The Lancang-Mekong River in China, Laos, Thailand, Myanmar, Cambodia, and Vietnam is the soul and heart of mainland Southeast Asia. Over 60 million people depend on the river and its tributaries for food, transportati...The Lancang-Mekong River in China, Laos, Thailand, Myanmar, Cambodia, and Vietnam is the soul and heart of mainland Southeast Asia. Over 60 million people depend on the river and its tributaries for food, transportation, water, and other necessities of life. The river supports one of the world’s most diverse fisheries, second only to Brazil’s Amazon River. Lancang-Mekong and tributaries are already heavily dammed primarily in China, Laos, Thailand, and Cambodia, with many more dams planned or under construction. Dams can worsen the impact of periodic droughts in the Lancang-Mekong basin and block the river’s “pulse effect” that spreads water and nutrients needed for fishing and farming onto the floodplains and delta. The headwaters of the Lancang are in China and its waters are considered a national resource. China regards the Lancang, Yangtze and Yellow rivers as a free resource rather than a shared resource. The primary difference between these rivers is the Lancang flows from China into and through other countries and not directly into a sea or ocean. China and Myanmar have not joined the Mekong River Commission (MRC) as full members but have been Dialogue Partners since 1996. Over the past thirty years, China’s Lancang policies and actions have reflected its national resource interests. China has actively engaged with individual transboundary countries at various levels including environmental, conservation, and economic agreements. The primary objective of this study is to assess the environmental and human impacts of all Lancang-Mekong mainstem and tributary dams and the plans by many countries for more hydropower utilizing the potential of the river as the continent’s energy lifeline. Future dams need to include fish ladders and navigation locks to reduce the environmental impacts on fish populations, natural resources, navigation, and livelihoods. Strengthening of international collaboration via the MRC or by individual or multiple country agreements to address Lancang-Mekong’s sustainable transboundary development goals is recommended. When new Lancang-Mekong and tributary dams are built within any of the transboundary watershed countries, additional communities will need to be resettled. Significant environmental and human impacts are observed. Steps will have to be taken by all the concerned countries to prevent these problems and to ensure that people’s livelihoods are restored after resettlement.展开更多
The Lancang-Mekong River has attracted much attention from researchers, but the cooperation on water issues in this river basin has been limited, even after the establishment of the Mekong River Commission(MRC). Coope...The Lancang-Mekong River has attracted much attention from researchers, but the cooperation on water issues in this river basin has been limited, even after the establishment of the Mekong River Commission(MRC). Cooperation on water resources has been determined as one of the key priority areas in the Lancang-Mekong Cooperation Mechanism, but there are no details of targets. In order to establish the priorities of water cooperation under the mechanism, we adopted nine categories to classify the objectives of 87 water cooperation events based on the ‘Lancang-Mekong Water Cooperative Events Database' from 1995 to 2015. Based on the occurrence of cooperative events, cooperative objectives, cooperative scales, and approaches to cooperation, we conducted statistical, correlation, and text analyses. Our analyses indicated the following results: under the impact of economic conditions inside and outside the river basin, full cooperation appeared more difficult than bilateral and multilateral cooperation. Each of the partners adopted different preferences for cooperation targets. Cooperation with more definite objectives was easier to establish than cooperation with broader and more complex objectives. The potential objectives for water cooperation were navigation, hydropower, joint management, data sharing, flood control and water use. Because hydropower development is controversial, and because water cooperation is avoided by most existing regional cooperation mechanisms due to its complexity, we suggest the following priority areas for water cooperation in the Lancang-Mekong River Basin. 1) Navigation and flood control/drought relief are attractive objectives for all the riparian countries across the whole watershed. 2) Data sharing should be a priority for cooperation in the watershed due to its laying the foundation for the equitable and reasonable utilization of transboundary waters. 3) Hydropower is an objective best implemented mainly through bilateral cooperation, and on tributaries.展开更多
