期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Performance Evaluation of Sediment Basins: Case Study of Keya Hydropower Plant in Rwanda
1
作者 Omar Munyaneza Félicien Majoro +1 位作者 Sylvain Mutake Emmanuel Hagenimana 《Journal of Water Resource and Protection》 2015年第16期1387-1398,共12页
Keya Hydropower Plant (HPP) is a run-off-river plant which can be an effective green solution contributing to the current energy demand in Rwanda but a huge amount of sediment contained in water of Sebeya River on whi... Keya Hydropower Plant (HPP) is a run-off-river plant which can be an effective green solution contributing to the current energy demand in Rwanda but a huge amount of sediment contained in water of Sebeya River on which this plant is built results in loss of the plant capacity. The aim of this study was to conduct the performance evaluation of Keya HPP sediment basin located in Rubavu district, western province of Rwanda. Specifically, laboratory tests of sediment, efficiency of the basin, assessment of sedimentation problems on HPP operations, proposition of technical options for increasing the removal efficiency of sediment basin and other options for reducing sediment at the source of generation were performed using different methods including interviews and questioning Keya hydropower technicians, field sediment sampling followed by hydrometer and Particle Size Distribution (PSD) analysis. Analysis was made in University of Rwanda (UR) Soil Mechanics laboratory. MICROSOFT EXCEL and Graphisoft Archicad 18 softwares with Massachusetts Institute of Technology (MIT) soil classification were used as data analysis tools. Results showed that the overall efficiency removal of the diversion headwork was 85%. However, after comparing sediment concentration at the inlet and outlet of the sediment basin, it was found that the basin removed only 22% of sediment from diverted water toward the turbine. This means that 78% of sediment escapes the basin to cause erosion on the turbine components resulting in reduction of the plant capacity from 2.2 MW to 900 KW. To ensure sustainable solution to sediment issues in Keya HPP, an upstream sediment trap reservoir is proposed. It is recommended also that Rwanda Energy Group (REG) should work together with Rwanda Natural Resource Authority (RNRA) at national level to ensure sustainable development of erosion control in the Sebeya catchment area. 展开更多
关键词 keya HYDROPOWER PLANT SEDIMENT BASIN Evaluation Sebeya RIVER Rwanda
下载PDF
荒漠化治理综合效益评估——以柯柯牙工程为例
2
作者 荆蒙 李青 《绿洲农业科学与工程》 2023年第1期25-34,共10页
荒漠化治理是干旱、半干旱地区生态治理的重要内容。评估荒漠化治理工程的综合效益对沙区生态经济综合效益具有重要意义。本文以柯柯牙工程为例,结合生态学、经济学、土壤学等交叉学科的知识,梳理总结了柯柯牙工程的评估内容,分析了经... 荒漠化治理是干旱、半干旱地区生态治理的重要内容。评估荒漠化治理工程的综合效益对沙区生态经济综合效益具有重要意义。本文以柯柯牙工程为例,结合生态学、经济学、土壤学等交叉学科的知识,梳理总结了柯柯牙工程的评估内容,分析了经济效益、生态效益、社会效益适用的评估方法,构建了评估荒漠化治理工程综合效益的评价指标体系,对典型模式的荒漠化治理工程综合效益进行了评价。综合分析结果:(1)结合柯柯牙工程的修复技术和修复机理,构建了一套综合效益评估体系。其中经济效益包括取用材林效益、食用产品效益、节水效益和旅游观光效益;生态效益包括涵养水源效益、固碳释氧效益、净化环境效益、保育土壤效益、生物多样性效益、森林防护效益、林木生产营养物质效益和防风固沙效益;社会效益包括娱乐文化效益、人类身体健康效益和劳动力就业效益。(2)截至2020年,柯柯牙工程综合效益为1.14千亿元。经济效益198.97亿元、生态效益734.11亿元、社会效益205.81亿元,生态效益和社会效益均超过了经济效益。(3)柯柯牙工程综合效益中,保育土壤效益、林木生产营养物质效益、食用产品效益、劳动力就业效益占其83.53%,而森林防护效益、人类身体健康效益、防风固沙效益、生物多样性效益等占16.47%。 展开更多
关键词 荒漠化治理 柯柯牙工程 综合效益 评估体系 先进技术
下载PDF
本埠电子商务安全认证技术研究
3
作者 廖金祥 《计算机与网络》 2001年第11期29-30,共2页
本文对在本埠(大中城市)范围内的电子商务系统安全认证技术进行了探讨,指出了IC卡及IC卡微机在身份认证和数据加密中的作用,论述了本埠电子商务中数据加密方式及加密算法,给出了一个简单的电子商务流程图。
关键词 指纹数据 IC卡微机 密钥 keya 公钥 私钥 PGP RSA
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部