Discussion on Project Management Mode and Power Engineering Management
1
作者 Shuai Ma 《Journal of World Architecture》 2019年第6期29-32,共4页
In view of the current development of power engineering management,traditional management methods can no longer be applied to the management of current power engineering work.Therefore,it is necessary to innovate and ... In view of the current development of power engineering management,traditional management methods can no longer be applied to the management of current power engineering work.Therefore,it is necessary to innovate and optimize existing project management modes,transform traditional management concepts and models,focus on addressing the problems in project management and improve management.This paper mainly analyzes the project management mode and power engineering management. 展开更多
关键词 project management MODE Power engineering management PROBLEMS COUNTERMEASURES
下载PDF
Financial Calculation Problems and Countermeasure Analysis of Large-Scale Engineering Construction Projects
2
作者 Qiong Hou 《Proceedings of Business and Economic Studies》 2024年第2期15-21,共7页
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s... The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes. 展开更多
关键词 large-scale engineering construction projects Financial calculation Fund management
下载PDF
Construction Safety Management of Mechanical and Electrical Installation Projects
3
作者 Honglou Chi 《Journal of Architectural Research and Development》 2024年第2期50-54,共5页
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp... Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely. 展开更多
关键词 Construction safety Mechanical and electrical installation Installation engineering engineering projects Safety management
下载PDF
Research on Intelligent Cost Estimation of Engineering Foundation Projects Based on CSIs Theory
4
作者 Jie Di Wenhao Xing +2 位作者 Meng Wu Dan Zhang Jiashuo Zhao 《Journal of World Architecture》 2024年第5期29-35,共7页
Against the backdrop of rapid development in China’s construction and infrastructure sectors,discrepancies between project budgets and actual costs have become pronounced,manifesting in project overruns and suspensio... Against the backdrop of rapid development in China’s construction and infrastructure sectors,discrepancies between project budgets and actual costs have become pronounced,manifesting in project overruns and suspensions,posing significant challenges.To address inaccuracies in investment targets and operational complexities,this study focuses on a beam-bridge construction project in a district of Shijiazhuang city as a case study.Drawing upon historical analogs,the project employs a Work Breakdown Structure(WBS)to decompose the engineering works.Building on theories of Cost Significant(CS)and Whole Life Costing(WLC),the study constructs Cost Significant Items(CSIs)and develops a CNN-BiLSTM-Attention neural network for nonlinear prediction.By identifying significant cost drivers in engineering projects,this paper presents a streamlined cost estimation method that significantly reduces computational burdens,simplifies data collection processes,and optimizes data analysis and forecasting,thereby enhancing prediction accuracy.Finally,validation with real-world cost fluctuation data demonstrates minor errors,meeting predictive requirements across project execution phases. 展开更多
关键词 project management Cost Significant Items(CSIs) engineering costing Intelligent estimation
下载PDF
A Review on the Role of Risk Management (RM) and Value Engineering (VE) Tools for Project Successful Delivery 被引量:1
5
作者 Elysé Masengesho Ji Wei +1 位作者 Nadine Umubyeyi Rosette Niyirora 《World Journal of Engineering and Technology》 2021年第1期109-127,共19页
Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its gre... Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its great contributions to the national gross domestic product (GDP) of the country. Concerning construction processes, both risk management (RM) and value engineering (VE) techniques have commonalities from the beginning up to the completion of the project due to enhancing the project value/quality, meeting the project deadline, and reducing overall project cost. VE includes resolving the uncertainty of project objectives and ensuring that the project is delivered in a value for money way. The key point of RM is to solve the uncertainty of the project itself and its results to ensure that the specifications are achieved within the prescribed time, cost, and quality constraints. This review work is comparatively and collectively focus</span><span style="font-family:Verdana;">ed</span><span style="font-family:Verdana;"> on assessing the role of RM and VE tools for project successful delivery. It studies the points of difference and common features of the two aspects in terms of construction project delivery. So, this study concluded that in construction RM tool cannot be the chief aim of the all parties involved in the project execution because sometimes it produces itself negative results and reduces project management success. Therefore, RM needs a strong combination with VE due to the dependence of the target in identifying and assessing risks by considering the highest performance and lowest cost. The integration of RM and VE combination in a single study would avoid duplication of work and deliver better value for money thereby leading to better project outcomes. 展开更多
关键词 managing projects Risk management Value engineering Proper project Delivery
下载PDF
SDWAN (Software Defined-WAN) Network Engineering and Project Management 被引量:1
6
作者 Anshuman Awasthi 《Semiconductor Science and Information Devices》 2020年第1期17-28,共12页