The Lancnag Mekong River is the most important international river across China and Southeast Asia, If it is developed according to 'Great Mekong Subregional Cooperation Plan' [9] prepared by ADB, the area di...The Lancnag Mekong River is the most important international river across China and Southeast Asia, If it is developed according to 'Great Mekong Subregional Cooperation Plan' [9] prepared by ADB, the area directly affected will be up to over 2.32 million km 2, the population over 220 million, and the natural environment, and socio-economic conditions within a large area will be greatly changed. 'Agreement on Cooperation for Sustainable Development of Mekong Basin' signed by the four riparian countries along the lower Mekong River on April 5, 1995 provides a new opportunity for sustainable development of the Basin. According to preliminary analysis, if the multipurpose utilization of the water resources is the target for carrying out integrated planning and management, and the efforts are made 1) to focus on energy exploitation on the Lancang River Mainstream and the tributaries of the lower Mekong River; 2) to build gated weirs at Tonle Sam; 3) to construct spillways at the Mekong Delta; 4) to facilitate flood dykes in big cities and on both banks of the mainstream which are concentrated with population and farmland and liable to be flooded, and 5) to strengthen networks for forecasting hydrological and meteorological conditions, then all problems such as power demand, irrigation, flood, salt water intrusion as well as acid water erosion to soil could be solved without constructing large cascaded stations and dams on the lower Mekong Mainstream. This will not only avoid input of great number of fund, large scale resettlement and land inundation, but also prevent aquatic organisms living in Mekong River from being injured due to dam construction, and promote the sustainable development of the Basin.展开更多
Satellite-based products with high spatial and temporal resolution provide useful precipitation information for data-sparse or ungauged large-scale watersheds. In the Lower Lancang-Mekong River Basin, rainfall station...Satellite-based products with high spatial and temporal resolution provide useful precipitation information for data-sparse or ungauged large-scale watersheds. In the Lower Lancang-Mekong River Basin, rainfall stations are sparse and unevenly distributed, and the transboundary characteristic makes the collection of precipitation data more difficult, which has restricted hydrological processes simulation. In this study, daily precipitation data from four datasets(gauge observations, inverse distance weighted(IDW) data, Tropical Rainfall Measuring Mission(TRMM) estimates, and Climate Hazards Group InfraRed Precipitation with Stations(CHIRPS) estimates), were applied to drive the Soil and Water Assessment Tool(SWAT) model, and then their capability for hydrological simulation in the Lower Lancang-Mekong River Basin were examined. TRMM and CHIRPS data showed good performances on precipitation estimation in the Lower Lancang-Mekong River Basin, with the better performance for TRMM product. The Nash-Sutcliffe efficiency(NSE) values of gauge, IDW, TRMM, and CHIRPS simulations during the calibration period were 0.87, 0.86, 0.95, and 0.93 for monthly flow, respectively, and those for daily flow were 0.75, 0.77, 0.86, and 0.84, respectively. TRMM and CHIRPS data were superior to rain gauge and IDW data for driving the hydrological model, and TRMM data produced the best simulation performance. Satellite-based precipitation estimates could be suitable data sources when simulating hydrological processes for large data-poor or ungauged watersheds, especially in international river basins for which precipitation observations are difficult to collect. CHIRPS data provide long precipitation time series from 1981 to near present and thus could be used as an alternative precipitation input for hydrological simulation, especially for the period without TRMM data. For satellite-based precipitation products, the differences in the occurrence frequencies and amounts of precipitation with different intensities would affect simulation results of water balance components, which should be comprehensively considered in water resources estimation and planning.展开更多
Camera calibration is critical in computer vision measurement system, affecting the accuracy of the whole system. Many camera calibration methods have been proposed, but they cannot consider precision and operation co...Camera calibration is critical in computer vision measurement system, affecting the accuracy of the whole system. Many camera calibration methods have been proposed, but they cannot consider precision and operation complexity at the same time. In this paper, a new technique is proposed to calibrate camera. Firstly, the global calibration method is described in de-tail. It requires the camera to observe a checkerboard pattern shown at a few different orientations. The checkerboard corners are obtained by Harris algorithm. With direct linear transformation and non-linear optimal algorithm, the global calibration pa-rameters are obtained. Then, a sub-regional method is proposed. Those corners are divided into two groups, middle corners and edge corners, which are used to calibrate the corresponding area to get two sets of calibration parameters. Finally, some experimental images are used to test the proposed method. Experimental results demonstrate that the average projection error of sub-region method is decreased at least 16% compared with the global calibration method. The proposed technique is simple and accurate. It is suitable for the industrial computer vision measurement.展开更多
