The Deformation and Stress Analysis of Na Ba Reservoir Concrete Face Rock-Fill Dam
1
作者 Yin Shaofei Peng Hui +3 位作者 Wu Fan Wen Chen Jin Ke Han Kai 《Journal of Environmental Science and Engineering(B)》 2016年第10期489-494,共6页
Based on the APDL (ANSYS Parametric Design Language) and combined with the actual project related to parameters of filling material, imported Duncan-Chang constitutive model which has been widely applied in soil mas... Based on the APDL (ANSYS Parametric Design Language) and combined with the actual project related to parameters of filling material, imported Duncan-Chang constitutive model which has been widely applied in soil mass and rock-fill in the ANSYS software. With the three-dimensional nonlinear finite element analysis by the mid-point incremental method, what have been computed are the deformation and stress analysis ofNa Ba reservoir CFRD (Concrete Face Rock-fill Dam) in filling period. The calculation results provide practical reference for the dam during construction safety filling stress and deformation analysis and real-time monitoring. 展开更多
关键词 concrete face rock-fill dam deformation and stress analysis Duncan-Chang constitutive model nonlinear finite element analysis.
下载PDF
Prediction of Concrete Faced Rock Fill Dams Settlements Using Genetic Programming Algorithm 被引量:3
2
作者 Seyed Morteza Marandi Seyed Mahmood VaeziNejad Elyas Khavari 《International Journal of Geosciences》 2012年第3期601-609,共9页
In the present study a Genetic Programing model (GP) proposed for the prediction of relative crest settlement of concrete faced rock fill dams. To this end information of 30 large dams constructed in seven countries a... In the present study a Genetic Programing model (GP) proposed for the prediction of relative crest settlement of concrete faced rock fill dams. To this end information of 30 large dams constructed in seven countries across the world is gathered with their reported settlements. The results showed that the GP model is able to estimate the dam settlement properly based on four properties, void ratio of dam’s body (e), height (H), vertical deformation modulus (Ev) and shape factor (Sc) of the dam. For verification of the model applicability, obtained results compared with other research methods such as Clements’s formula and the finite element model. The comparison showed that in all cases the GP model led to be more accurate than those of performed in literature. Also a proper compatibility between the GP model and the finite element model was perceived. 展开更多
关键词 concrete faced rock-fill damS SETTLEMENT Genetic Programming ALGORITHM Finite Element Model
下载PDF
Parameter sensitivity and inversion analysis of a concrete faced rock-fill dam based on HS-BPNN algorithm 被引量:9
3
作者 SUN PengMing BAO TengFei +3 位作者 GU ChongShi JIANG Ming WANG Tian SHI ZhongWen 《Science China(Technological Sciences)》 SCIE EI CAS CSCD 2016年第9期1442-1451,共10页
Considering the complex nonlinear relationship between the material parameters of a concrete faced rock-fill dam(CFRD) and its displacements, the harmony search(HS) algorithm is used to optimize the back propagation n... Considering the complex nonlinear relationship between the material parameters of a concrete faced rock-fill dam(CFRD) and its displacements, the harmony search(HS) algorithm is used to optimize the back propagation neural network(BPNN), and the HS-BPNN algorithm is formed and applied for the inversion analysis of the parameters of rock-fill materials. The sensitivity of the parameters in the Duncan and Chang's E-B model is analyzed using the orthogonal test design. The case study shows that the parameters φ0, K, Rf, and Kb are sensitive to the deformation of the rock-fill dam and the inversion analysis for these parameters is performed by the HS-BPNN algorithm. Compared with the traditional BPNN, the HS-BPNN algorithm exhibits the advantages of high convergence precision, fast convergence rate, and strong stability. 展开更多