Many organizations are struggling to provide high bandwidth and reliable internet connectivity at their branch offices and business locations and getting the most out of their operational expense.The need for internet... Many organizations are struggling to provide high bandwidth and reliable internet connectivity at their branch offices and business locations and getting the most out of their operational expense.The need for internet connectivity at any branch offices and business locations is not a luxury anymore but is a necessity.Let us try to understand how to plan and document the SDWAN(Software Defined-Wide Area Network)implementation in an organization.We will try to understand why it is essential to implement the new technology instead of investing in the existing MPLS(Multi-Protocol label switching)by taking an example of a retail organization.Methods:This project/research was performed using the abilities of Software Defined Network Technology and options available in MPLS(Multi-Protocol Label Switching).The Technical Project management principles were adopted as per PMI(Project Management Institute)waterfall methodology.Results/Conclusion:SDWAN technology provides an effective replacement of MPLS network connection for providing WAN connectivity for our office locations.It is essential to follow a documented process for appropriate vendor selection based on the available features and other listed attributes in the article.To be successful in the implementation it is essential to perform a POC(Proof of Concept)in a controlled environment and validate results.SDWAN provides better network performance and improves reliability as the links operate in active-active function. 展开更多
关键词 Network engineering SDWAN implementation ROI analysis Technical project management MPLS replacement
下载PDF
Application of Three-Dimensional Visualization Technology in Project Management of Offshore Platform Engineering Construction
7
作者 Jianyuan Yang Songlin Xia +2 位作者 Jie Shang Shaofang Li Zhongde Zhang 《Engineering(科研)》 2019年第11期727-734,共8页
Three-dimensional visualization technology converts engineering design drawings and data into graphics or images, realizes virtual reality perception of simulated users in future construction scene, enhances the inter... Three-dimensional visualization technology converts engineering design drawings and data into graphics or images, realizes virtual reality perception of simulated users in future construction scene, enhances the interaction between project management and technical personnel and engineering construction achievement, and provides intuitive, flexible and strong realistic experience for project management. It can effectively improve the level of project communication, and assist the needs of project construction planning management, training, exhibition, etc. As a tool to help improve project management skills, it has good application effect and prospects. 展开更多
关键词 THREE-DIMENSIONAL VISUALIZATION VIRTUAL REALITY engineering Construction project management
下载PDF
Research on Innovation of Engineering Project Management Mode and Intelligent Management
8
作者 Xianming Wang 《Frontiers Research of Architecture and Engineering》 2020年第2期18-22,共5页
In order to realize the standardization and normalization of environmental protection project management.This paper uses the literature method to study the current status of the existing project management mode,and po... In order to realize the standardization and normalization of environmental protection project management.This paper uses the literature method to study the current status of the existing project management mode,and points out the problems:lack of a sound project management system,insufficient information application of project management,and unclear decentralization in project management;on this basis,this paper proposes optimization strategies from the aspects of perfecting the engineering project management system,clarifying the allocation of project management authority,and strengthening the construction of engineering project management information.And put forward the future development trend of project engineering management,on the basis of two mainstream management modes of BOT(Build-Operate-Transfer)and EPC(Engineering Procurement Construction),build a standardized project management platform to achieve intelligent management.Realize intelligent management of engineering project management to achieve standardization and standardization,greatly improving the efficiency of project management. 展开更多
关键词 Environmental protection engineering project management management mode Intelligent management
下载PDF
Frontiers of Engineering Management Volume 2 2015 Total Contents
9
《Frontiers of Engineering Management》 2015年第4期395-397,共3页
关键词 WANG project Li ORGANIZATION INNOVATION Frontiers of engineering management Volume 2 2015 Total Contents CHEN
原文传递
Intelligent data analytics is here to change engineering management 被引量:1
10
作者 Jonathan Jingsheng SHI Saixing ZENG Xiaohua MENG 《Frontiers of Engineering Management》 2017年第1期41-48,共8页
A great deal of scientific research in the world aims at discovering the facts about the world so that we understand it better and find solutions to problems. Data enabling technology plays an important role in modern... A great deal of scientific research in the world aims at discovering the facts about the world so that we understand it better and find solutions to problems. Data enabling technology plays an important role in modern scientific discovery and technologic advancement. The importance of good information was long recognized by prominent leaders such as Sun Tzu and Napoleon. Factual data enables managers to measure, to understand their businesses, and to directly translate that knowledge into improved decision making and performance. This position paper argues that data analytics is ready to change engineering management in the following areas: 1) by making relevant historical data available to the manager at the time when it's needed; 2) by filtering out actionable intelligence from the ocean of data; and 3) by integrating useful data from multiple sources to support quantitative decision-making. Considering the unique need for engineering management, the paper proposes researchable topics in the two broad areas of data acquisition and data analytics. The purpose of the paper is to provoke discussion from peers and to encourage research activity. 展开更多
关键词 engineering management project management big data data analytics PLANNING EXECUTION
原文传递
Practice and experience of engineering culture development in the Sutong Bridge project
