输水河道 水面蒸发量 工程调水效率 调蓄湖库
下载PDF
南水北调东线工程江苏段多目标优化调度研究 被引量:21
17
作者 郭玉雪 张劲松 +3 位作者 郑在洲 方国华 薛刘宇 闻昕 《水利学报》 EI CSCD 北大核心 2018年第11期1313-1327,共15页
考虑南水北调东线工程供水目标、经济成本以及系统稳定性特点,本文以受水区生活、工业以及农业用水供水量最大,梯级总抽水量最小以及调水峰值最小5个目标为优化目标,构建了南水北调东线工程江苏段水资源优化调度模型。在此基础上,针对... 考虑南水北调东线工程供水目标、经济成本以及系统稳定性特点,本文以受水区生活、工业以及农业用水供水量最大,梯级总抽水量最小以及调水峰值最小5个目标为优化目标,构建了南水北调东线工程江苏段水资源优化调度模型。在此基础上,针对传统多目标蛙跳算法(MOSFLA)存在多样性差,后期易陷于局部最优解等缺点,本文提出了一种改进的多目标蛙跳算法(MQSFLA),通过引入实数量子编码、采用改进的量子旋转门局部更新策略以及基于动态外部档案集维护Pareto非劣解的方式,改善传统MOSFLA。分别基于MQSFLA和MOSFLA求解3种典型来水条件下的多目标优化模型,分析不同目标之间的关系,提出调蓄湖泊群联合优化调度和水量调配方案。结果表明:MQSFLA在多样性和收敛性方面都优于传统的MOSFLA,能得到更多高质量的非劣解集,更有效协调供水以及抽水的矛盾,满足不同来水条件下多水源相互补给的多目标优化调度,为南水北调东线工程江苏段的运行管理提供理论依据和科学支撑。 展开更多
关键词 多目标 南水北调东线工程江苏段 水资源优化调度 改进的多目标蛙跳算法 动态外部档案集
下载PDF
长输水渠道前馈控制时间研究 被引量:5
18
作者 崔巍 陈文学 +1 位作者 穆祥鹏 郭晓晨 《水利学报》 EI CSCD 北大核心 2009年第11期1345-1350,共6页
基于明渠非恒定渐变流理论,模拟分析了长输水渠道在不同边界条件下,闸门和分水口引发的沿程水位和流量的波动过程。模拟分析了不同闸门前馈控制时间对分水口处水位波动的影响,提出了有效降低水位波动的前馈控制时间及其计算方法。前馈... 基于明渠非恒定渐变流理论,模拟分析了长输水渠道在不同边界条件下,闸门和分水口引发的沿程水位和流量的波动过程。模拟分析了不同闸门前馈控制时间对分水口处水位波动的影响,提出了有效降低水位波动的前馈控制时间及其计算方法。前馈控制时间根据移动波在上下游方向传播的速度计算得出。在南水北调中线京石段渠道上,应用蓄量补偿法进行了前馈控制仿真,分别使用了蓄量补偿法前馈控制时间计算公式和本文提出的前馈控制时间计算公式。计算结果表明,应用本文提出的前馈时间计算公式,能够有效降低渠道运行过程中分水口处的水位波动,达到更好的前馈控制效果。 展开更多
关键词 明渠输水工程 前馈控制 水波运动 南水北调中线京石段
下载PDF
国内外渡槽的发展与南水北调中线漕河渡槽 被引量:13
19
作者 周厚贵 马吉明 马金刚 《南水北调与水利科技》 CAS CSCD 2007年第3期14-17,20,共5页
渡槽是人类文明发展的主要物证。采用调研、查新、考证方法提出了国内外渡槽的发展及现状;在此基础上,采用综合比较方法给出了南水北调中线漕河渡槽在当今世界的特征和地位。
关键词 渡槽 漕河段 南水北调 水利工程
下载PDF
南水北调中线(北京段)输水暗涵工程检修及缺陷处理关键技术 被引量:2
20
作者 张奇 付云升 +1 位作者 王东黎 杨进新 《水利水电技术》 CSCD 北大核心 2015年第9期32-36,共5页
为保证安全输水,南水北调中线(北京段)输水暗涵工程在2014年再次进行了检修维护。本次检测在输水暗涵全线排空基础上实施,采用了人工普查、Prometer型钢筋定位仪、Gecor8钢筋锈蚀仪、超声波探测仪、探地雷达等多种设施。针对结构缝严重... 为保证安全输水,南水北调中线(北京段)输水暗涵工程在2014年再次进行了检修维护。本次检测在输水暗涵全线排空基础上实施,采用了人工普查、Prometer型钢筋定位仪、Gecor8钢筋锈蚀仪、超声波探测仪、探地雷达等多种设施。针对结构缝严重渗漏部位、混凝土裂缝、表面钢筋腐蚀和露筋、混凝土内部缺陷和围堰脱空等工程缺陷,结合实际外部条件,提出了带压速凝—高压化学灌浆—抗压封闭、涂浆封闭、压筑聚合物砂浆等措施。经维护后重新检测,所采取的加固措施合理,施工质量满足工程运行要求。 展开更多
关键词 南水北调工程 中线(北京段)工程 输水暗涵 检修维护
下载PDF
上一页 1 2 4 下一页 到第