Occurrence conditions of groundwater in southern karst area are complicated. The water-bearing media in the karst have multiplicity, and the groundwater is hosted in holes, gaps, seams, pipes and caves. The karst wate...Occurrence conditions of groundwater in southern karst area are complicated. The water-bearing media in the karst have multiplicity, and the groundwater is hosted in holes, gaps, seams, pipes and caves. The karst water shows heterogeneity where fast and slow flow coexist, and the Darcy and non-Darcy flow coexist, and the liquid flow, the gas flow and solid flow coexist. The evaluation and investigation indicates that the mineable resource of karst groundwater is about 53.44 billion m^3/y, and the current exploitation quantity is merely 6.565 billion m^3/year. The exploitation and utilization potential is gigantic. In the region there are altogether 2 763 karst subterranean rivers with a total length of 12 687 km. The dry season runoff volume equals to 47 billion m^3/year. At present the exploitation is only 10%. Four effective utilization models of karst groundwater resources have been put forward.(1) The karst hills-depression zone formed the surface-underground united reservoir. By digging tunnels, water diversion irrigation and generating electricity, the ecological economy is developed.(2) In the deep-cut peak cluster depression area, by using the high-part Epikarst spring and constructing the regulation and storage water tank, the stereo ecological agriculture is developed.(3) In the karst peak forest plain and hilly-gully area, the pump-type underground regulating reservoir is constructed and the water-saving ecological agriculture is strengthened.(4) In the fault basin region with the surrounding groundwater runoff belting beam backwater, the water resources are jointly controlled to develop a fruit crop base within the basin.展开更多
The paper discusses the implementing of the magnificent transbasin Middle Route Project of South North Water Transfer, water resources in the middle reaches of Yangtze River should be optimized utilized. It puts forwa...The paper discusses the implementing of the magnificent transbasin Middle Route Project of South North Water Transfer, water resources in the middle reaches of Yangtze River should be optimized utilized. It puts forward that the research should concentrate on the problem of sustainable development in Middle Route Project water source area, the problem of optimized transfer of water resources in the Yangtze Valley and the problem of water resources development and utilization and ecological environment protection, etc.展开更多
基金supported by project of Southwest Karst Area Geological Research Hydrogeological Environment (1212011121157)project of Southwest Typical Karst Underground River Investigation and Dynamic Evaluation (1212011220959)+1 种基金project of Monitor and Test of Typical Karst Subterranean River System Water Circulation Mechanism (201411100)project of Red River Basin Upstream Karst 1/50 000 Hydrogeologic Environment Geological Survey (DD20160300)
文摘Occurrence conditions of groundwater in southern karst area are complicated. The water-bearing media in the karst have multiplicity, and the groundwater is hosted in holes, gaps, seams, pipes and caves. The karst water shows heterogeneity where fast and slow flow coexist, and the Darcy and non-Darcy flow coexist, and the liquid flow, the gas flow and solid flow coexist. The evaluation and investigation indicates that the mineable resource of karst groundwater is about 53.44 billion m^3/y, and the current exploitation quantity is merely 6.565 billion m^3/year. The exploitation and utilization potential is gigantic. In the region there are altogether 2 763 karst subterranean rivers with a total length of 12 687 km. The dry season runoff volume equals to 47 billion m^3/year. At present the exploitation is only 10%. Four effective utilization models of karst groundwater resources have been put forward.(1) The karst hills-depression zone formed the surface-underground united reservoir. By digging tunnels, water diversion irrigation and generating electricity, the ecological economy is developed.(2) In the deep-cut peak cluster depression area, by using the high-part Epikarst spring and constructing the regulation and storage water tank, the stereo ecological agriculture is developed.(3) In the karst peak forest plain and hilly-gully area, the pump-type underground regulating reservoir is constructed and the water-saving ecological agriculture is strengthened.(4) In the fault basin region with the surrounding groundwater runoff belting beam backwater, the water resources are jointly controlled to develop a fruit crop base within the basin.
文摘The paper discusses the implementing of the magnificent transbasin Middle Route Project of South North Water Transfer, water resources in the middle reaches of Yangtze River should be optimized utilized. It puts forward that the research should concentrate on the problem of sustainable development in Middle Route Project water source area, the problem of optimized transfer of water resources in the Yangtze Valley and the problem of water resources development and utilization and ecological environment protection, etc.