11
作者 Yu Chunsheng Yao Bei Wang Qian 《Engineering Sciences》 EI 2009年第1期87-92,共6页
To keep up with the time,culture is integrated to large-scale construction project management in China,which will absolutely add more vitality into construction project management in our country.Engineering culture is... To keep up with the time,culture is integrated to large-scale construction project management in China,which will absolutely add more vitality into construction project management in our country.Engineering culture is an integration of project construction and engineering culture.However,engineering culture development enjoys its own particularity as a project is constructed once only within a limited period of time.This paper gives affirmative opinion that engineering culture development in large-scale projects backs project management on the basis of thorough investigation of engineering culture development in Sutong Bridge Project and after deepened analysis,proposes new thinking pattern of engineering culture development in large-scale projects in a systematic manner,including thorough understanding of the essence of engineering culture,principle and contents of engineering culture development as well as efficient method in respect of establishment and implementation of engineering culture,and therefore provides a standard reference and systematic thinking pattern for engineering culture development in future large-scale projects. 展开更多
关键词 large-scale projects engineering culture engineering culture development systematic thinking pattern
下载PDF
Research on Risk Evaluation Method for International Engineering Projects 被引量:1
12
作者 HUANG Yi LI Sui-ke 《International Journal of Plant Engineering and Management》 2013年第3期140-145,共6页
Risk evaluation is one of the important elements of international engineering project management. The risk factors of international engineering projects are systematically analyzed from multiple dimension features of ... Risk evaluation is one of the important elements of international engineering project management. The risk factors of international engineering projects are systematically analyzed from multiple dimension features of the projects. The muhilayer evaluation index system for the international engineering project risk assessment is proposed and constructed, which consists of 8 I-grade indexes and 24 II-grade indexes as policy risk, market risk, resource risk, and technical scheme risk, schedule risk, funding risk, personnel risk and management risk. And then the self-evaluation and benchmarking evaluation methods are applied to evaluate the international engineering project risk, and established the corresponding mathematical models. Finally, a project evaluation example is given to illustrate the applicability and effectiveness of the mathematical models. 展开更多
关键词 international engineering project risk analysis risk evaluation risk management
下载PDF
Enterprise Process Modeling Methodology and Environment Supporting Project Management
13
作者 许红霞 张莉 周伯生 《Journal of Shanghai University(English Edition)》 CAS 2005年第6期493-500,共8页
Development of the global economy makes modem enterprises confront challenges of efficient managements for large projects and complex processes. Projects are typically managed in rather special manners. On the contrar... Development of the global economy makes modem enterprises confront challenges of efficient managements for large projects and complex processes. Projects are typically managed in rather special manners. On the contrary, there exist many methodologies for product process management to achieve consistency and continuance. However, processes often lack flexibility offered by projects. This paper dis~ the relationship of conceptual characteristics between process and project, gives low-level details to tackle the difference between them, and proposes an enterprise process modeling method for project management. An integrated environment is designed to support the method from which both project management and process management can receive benefits and conform to the limitations. 展开更多
关键词 process engineering process modeling project management supporting environment INTEGRATION
下载PDF
The Design and Improvement of a Software Project Management System Based on CMMI
14
作者 Guoping Zhou Weimin Shao 《Intelligent Information Management》 2012年第6期330-337,共8页
The paper researched and analyzed the characteristics, deficiencies and reasons of a management system of a software enterprise project to design a software project management system based on CMMI 1.2, thus helping th... The paper researched and analyzed the characteristics, deficiencies and reasons of a management system of a software enterprise project to design a software project management system based on CMMI 1.2, thus helping the enterprise to improve development and management efficiency of software project and reduce the risks and costs on project devel- opment. It studied CMMI model version 1.3 which is recently released by SEI, analyzed its characteristics and told the difference between version 1.2 and version 1.3. In addition, an improvement proposal and a solution of the software project management system were given from multiple perspectives. 展开更多
关键词 CMMI KPAs of CMMI LEVEL 3 SOFTWARE engineering project management
下载PDF
A Comparative Study of Managing a Project Using Traditional Management Techniques and a Critical Chain Project Management Methodology in Aircraft Maintenance Field
15
作者 Devinder Kumar Yadav Anand Kulkarni Hui Yao 《Journal of Transportation Technologies》 2022年第4期544-558,共15页
