期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
RandWPSO-LSSVM optimization feedback method for large underground cavern and its engineering applications 被引量:2
1
作者 聂卫平 徐卫亚 刘兴宁 《Journal of Central South University》 SCIE EI CAS 2012年第8期2354-2364,共11页
According to the characteristics of large underground caverns, by using the safety factor of surrounding rock mass point as the control standard of cavern stability, RandWPSO-LSSVM optimization feedback method and flo... According to the characteristics of large underground caverns, by using the safety factor of surrounding rock mass point as the control standard of cavern stability, RandWPSO-LSSVM optimization feedback method and flow process of large underground cavern anchor parameters were established. By applying the optimization feedback method to actual project, the best anchor parameters of large surge shaft five-tunnel area underground cavern of the Nuozhadu hydropower station were obtained through optimization. The results show that the predicted effect of LSSVM prediction model obtained through RandWPSO optimization is good, reasonable and reliable. Combination of the best anchor parameters obtained is 114131312, that is, the locked anchor bar spacing is 1 m x 1 m, pre-stress is 100 kN, elevation 580.45-586.50 m section anchor bar diameter is 36.00 mm, length is 4.50 m, spacing is 1.5 m × 2.5 m; anchor bar diameter at the five-tunnel area side wall is 25.00 mm, length is 7.50 m, spacing is 1 m× 1.5 m, and the shotcrete thickness is 0.15 m. The feedback analyses show that the optimization feedback method of large underground cavern anchor parameters is reasonable and reliable, which has important guiding significance for ensuring the stability of large underground caverns and for saving project investment. 展开更多
关键词 random weight particle swarm optimization least squares support vector machine large undergrotmd cavern anchor oarameters optimization feedback rock-ooint safety factor
下载PDF
Measures for controlling large deformations of underground caverns under high in-situ stress condition--A case study of JinpingⅠhydropower station 被引量:11
2
作者 Shengwu Song Xuemin Feng +3 位作者 Chenggang Liao Dewen Cai Zhongxu Liu Yunhao Yang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2016年第5期605-618,共14页
The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the ... The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the right bank with extremely high in-situ stress and a few discontinuities observed in surrounding rock masses. The problems of rock mass deformation and failure result in considerable challenges related to project design and construction and have raised a wide range of concerns in the fields of rock mechanics and engineering. During the excavation of underground caverns, high in-situ stress and relatively low rock mass strength in combination with large excavation dimensions lead to large deformation of the surrounding rock mass and support. Existing experiences in excavation and support cannot deal with the large deformation of rock mass effectively, and further studies are needed. In this paper, the geological conditions, layout of caverns, and design of excavation and support are first introduced, and then detailed analyses of deformation and failure characteristics of rocks are presented. Based on this, the mechanisms of deformation and failure are discussed, and the support adjustments for controlling rock large deformation and subsequent excavation procedures are proposed. Finally, the effectiveness of support and excavation adjustments to maintain the stability of the rock mass is verified. The measures for controlling the large deformation of surrounding rocks enrich the practical experiences related to the design and construction of large underground openings, and the construction of caverns in the Jinping I hydropower station provides a good case study of large-scale excavation in highly stressed ground with complex geological structures, as well as a reference case for research on rock mechanics. 展开更多
关键词 large-scale underground caverns High in-situ stress large deformationDeformation controlling technologies Jinping I hydropower station
下载PDF
Design of cavern blasting based on controllable parameters 被引量:2
3
作者 王树理 王树仁 朱建明 《Journal of Coal Science & Engineering(China)》 2008年第2期235-238,共4页
After a thorough review of some controllable parameters,which included field investigations,cavern dimensions,explosive,rock strength etc.,cut,contour,lifters and stoping holes were introduced for blasting cavern of n... After a thorough review of some controllable parameters,which included field investigations,cavern dimensions,explosive,rock strength etc.,cut,contour,lifters and stoping holes were introduced for blasting cavern of nucleus submarine.These design were conducted using a U.Langefors and B.Kihlstrom theory. 展开更多
关键词 controllable parameters large cross-section cavern cavern blasting design
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部