关键词 parameter sensitivity analysis harmony search algorithm back propagation neural network parameter inversion concrete faced rock-fill dam
原文传递
Key technical problems of extra-high concrete faced rock-fill dam 被引量:2
4
作者 MA HongQi1? & CAO KeMing2 1Yunnan Huaneng Lancang River Hydropower Co., Ltd., Kunming 650011, China 2East China Investigation, Design & Research Institute, Hangzhou 310014, China 《Science China(Technological Sciences)》 SCIE EI CAS 2007年第z1期20-33,共14页
This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete ... This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete faced rock-fill dams. This paper has raised the key technical problems which need to study for construction of 300 m-height-scale concrete faced rock-fill dams based on the main experiences on the extra-high concrete faced rock-fill dams built after the year of 2000. 展开更多
关键词 concrete faced rock-fill dam extra-high dam KEY TECHNOLOGY
原文传递
九甸峡混凝土面板堆石坝挤压边墙施工有限元仿真分析 被引量:6
5
作者 马明 沈振中 吕生玺 《水利水电技术》 CSCD 北大核心 2008年第9期59-62,70,共5页
九甸峡水利枢纽坝址河谷左岸陡峭,局部存在倒坡,右岸发育侵蚀堆积阶地,河床覆盖层最大厚度54~56m,地形地质条件极为复杂。混凝土面板堆石坝最大高度136.5m,采用挤压边墙施工方法。采用三维非线性有限元法,对挤压边墙和坝体填筑... 九甸峡水利枢纽坝址河谷左岸陡峭,局部存在倒坡,右岸发育侵蚀堆积阶地,河床覆盖层最大厚度54~56m,地形地质条件极为复杂。混凝土面板堆石坝最大高度136.5m,采用挤压边墙施工方法。采用三维非线性有限元法,对挤压边墙和坝体填筑施工过程进行仿真模拟,分析和比较该坝的应力和变形规律。获得了该坝应力和变形的主要特征值,并分析了挤压边墙施工对面板和堆石体应力和变形的影响,指出挤压边墙施工可以改善面板的应力和变形,其设计施工方案是合理的。所得结论可供类似工程参考。 展开更多
关键词 混凝土面板堆石坝 非线性有限元法 挤压边墙 应力和变形 九甸峡水利枢纽工程
下载PDF
洮河九甸峡水利枢纽工程混凝土面板堆石坝设计 被引量:3
6
作者 吕生玺 温续余 庞晓岚 《水利水电技术》 CSCD 北大核心 2005年第11期48-51,共4页
九甸峡水利枢纽工程混凝土面板堆石坝最大坝高136.5 m,坝址区地震烈度高,河谷狭窄,岸坡陡峻,河床分布深52~54 m、宽30~50 m左右的深厚覆盖层,为目前国内在深厚覆盖层修建的最高面板堆石坝.文中介绍了该混凝土面板堆石坝的布置、坝体... 九甸峡水利枢纽工程混凝土面板堆石坝最大坝高136.5 m,坝址区地震烈度高,河谷狭窄,岸坡陡峻,河床分布深52~54 m、宽30~50 m左右的深厚覆盖层,为目前国内在深厚覆盖层修建的最高面板堆石坝.文中介绍了该混凝土面板堆石坝的布置、坝体分区、坝料设计、趾板结构、周边缝结构设计等,特别研究比较了河床深厚覆盖层平趾板处理措施和采取防渗墙截渗的结构特点,同时对于在覆盖层上修建高面板堆石坝进行了有益的探索. 展开更多
关键词 混凝土面板堆石坝 深覆盖层 设计 九甸峡水利枢纽 甘肃省
下载PDF
九甸峡混凝土面板堆石坝河床防渗结构研究 被引量:3
7
作者 吕生玺 《水利水电技术》 CSCD 北大核心 2010年第3期64-67,共4页
九甸峡水利枢纽工程混凝土面板堆石坝坝址河谷狭窄,岸坡陡峻,河床分布深厚覆盖层。根据地形地质条件,采用了大坝直接修建在覆盖层上的方案,其河床防渗的结构形式是整个大坝防渗系统的关键。设计考虑了单防渗墙柔性连接、双防渗墙柔性连... 九甸峡水利枢纽工程混凝土面板堆石坝坝址河谷狭窄,岸坡陡峻,河床分布深厚覆盖层。根据地形地质条件,采用了大坝直接修建在覆盖层上的方案,其河床防渗的结构形式是整个大坝防渗系统的关键。设计考虑了单防渗墙柔性连接、双防渗墙柔性连接、双防渗墙刚性连接等3个方案,采用三维非线性有限元方法,对各个方案坝体和面板的位移反应、应力反应,以及周边缝和面板接缝的位移反应等进行了计算分析。研究了不同方案的特点和规律,确定了合理的设计方案,经实施验证,效果良好。 展开更多
关键词 九甸峡混凝土面板堆石坝 趾板 防渗墙 柔性连接 刚性连接 应力应变
下载PDF
浅谈面板堆石坝面板混凝土的质量控制 被引量:2
8
作者 张世杰 纪军 高柏林 《水力发电》 北大核心 2010年第11期71-73,共3页
九甸峡水利枢纽混凝土面板堆石坝地处高寒峡谷地区、覆盖层较深、地震设防烈度高、风速较大,自然条件对面板的施工极为不利。通过把面板混凝土质量控制分解为内在质量控制和外在质量控制两个方面,针对工程特点和难点细化了控制目标,对... 九甸峡水利枢纽混凝土面板堆石坝地处高寒峡谷地区、覆盖层较深、地震设防烈度高、风速较大,自然条件对面板的施工极为不利。通过把面板混凝土质量控制分解为内在质量控制和外在质量控制两个方面,针对工程特点和难点细化了控制目标,对施工关键工序提出了控制要求。面板浇筑完成后进行检查,没有发现结构性裂缝,库水位最高蓄至2 201.0 m(距正常蓄水位1.0 m),面板未发现裂缝,运行良好。 展开更多
关键词 面板堆石坝 面板混凝土 质量控制 dam concrete face SLAB Control 九甸峡水利枢纽 地震设防烈度 特点和难点 结构性裂缝 混凝土质量 自然条件 峡谷地区 施工 面板浇筑 控制要求 控制目标 控制分解 关键工序
下载PDF
甘肃洮河九甸峡水利枢纽工程特点 被引量:1
9
作者 董红健 彭维 刘国俊 《水力发电》 北大核心 2010年第11期57-59,共3页
九甸峡水利枢纽大坝是我国首次在高寒地区、高地震烈度区、高陡边坡和深厚覆盖层基础条件下建设的百米级高混凝土面板堆石坝,其库容大,工程区地形、地质条件复杂,工程建设尤其是大坝建设技术含量高,施工难度大。为此,在混凝土面板堆石... 九甸峡水利枢纽大坝是我国首次在高寒地区、高地震烈度区、高陡边坡和深厚覆盖层基础条件下建设的百米级高混凝土面板堆石坝,其库容大,工程区地形、地质条件复杂,工程建设尤其是大坝建设技术含量高,施工难度大。为此,在混凝土面板堆石坝设计中,进行了抗寒、抗震措施研究,对高陡边坡和深厚覆盖层进行了处理,此外,厂房后边坡加固、偏心铰弧门安装、调压井优选等方面也取得了良好效果,运行情况良好。 展开更多
关键词 甘肃 洮河九甸峡水利枢纽 混凝土面板堆石坝 深厚覆盖层 高陡边坡 工程建设 地震烈度区 运行情况 施工难度 抗震措施 技术含量 基础条件 弧门安装 地质条件 大坝建设 边坡加固 偏心铰 坝设计 优选 压井