Despite their economic potential, the Lancang-Mekong countries' performance in trade and investment facilitation is far from satisfactory. Enhancing the facilitation level is key to promoting the LMC to a deeper s...Despite their economic potential, the Lancang-Mekong countries' performance in trade and investment facilitation is far from satisfactory. Enhancing the facilitation level is key to promoting the LMC to a deeper stage, and relevant measures can serve to drive domestic reforms, increase competitiveness of sub-regional countries, and realize coordinated development.展开更多
The Indochina Peninsula is of special and important significance to China's geopolitical strategy,which is the foothold of China's strategy in Southeast Asia and even the whole Asia-Pacific region,as well as t...The Indochina Peninsula is of special and important significance to China's geopolitical strategy,which is the foothold of China's strategy in Southeast Asia and even the whole Asia-Pacific region,as well as the strategic springboard of*China s global development.In 2016,China led the establishment of the Lancang-Mekong Cooperation mechanism,and achieved remarkable results in terms of institutional development,project implementation and the construction of international relations among member states in the short term.The establishment and rapid development of the Lancang-Mekong Cooperation is based on member states,strong willingness to cooperate.It also benefits from the rational design of their institutional structures,geographical advantages,strong and complementary economies,and close sociocultural similarities.On the other hand,the further development of the Lancang?Mekong Cooperation is facing many risks and challenges as a result of the complexities of the internal environment of the Indochina Peninsula and the geopolitical competition of extraterritorial forces in the region.In this regard,China should make more efforts to improve relevant institutional arrangements for the Lancang-Mekong Cooperation,broaden the areas and enrich the content of cooperation,coordinate with extraterritorial forces and increase the number of stakeholders.展开更多
This study evaluated the trend of diarrheal diseases managed with zinc supplementation by comparing it with diarrheal diseases managed without zinc supplementation at the University of Port Harcourt Teaching hospital ...This study evaluated the trend of diarrheal diseases managed with zinc supplementation by comparing it with diarrheal diseases managed without zinc supplementation at the University of Port Harcourt Teaching hospital (UPTH), Nigeria. The study was a descriptive retrospective study done at the Diarrhea Training Unit (DTU) of UPTH to determine the effect of zinc supplementation in the management of diarrhea in children under 5 years. Out of the 134 case records studied, of children aged 0 to 59 months who presented with diarrhea at the DTU, 57 children did not receive zinc supplementation between October and December, 2007 and 77 children received zinc supplementation between October and December 2009. The results showed that (74) 96.1% of patients who received zinc supplementation, and (48) 84.2% of those who did not, had no repeat diarrheal episodes when seen at the follow up clinic. On the other hand, 1.3% of those who received zinc supplementation and 1.8% of those who did not, had increased episodes of diarrhea when seen at the follow up clinic. Of those who received, and those who did not receive zinc supplementation, 2.6% and 14% respectively, had reduced episodes of diarrhea. These findings clearly demonstrate the effectiveness of zinc supplementation in halting the course of diarrheal diseases in children aged 0 to 59 months. We therefore advocate for the use of zinc supplementation in the management of diarrhea in展开更多
The Lancang-Mekong Cooperation has become an important model for China and neighboring countries seeking to build a community of shared future with its remarkable achievements. Based on the solid foundation, the LMC n...The Lancang-Mekong Cooperation has become an important model for China and neighboring countries seeking to build a community of shared future with its remarkable achievements. Based on the solid foundation, the LMC needs to overcome several challenges to ensure strong and sustainable momentum.展开更多
The 2019 Yunnan Lancang-Mekong Cooperation Series and Lancang-Mekong Week were launched at Yunnan University on March 18.More than 200 representatives from Kunming-based foreign consulates,local governments,universiti...The 2019 Yunnan Lancang-Mekong Cooperation Series and Lancang-Mekong Week were launched at Yunnan University on March 18.More than 200 representatives from Kunming-based foreign consulates,local governments,universities and companies,including Lao consul general Khamphone Vongsanty,Myanmar consul general U Soe Paing,Cambodian consul general Lem Puthviro and Malaysian consul general Faizal Bin Shani,attended the launch ceremony.展开更多
