The specialized equipment utilized in long-line tunnel engineering is evolving towards large-scale,multifunctional,and complex orientations.The vibration caused by the high-frequency units during regular operation is ...The specialized equipment utilized in long-line tunnel engineering is evolving towards large-scale,multifunctional,and complex orientations.The vibration caused by the high-frequency units during regular operation is supported by the foundation of the units,and the magnitude of vibration and the operating frequency fluctuate in different engineering contexts,leading to variations in the dynamic response of the foundation.The high-frequency units yield significantly diverse outcomes under different startup conditions and times,resulting in failure to meet operational requirements,influencing the normal function of the tunnel,and causing harm to the foundation structure,personnel,and property in severe cases.This article formulates a finite element numerical computation model for solid elements using three-dimensional elastic body theory and integrates field measurements to substantiate and ascertain the crucial parameter configurations of the finite element model.By proposing a comprehensive startup timing function for high-frequency dynamic machines under different startup conditions,simulating the frequency andmagnitude variations during the startup process,and suggesting functions for changes in frequency and magnitude,a simulated startup schedule function for high-frequency machines is created through coupling.Taking into account the selection of the transient dynamic analysis step length,the dynamic response results for the lower dynamic foundation during its fundamental frequency crossing process are obtained.The validation checks if the structural magnitude surpasses the safety threshold during the critical phase of unit startup traversing the structural resonance region.The design recommendations for high-frequency units’dynamic foundations are provided,taking into account the startup process of the machine and ensuring the safe operation of the tunnel.展开更多
In order to study the towing dynamic properties of the large-scale composite bucket foundation the hydrodynamic software MOSES is used to simulate the dynamic motion of the foundation towed to the construction site.Th...In order to study the towing dynamic properties of the large-scale composite bucket foundation the hydrodynamic software MOSES is used to simulate the dynamic motion of the foundation towed to the construction site.The MOSES model with the prototype size is established as the water draft of 5 and 6 m under the environmental conditions on site.The related factors such as towing force displacement towing accelerations in six degrees of freedom of the bucket foundation and air pressures inside the bucket are analyzed in detail.In addition the towing point and wave conditions are set as the critical factors to simulate the limit conditions of the stable dynamic characteristics.The results show that the large-scale composite bucket foundation with reasonable subdivisions inside the bucket has the satisfying floating stability.During the towing process the air pressures inside the bucket obviously change little and it is found that the towing point at the waterline is the most optimal choice.The characteristics of the foundation with the self-floating towing technique are competitive for saving lots of cost with few of the expensive types of equipment required during the towing transportation.展开更多
The key in the force transmission between the tower and the foundation for offshore wind turbines is to transfer the large moment and horizontal loads. The finite element model of a large-scale prestressing bucket fou...The key in the force transmission between the tower and the foundation for offshore wind turbines is to transfer the large moment and horizontal loads. The finite element model of a large-scale prestressing bucket founda- tion for offshore wind turbines is set up and the structural characteristics of the arc transition structure of the founda- tion are analyzed for 40-60 channels(20-30 rows) arranged with prestressing steel strand under the same ultimate load and boundary conditions. The mechanical characteristics of the key parts of the foundation structures are illus- trated by the peak of the principal tensile stress, the peak of the principal compressive stress and the distribution areas where the principal tensile stress is larger than 2.00 MPa. It can be concluded that the maximum principal tensile stress of the arc transition decreases with the increasing number of channels, and the amplitude does not change signifi- cantly; the maximum principal compressive stress increases with the increasing number of channels and the amplitude changes significantly; however, for the distribution areas where the principal tensile stress is larger than 2.00 MPa, with different channel numbers, the phenomenon is not obvious. Furthermore, the principal tensile stress at the top of the foundation beams fluctuantly increases with the increasing number of channels and for the top cover of the bucket, the principal tensile stress decreases with the increasing number of channels.展开更多
In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the d...In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year.展开更多