Aircraft on ground or down-time for its maintenance is a clear loss in revenue for an airline operation. With never ending competition and growing operating costs of aircraft, airlines continuously need to explore opp... Aircraft on ground or down-time for its maintenance is a clear loss in revenue for an airline operation. With never ending competition and growing operating costs of aircraft, airlines continuously need to explore opportunities to reduce the aircraft down-time in order to remain sustainable. Due to round the clock operation feature of scheduled airlines, aircraft maintenance operations are generally carried out using traditional management methodologies instead of considering it as a project. Though aircraft heavy maintenance checks consist of several major tasks that can last from few weeks to a year, the maintenance organisations do not adopt modern project management methodologies. Therefore, this paper models a heavy maintenance check of an Airbus aircraft as a typical project and adopts contemporary project management methodology to explore the possibility of reducing the downtime. To this end, a case study has been done at an aircraft maintenance company to analyse the potential of this project management method in aircraft maintenance industry. 展开更多
关键词 AVIATION AIRLINE Aircraft engineering management Maintenance Operations Planning project
下载PDF
Summary of Application of Fuzzy Mathematics in Construction Project Management
16
作者 Dongyou Tong Yueming Wang 《World Journal of Engineering and Technology》 2021年第3期407-422,共16页
Construction project management is an important aspect of civil engineering construction. How to use scientific and efficient methods to effectively man</span><span style="font-family:Verdana;">a... Construction project management is an important aspect of civil engineering construction. How to use scientific and efficient methods to effectively man</span><span style="font-family:Verdana;">age construction projects is the focus of construction project development un</span><span style="font-family:Verdana;">der the current situation. This article discusses the application of fuzzy mathematics in construction project management. The study found that in the process of construction project management, it was found that a single fuzzy </span><span style="font-family:Verdana;">mathematical method was difficult to adapt to the current complex and cha</span><span style="font-family:Verdana;">ngeable construction projects. Combining fuzzy mathematics with other man</span><span style="font-family:Verdana;">agement methods and computer applications can better simplify complex</span><span style="font-family:Verdana;"> things, reduce human subjectivity, increase calculation speed, and achieve a combination of qualitative and quantitative research;selection of optimization schemes and risk assessment, etc. All have a good effect, and can better </span><span style="font-family:Verdana;">deal with possible or uncertain things and emergencies in the process of pr</span><span style="font-family:Verdana;">oject management. At the same time, combining fuzzy mathematics with heuristic algorithms or meta-heuristic algorithms can make research more objective, improve management efficiency and calculation speed. 展开更多
关键词 Fuzzy Mathematics project management Civil engineering
下载PDF
Thinking substation construction project management methods
17
作者 HU Wenmin 《International English Education Research》 2015年第10期21-23,共3页
One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e... One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control. 展开更多
关键词 SUBSTATIONS construction project management cost control BIDDING civil engineering
下载PDF
Application of Earned Value Method in Project Cost Management and Schedule Management
18
作者 Wenjing Xu 《Proceedings of Business and Economic Studies》 2021年第4期146-152,共7页
At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role... At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role and value in improving the ability of project management.Earned value method,which is an important way in the field of project management,enables whole project management to rise to a new height.The specific principle of earned value method will be elaborated by fully introducing the specific role of earned value method in engineering projects to provide a reference and basis for practitioners to improve their management ability. 展开更多
关键词 Earned value method engineering project Cost management
下载PDF
Study on Ways to Improve Economic Benefits by Strengthening Cost Management
19
作者 Zhu Hongchang 《China's Foreign Trade》 2011年第7期68-70,共3页
Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. T... Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget. 展开更多
关键词 cost management engineering project management cost control risk control ways tocontrol
下载PDF
Validation of a Value Management Approach Developed for the Saudi Public Sector
20
作者 Mohammed Auda S Alalshikh 《Journal of Civil Engineering and Architecture》 2014年第2期197-206,共10页
A VM (value management) approach was developed that better suits the culture and the context of the SPS (Saudi Public Sector). This approach provided a comprehensive assessment of VM at institutional, organization... A VM (value management) approach was developed that better suits the culture and the context of the SPS (Saudi Public Sector). This approach provided a comprehensive assessment of VM at institutional, organizational and project levels. This paper illustrates the procedures that were used to validate the developed VM approach. For the institutional and organizational levels, the VM approach was validated by conducting telephone interviews with three experts from three organizations that use VM and with two senior managers from the MOF (Ministry of Finance). Mainly, it was found that the MOF should be supported by experts to set up a centre of excellence that can set VM policy, guidelines and standards for the promotion of VM in the SPS, in order to ensure achieving value for money spent in SPS projects. The developed VM approach, as it would be applied at the project level, was presented to 11 experts, all of whom completed a validation questionnaire and presented their comments. Subsequently, the questionnaires were analyzed and the VM approach was amended to reflect the inputs provided by these experts. It was concluded that VM should be applied at least twice on SPS projects. Firstly, it is to review and structure strategic and project briefs to sort out soft issues, and secondly, it is to optimize project designs and sort out hard issues. 展开更多
关键词 Value management value engineering project management Saudi public sector Saudi Arabia.
下载PDF