期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
The influence of inter-band rock on rib spalling in longwall panel with large mining height
1
作者 Jiachen Wang Meng Li +3 位作者 Zhaohui Wang Zheng Li Han Zhang Shixiong Song 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2024年第4期427-442,共16页
In order to improve rib stability,failure criteria and instability mode of a thick coal seam with inter-band rock layer are analysed in this study.A three-dimensional mechanical model is established for the rib by con... In order to improve rib stability,failure criteria and instability mode of a thick coal seam with inter-band rock layer are analysed in this study.A three-dimensional mechanical model is established for the rib by considering the rock layer.A safety factor is defined foy the rib,and it is observed that the safety factor exhibits a positive correlation with the thickness and strength of the inter-band rock.A calculation method for determining critical parameters of the rock layer is presented to ensure the rib stability.It is revealed that incomplete propagation of the fracture at the hard rock constitutes a fundamental prerequisite for ensuring the rib stability.The influence of the position of the inter-band rock in the coal seam on failure mechanism of the rib was thoroughly investigated by developing a series of physical models for the rib at the face area.The best position for the inter-band rock in the coal seam is at a height of 1.5 m away from the roof line,which tends to provide a good stability state for the rib.For different inter-band rock positions,two ways of controlling rib by increasing supports stiffness and flexible grouting reinforcement are proposed. 展开更多
关键词 Rib spalling Inter-band rock large mining height Limit analysis Physical model experiment Numerical simulation
下载PDF
Development and prospect on fully mechanized mining in Chinese coal mines 被引量:103
2
作者 Jinhua Wang 《International Journal of Coal Science & Technology》 EI CAS 2014年第3期253-260,共8页
Fully mechanized mining(FMM)technology has been applied in Chinese coal mines for more than 40 years.At present,the output of a FMM face has reached 10-million tons with Chinese-made equipment.In this study,the new de... Fully mechanized mining(FMM)technology has been applied in Chinese coal mines for more than 40 years.At present,the output of a FMM face has reached 10-million tons with Chinese-made equipment.In this study,the new developments in FMM technology and equipment in Chinese coal mines during past decades are introduced.The automatic FMM technology for thin seams,complete sets of FMM technology with ultra large shear height of 7 m for thick seams,complete sets of fully mechanized top coal caving technology with large shear height for ultra-thick seams of 20 m,complete sets of FMM technology for complex and difficult seams,including steeply inclined seams,soft coal seams with large inclination angle,and the mechanized filling mining technology and equipment are presented.Some typical case studies are also introduced.Finally,the existing problems with the FMM technology are discussed,and prospect of FMM technology and equipment applied in Chinese coal mines is put forward. 展开更多
关键词 Fully mechanized mining mining with large shear height Fully mechanized top coal caving Steeply inclined seam Back filling mining PROSPECT
下载PDF
Demonstration Project of Safe and Efficient Mining Operations in Extra-thick Coal Seam 被引量:1
3
作者 Jin-hui Wang 《Frontiers of Engineering Management》 2016年第3期264-274,297,共12页
Mineable coal reserves in thick and extra-thick seams account for 44% of the total deposit in China. Fullymechanized top-coal caving technology is a new mining method of safe and efficient underground operations in ex... Mineable coal reserves in thick and extra-thick seams account for 44% of the total deposit in China. Fullymechanized top-coal caving technology is a new mining method of safe and efficient underground operations in extra-thick seams in China. The development of fullymechanized top-coal caving technology in China, which was successfully applied in Face 8105 in Tashan Coal Mine, Datong, Shanxi, China, is analyzed in this paper.Studies on movement pattern of top-coal and roof from fully-mechanized top caving face in 14–20 m extra-thick seams have been carried out. A series of key technologies were successfully developed, including strata control technology, equipment for high-efficient and high-recovery top caving operations, and safety guarantee technology for low gas occurrence and high gas emission. As a result, the fully-mechanized top-coal caving Face 8105, with large mining height in Tashan Coal Mine, has achieved a recovery rate of 88.9% and an average equipment operation rate of 92.1%. With coal production of 10.84 Mt in 2011,the demonstration project is a technology and equipment breakthrough for fully-mechanized top-coal caving face in extra-thick coal seams with large mining height. 展开更多
关键词 demonstration project extra-thick coal seam large mining height fully-mechanized top-coal caving recovery rate strata control safety guarantee
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部