Based on the sub-region generalized variationM principle, a sub-region mixed version of the newly-developed semi-analytical 'finite element method of lines' (FEMOL) is proposed in this paper for accurate and effic...Based on the sub-region generalized variationM principle, a sub-region mixed version of the newly-developed semi-analytical 'finite element method of lines' (FEMOL) is proposed in this paper for accurate and efficient computation of stress intensity factors (SIFs) of two-dimensional notches/cracks. The circular regions surrounding notch/crack tips are taken as the complementary energy region in which a number of leading terms of singular solutions for stresses are used, with the sought SIFs being among the unknown coefficients. The rest of the arbitrary domain is taken as the potential energy region in which FEMOL is applied to obtain approximate displacements. A mixed system of ordinary differential equations (ODEs) and algebraic equations is derived via the sub-region generalized variational principle. A singularity removal technique that eliminates the stress parameters from the mixed equation system eventually yields a standard FEMOL ODE system, the solution of which is no longer singular and is simply and efficiently obtained using a standard general-purpose ODE solver. A number of numerical examples, including bi-material notches/cracks in anti-plane and plane elasticity, are given to show the generally excellent performance of the proposed method.展开更多
As a result of the high economic growth in GMS (Greater Mekong Sub-region) countries, bank branches have now expanded at high rate. The expansion of new buildings, however, has not considered energy, especially ligh...As a result of the high economic growth in GMS (Greater Mekong Sub-region) countries, bank branches have now expanded at high rate. The expansion of new buildings, however, has not considered energy, especially lighting system, in the design stage. This paper presents the optimal energy management design of lighting system for the bank buildings in the countries along Mekong River, namely China, Vietnam, Cambodia, Myanmar, Laos and Thailand. The lighting system is considered in the study as most of the countries use T8 fluorescent luminaires. The LCC (life cycle cost) method has been considered for the installation and operational cost. The assumed benefit-cost ratio analysis comprises of the lifetime cycle, price of fluorescent lamps, electricity unit price, operating times and hours of lighting bulb. The T8 fluorescent luminaires with low watt loss ballast are compared with T5 fluorescent luminaires and LED lamps. Electricity rates and the cost of the investment are considered to determine the suitable selection of the lighting system in each GMS country.展开更多
文摘The Lancang-Mekong River in China, Laos, Thailand, Myanmar, Cambodia, and Vietnam is the soul and heart of mainland Southeast Asia. Over 60 million people depend on the river and its tributaries for food, transportation, water, and other necessities of life. The river supports one of the world’s most diverse fisheries, second only to Brazil’s Amazon River. Lancang-Mekong and tributaries are already heavily dammed primarily in China, Laos, Thailand, and Cambodia, with many more dams planned or under construction. Dams can worsen the impact of periodic droughts in the Lancang-Mekong basin and block the river’s “pulse effect” that spreads water and nutrients needed for fishing and farming onto the floodplains and delta. The headwaters of the Lancang are in China and its waters are considered a national resource. China regards the Lancang, Yangtze and Yellow rivers as a free resource rather than a shared resource. The primary difference between these rivers is the Lancang flows from China into and through other countries and not directly into a sea or ocean. China and Myanmar have not joined the Mekong River Commission (MRC) as full members but have been Dialogue Partners since 1996. Over the past thirty years, China’s Lancang policies and actions have reflected its national resource interests. China has actively engaged with individual transboundary countries at various levels including environmental, conservation, and economic agreements. The primary objective of this study is to assess the environmental and human impacts of all Lancang-Mekong mainstem and tributary dams and the plans by many countries for more hydropower utilizing the potential of the river as the continent’s energy lifeline. Future dams need to include fish ladders and navigation locks to reduce the environmental impacts on fish populations, natural resources, navigation, and livelihoods. Strengthening of international collaboration via the MRC or by individual or multiple country agreements to address Lancang-Mekong’s sustainable transboundary development goals is recommended. When new Lancang-Mekong and tributary dams are built within any of the transboundary watershed countries, additional communities will need to be resettled. Significant environmental and human impacts are observed. Steps will have to be taken by all the concerned countries to prevent these problems and to ensure that people’s livelihoods are restored after resettlement.
