In this study, we perform a series of numerical calculations on two vessels in the time domain. One vessel maintains its position using an internal turret and catenary mooring lines, while the other is moored to the f...In this study, we perform a series of numerical calculations on two vessels in the time domain. One vessel maintains its position using an internal turret and catenary mooring lines, while the other is moored to the former vessel via an STS (ship-to-ship) mooring system. We obtain hydrodynamic forces using the HOBEM (higher-order boundary element method). Then, we determine their coefficients using the convolution function method in the time domain. We model the catenary mooring lines using the finite element method, and the STS mooring lines are treated as linear SPs (springs) with constraints. To optimize the STS system, we conduct parametric studies on STS mooring systems. Finally, we compare the motion and structural responses of the initial and modified configurations.展开更多
目前很多船龄较大的汽轮机推进式LNG运输船,由于与新型内燃机LNG运输船竞争处于劣势,被改造成FSRU(Floating Storage and Regasification Unit)运营。针对此类方案的电力改造,如果采用增加双燃料发电机及其附属设施,需要耗资约2亿元人...目前很多船龄较大的汽轮机推进式LNG运输船,由于与新型内燃机LNG运输船竞争处于劣势,被改造成FSRU(Floating Storage and Regasification Unit)运营。针对此类方案的电力改造,如果采用增加双燃料发电机及其附属设施,需要耗资约2亿元人民币。为了降低投入和运营费用,根据运营数据,通过论证和对比,设计采用主透平改造的发电方案,深入分析结果表明,采用主透平改造的发电方案优于新增双燃料发电机发电方案。展开更多
文摘In this study, we perform a series of numerical calculations on two vessels in the time domain. One vessel maintains its position using an internal turret and catenary mooring lines, while the other is moored to the former vessel via an STS (ship-to-ship) mooring system. We obtain hydrodynamic forces using the HOBEM (higher-order boundary element method). Then, we determine their coefficients using the convolution function method in the time domain. We model the catenary mooring lines using the finite element method, and the STS mooring lines are treated as linear SPs (springs) with constraints. To optimize the STS system, we conduct parametric studies on STS mooring systems. Finally, we compare the motion and structural responses of the initial and modified configurations.
文摘目前很多船龄较大的汽轮机推进式LNG运输船,由于与新型内燃机LNG运输船竞争处于劣势,被改造成FSRU(Floating Storage and Regasification Unit)运营。针对此类方案的电力改造,如果采用增加双燃料发电机及其附属设施,需要耗资约2亿元人民币。为了降低投入和运营费用,根据运营数据,通过论证和对比,设计采用主透平改造的发电方案,深入分析结果表明,采用主透平改造的发电方案优于新增双燃料发电机发电方案。