The article introduces the main practices and achievements of the Environment and Plant Protection Institute of Chinese Academy of Tropical Agricultural Sciences in promoting the sharing of large-scale instruments and...The article introduces the main practices and achievements of the Environment and Plant Protection Institute of Chinese Academy of Tropical Agricultural Sciences in promoting the sharing of large-scale instruments and equipment in recent years,analyzes the existing problems in the management system,management team,assessment incentives and maintenance guarantee,and proposes improvement measures and suggestions from aspects of improving the sharing management system,strengthening management team building,strengthening sharing assessment and incentives,improving maintenance capabilities and expanding external publicity,to further improve the sharing management of large-scale instruments and equipment.展开更多
The level of personnel operation ability determines the expected effectiveness of large-scale complex equipment. Firstly, this paper constructs the personnel operational ability evaluation index system and analyzes th...The level of personnel operation ability determines the expected effectiveness of large-scale complex equipment. Firstly, this paper constructs the personnel operational ability evaluation index system and analyzes the data source of index. Secondly, the weight of index is determined and the fuzzy comprehensive evaluation model is proposed. Finally, results of instance analysis show that the evaluation model is feasible and effective.展开更多
A new type of impedance-balanced ship equipment foundation structure based on the principle of impedance balancing using a“discontinuous panel-vibration isolation liquid layer-foundation structure”is proposed to sol...A new type of impedance-balanced ship equipment foundation structure based on the principle of impedance balancing using a“discontinuous panel-vibration isolation liquid layer-foundation structure”is proposed to solve the problem of poor low-frequency vibration isolation of the foundation under unbalanced excitation of shipboard equipment.Based on the finite element method,the influence of characteristic parameters of the foundation panel structure on its vibration reduction characteristics under unbalanced excitation is explored.The results show that the vibration isolation level of the impedance-balanced foundation is 10 dB higher than the traditional foundation in the low-frequency band of 10-500 Hz when subjected to combined excitation of concentrated force and moment.Increasing the thickness of the impedance-balanced foundation panel can enhance the isolation effect.Increasing the number of sub-panels can effectively reduce the vibration response of the foundation panel and enhance the isolation performance of the foundation.The connection stiffness between sub-panels has a small effect on the isolation performance of the foundation.展开更多
The development history of the offshore wind gravity foundation in Europe is briefly introduced.Sumnarized in which the equipment relates to offshore wind power installation,including ships and special equipment relat...The development history of the offshore wind gravity foundation in Europe is briefly introduced.Sumnarized in which the equipment relates to offshore wind power installation,including ships and special equipment related to wind power installation.And the installation method and technology of gravity foundation are analyzed.The development trend of the offshore wind power gravity foundation is put forward.展开更多
基金Smart Integration Key Technologies and Application Demonstrations of Large Scale Underground Space Disaster Prevention and Reduction in Guangzhou International Financial City([2021]–KJ058).
文摘The specialized equipment utilized in long-line tunnel engineering is evolving towards large-scale,multifunctional,and complex orientations.The vibration caused by the high-frequency units during regular operation is supported by the foundation of the units,and the magnitude of vibration and the operating frequency fluctuate in different engineering contexts,leading to variations in the dynamic response of the foundation.The high-frequency units yield significantly diverse outcomes under different startup conditions and times,resulting in failure to meet operational requirements,influencing the normal function of the tunnel,and causing harm to the foundation structure,personnel,and property in severe cases.This article formulates a finite element numerical computation model for solid elements using three-dimensional elastic body theory and integrates field measurements to substantiate and ascertain the crucial parameter configurations of the finite element model.By proposing a comprehensive startup timing function for high-frequency dynamic machines under different startup conditions,simulating the frequency andmagnitude variations during the startup process,and suggesting functions for changes in frequency and magnitude,a simulated startup schedule function for high-frequency machines is created through coupling.Taking into account the selection of the transient dynamic analysis step length,the dynamic response results for the lower dynamic foundation during its fundamental frequency crossing process are obtained.The validation checks if the structural magnitude surpasses the safety threshold during the critical phase of unit startup traversing the structural resonance region.The design recommendations for high-frequency units’dynamic foundations are provided,taking into account the startup process of the machine and ensuring the safe operation of the tunnel.