基金the National Key R&D Program of China(No.2016YFA0601601)Natural Science Foundation of China-International Center for Integrated Mountain Development(NSFC-ICIMOD)Joint Research Program(No.41661144044)
文摘The Lancang-Mekong River has attracted much attention from researchers, but the cooperation on water issues in this river basin has been limited, even after the establishment of the Mekong River Commission(MRC). Cooperation on water resources has been determined as one of the key priority areas in the Lancang-Mekong Cooperation Mechanism, but there are no details of targets. In order to establish the priorities of water cooperation under the mechanism, we adopted nine categories to classify the objectives of 87 water cooperation events based on the ‘Lancang-Mekong Water Cooperative Events Database' from 1995 to 2015. Based on the occurrence of cooperative events, cooperative objectives, cooperative scales, and approaches to cooperation, we conducted statistical, correlation, and text analyses. Our analyses indicated the following results: under the impact of economic conditions inside and outside the river basin, full cooperation appeared more difficult than bilateral and multilateral cooperation. Each of the partners adopted different preferences for cooperation targets. Cooperation with more definite objectives was easier to establish than cooperation with broader and more complex objectives. The potential objectives for water cooperation were navigation, hydropower, joint management, data sharing, flood control and water use. Because hydropower development is controversial, and because water cooperation is avoided by most existing regional cooperation mechanisms due to its complexity, we suggest the following priority areas for water cooperation in the Lancang-Mekong River Basin. 1) Navigation and flood control/drought relief are attractive objectives for all the riparian countries across the whole watershed. 2) Data sharing should be a priority for cooperation in the watershed due to its laying the foundation for the equitable and reasonable utilization of transboundary waters. 3) Hydropower is an objective best implemented mainly through bilateral cooperation, and on tributaries.
文摘The Lancnag Mekong River is the most important international river across China and Southeast Asia, If it is developed according to 'Great Mekong Subregional Cooperation Plan' [9] prepared by ADB, the area directly affected will be up to over 2.32 million km 2, the population over 220 million, and the natural environment, and socio-economic conditions within a large area will be greatly changed. 'Agreement on Cooperation for Sustainable Development of Mekong Basin' signed by the four riparian countries along the lower Mekong River on April 5, 1995 provides a new opportunity for sustainable development of the Basin. According to preliminary analysis, if the multipurpose utilization of the water resources is the target for carrying out integrated planning and management, and the efforts are made 1) to focus on energy exploitation on the Lancang River Mainstream and the tributaries of the lower Mekong River; 2) to build gated weirs at Tonle Sam; 3) to construct spillways at the Mekong Delta; 4) to facilitate flood dykes in big cities and on both banks of the mainstream which are concentrated with population and farmland and liable to be flooded, and 5) to strengthen networks for forecasting hydrological and meteorological conditions, then all problems such as power demand, irrigation, flood, salt water intrusion as well as acid water erosion to soil could be solved without constructing large cascaded stations and dams on the lower Mekong Mainstream. This will not only avoid input of great number of fund, large scale resettlement and land inundation, but also prevent aquatic organisms living in Mekong River from being injured due to dam construction, and promote the sustainable development of the Basin.
基金National Key R&D Program of China(No.2016YFA0601601)National Natural Science Foundation of China(No.41601026,41661099)Science and Technology Planning Project of Yunnan Province,China(No.2017FB073)
文摘Satellite-based products with high spatial and temporal resolution provide useful precipitation information for data-sparse or ungauged large-scale watersheds. In the Lower Lancang-Mekong River Basin, rainfall stations are sparse and unevenly distributed, and the transboundary characteristic makes the collection of precipitation data more difficult, which has restricted hydrological processes simulation. In this study, daily precipitation data from four datasets(gauge observations, inverse distance weighted(IDW) data, Tropical Rainfall Measuring Mission(TRMM) estimates, and Climate Hazards Group InfraRed Precipitation with Stations(CHIRPS) estimates), were applied to drive the Soil and Water Assessment Tool(SWAT) model, and then their capability for hydrological simulation in the Lower Lancang-Mekong River Basin were examined. TRMM and CHIRPS data showed good performances on precipitation estimation in the Lower Lancang-Mekong River Basin, with the better performance for TRMM product. The Nash-Sutcliffe efficiency(NSE) values of gauge, IDW, TRMM, and CHIRPS simulations during the calibration period were 0.87, 0.86, 0.95, and 0.93 for monthly flow, respectively, and those for daily flow were 0.75, 0.77, 0.86, and 0.84, respectively. TRMM and CHIRPS data were superior to rain gauge and IDW data for driving the hydrological model, and TRMM data produced the best simulation performance. Satellite-based precipitation estimates could be suitable data sources when simulating hydrological processes for large data-poor or ungauged watersheds, especially in international river basins for which precipitation observations are difficult to collect. CHIRPS data provide long precipitation time series from 1981 to near present and thus could be used as an alternative precipitation input for hydrological simulation, especially for the period without TRMM data. For satellite-based precipitation products, the differences in the occurrence frequencies and amounts of precipitation with different intensities would affect simulation results of water balance components, which should be comprehensively considered in water resources estimation and planning.
基金Tianjin Research Program of Application Foundation and Advanced Technology(No.14JCYBJC18600,No.14JCZDJC39700)the National Key Scientific Instrument and Equipment Development Project(No.2013YQ17053903)
文摘Camera calibration is critical in computer vision measurement system, affecting the accuracy of the whole system. Many camera calibration methods have been proposed, but they cannot consider precision and operation complexity at the same time. In this paper, a new technique is proposed to calibrate camera. Firstly, the global calibration method is described in de-tail. It requires the camera to observe a checkerboard pattern shown at a few different orientations. The checkerboard corners are obtained by Harris algorithm. With direct linear transformation and non-linear optimal algorithm, the global calibration pa-rameters are obtained. Then, a sub-regional method is proposed. Those corners are divided into two groups, middle corners and edge corners, which are used to calibrate the corresponding area to get two sets of calibration parameters. Finally, some experimental images are used to test the proposed method. Experimental results demonstrate that the average projection error of sub-region method is decreased at least 16% compared with the global calibration method. The proposed technique is simple and accurate. It is suitable for the industrial computer vision measurement.
文摘Despite their economic potential, the Lancang-Mekong countries' performance in trade and investment facilitation is far from satisfactory. Enhancing the facilitation level is key to promoting the LMC to a deeper stage, and relevant measures can serve to drive domestic reforms, increase competitiveness of sub-regional countries, and realize coordinated development.
基金a major research project funded by the National Social Science Foundation,titled “Research on the Construction of the Belt and Road Initiative and Neighboring Diplomacy”(Project No.2017010186)
文摘The Indochina Peninsula is of special and important significance to China's geopolitical strategy,which is the foothold of China's strategy in Southeast Asia and even the whole Asia-Pacific region,as well as the strategic springboard of*China s global development.In 2016,China led the establishment of the Lancang-Mekong Cooperation mechanism,and achieved remarkable results in terms of institutional development,project implementation and the construction of international relations among member states in the short term.The establishment and rapid development of the Lancang-Mekong Cooperation is based on member states,strong willingness to cooperate.It also benefits from the rational design of their institutional structures,geographical advantages,strong and complementary economies,and close sociocultural similarities.On the other hand,the further development of the Lancang?Mekong Cooperation is facing many risks and challenges as a result of the complexities of the internal environment of the Indochina Peninsula and the geopolitical competition of extraterritorial forces in the region.In this regard,China should make more efforts to improve relevant institutional arrangements for the Lancang-Mekong Cooperation,broaden the areas and enrich the content of cooperation,coordinate with extraterritorial forces and increase the number of stakeholders.
文摘This study evaluated the trend of diarrheal diseases managed with zinc supplementation by comparing it with diarrheal diseases managed without zinc supplementation at the University of Port Harcourt Teaching hospital (UPTH), Nigeria. The study was a descriptive retrospective study done at the Diarrhea Training Unit (DTU) of UPTH to determine the effect of zinc supplementation in the management of diarrhea in children under 5 years. Out of the 134 case records studied, of children aged 0 to 59 months who presented with diarrhea at the DTU, 57 children did not receive zinc supplementation between October and December, 2007 and 77 children received zinc supplementation between October and December 2009. The results showed that (74) 96.1% of patients who received zinc supplementation, and (48) 84.2% of those who did not, had no repeat diarrheal episodes when seen at the follow up clinic. On the other hand, 1.3% of those who received zinc supplementation and 1.8% of those who did not, had increased episodes of diarrhea when seen at the follow up clinic. Of those who received, and those who did not receive zinc supplementation, 2.6% and 14% respectively, had reduced episodes of diarrhea. These findings clearly demonstrate the effectiveness of zinc supplementation in halting the course of diarrheal diseases in children aged 0 to 59 months. We therefore advocate for the use of zinc supplementation in the management of diarrhea in
文摘The Lancang-Mekong Cooperation has become an important model for China and neighboring countries seeking to build a community of shared future with its remarkable achievements. Based on the solid foundation, the LMC needs to overcome several challenges to ensure strong and sustainable momentum.
文摘The 2019 Yunnan Lancang-Mekong Cooperation Series and Lancang-Mekong Week were launched at Yunnan University on March 18.More than 200 representatives from Kunming-based foreign consulates,local governments,universities and companies,including Lao consul general Khamphone Vongsanty,Myanmar consul general U Soe Paing,Cambodian consul general Lem Puthviro and Malaysian consul general Faizal Bin Shani,attended the launch ceremony.
基金Project supported by the National Natural Sciences Foundation of China(Nos.59525813 and 19872066)the Cardiff Advanced Chinese Engineering Centre of Cardiff University.
文摘Based on the sub-region generalized variationM principle, a sub-region mixed version of the newly-developed semi-analytical 'finite element method of lines' (FEMOL) is proposed in this paper for accurate and efficient computation of stress intensity factors (SIFs) of two-dimensional notches/cracks. The circular regions surrounding notch/crack tips are taken as the complementary energy region in which a number of leading terms of singular solutions for stresses are used, with the sought SIFs being among the unknown coefficients. The rest of the arbitrary domain is taken as the potential energy region in which FEMOL is applied to obtain approximate displacements. A mixed system of ordinary differential equations (ODEs) and algebraic equations is derived via the sub-region generalized variational principle. A singularity removal technique that eliminates the stress parameters from the mixed equation system eventually yields a standard FEMOL ODE system, the solution of which is no longer singular and is simply and efficiently obtained using a standard general-purpose ODE solver. A number of numerical examples, including bi-material notches/cracks in anti-plane and plane elasticity, are given to show the generally excellent performance of the proposed method.
文摘As a result of the high economic growth in GMS (Greater Mekong Sub-region) countries, bank branches have now expanded at high rate. The expansion of new buildings, however, has not considered energy, especially lighting system, in the design stage. This paper presents the optimal energy management design of lighting system for the bank buildings in the countries along Mekong River, namely China, Vietnam, Cambodia, Myanmar, Laos and Thailand. The lighting system is considered in the study as most of the countries use T8 fluorescent luminaires. The LCC (life cycle cost) method has been considered for the installation and operational cost. The assumed benefit-cost ratio analysis comprises of the lifetime cycle, price of fluorescent lamps, electricity unit price, operating times and hours of lighting bulb. The T8 fluorescent luminaires with low watt loss ballast are compared with T5 fluorescent luminaires and LED lamps. Electricity rates and the cost of the investment are considered to determine the suitable selection of the lighting system in each GMS country.