基金The National Natural Science Foundation of China(No.51109160)the National High Technology Research and Development Program of China(863 Program)(No.2012AA051705)+1 种基金the International S&T Cooperation Program of China(No.2012DFA70490)the Natural Science Foundation of Tianjin(No.13JCQNJC06900,13JCYBJC19100)
文摘In order to study the towing dynamic properties of the large-scale composite bucket foundation the hydrodynamic software MOSES is used to simulate the dynamic motion of the foundation towed to the construction site.The MOSES model with the prototype size is established as the water draft of 5 and 6 m under the environmental conditions on site.The related factors such as towing force displacement towing accelerations in six degrees of freedom of the bucket foundation and air pressures inside the bucket are analyzed in detail.In addition the towing point and wave conditions are set as the critical factors to simulate the limit conditions of the stable dynamic characteristics.The results show that the large-scale composite bucket foundation with reasonable subdivisions inside the bucket has the satisfying floating stability.During the towing process the air pressures inside the bucket obviously change little and it is found that the towing point at the waterline is the most optimal choice.The characteristics of the foundation with the self-floating towing technique are competitive for saving lots of cost with few of the expensive types of equipment required during the towing transportation.
基金Supported by Creative Research Groups of National Natural Science Foundation of China (No. 51021004)Program for Changjiang Scholars and Innovative Research Team in University (No. IRT0851)
文摘The key in the force transmission between the tower and the foundation for offshore wind turbines is to transfer the large moment and horizontal loads. The finite element model of a large-scale prestressing bucket founda- tion for offshore wind turbines is set up and the structural characteristics of the arc transition structure of the founda- tion are analyzed for 40-60 channels(20-30 rows) arranged with prestressing steel strand under the same ultimate load and boundary conditions. The mechanical characteristics of the key parts of the foundation structures are illus- trated by the peak of the principal tensile stress, the peak of the principal compressive stress and the distribution areas where the principal tensile stress is larger than 2.00 MPa. It can be concluded that the maximum principal tensile stress of the arc transition decreases with the increasing number of channels, and the amplitude does not change signifi- cantly; the maximum principal compressive stress increases with the increasing number of channels and the amplitude changes significantly; however, for the distribution areas where the principal tensile stress is larger than 2.00 MPa, with different channel numbers, the phenomenon is not obvious. Furthermore, the principal tensile stress at the top of the foundation beams fluctuantly increases with the increasing number of channels and for the top cover of the bucket, the principal tensile stress decreases with the increasing number of channels.
基金Supported by National High Technology Research and Development Program of China("863"Program,No.2012AA051705)National Natural Science Foundation of China(No.51109160)International Science and Technology Cooperation Program of China(No.2012DFA70490)
文摘In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year.
文摘The article introduces the main practices and achievements of the Environment and Plant Protection Institute of Chinese Academy of Tropical Agricultural Sciences in promoting the sharing of large-scale instruments and equipment in recent years,analyzes the existing problems in the management system,management team,assessment incentives and maintenance guarantee,and proposes improvement measures and suggestions from aspects of improving the sharing management system,strengthening management team building,strengthening sharing assessment and incentives,improving maintenance capabilities and expanding external publicity,to further improve the sharing management of large-scale instruments and equipment.
基金supported by the Natural Science Foundation of China(71704184)Projects of the of the National Social Science Foundation of China(15GJ003-245)Science Foundation of Equipment Research(JJ20172A05095)
文摘The level of personnel operation ability determines the expected effectiveness of large-scale complex equipment. Firstly, this paper constructs the personnel operational ability evaluation index system and analyzes the data source of index. Secondly, the weight of index is determined and the fuzzy comprehensive evaluation model is proposed. Finally, results of instance analysis show that the evaluation model is feasible and effective.
基金funded by the National Natural Science Foundation of China(Grant Numbers.U2006229 and 52101351)。
文摘A new type of impedance-balanced ship equipment foundation structure based on the principle of impedance balancing using a“discontinuous panel-vibration isolation liquid layer-foundation structure”is proposed to solve the problem of poor low-frequency vibration isolation of the foundation under unbalanced excitation of shipboard equipment.Based on the finite element method,the influence of characteristic parameters of the foundation panel structure on its vibration reduction characteristics under unbalanced excitation is explored.The results show that the vibration isolation level of the impedance-balanced foundation is 10 dB higher than the traditional foundation in the low-frequency band of 10-500 Hz when subjected to combined excitation of concentrated force and moment.Increasing the thickness of the impedance-balanced foundation panel can enhance the isolation effect.Increasing the number of sub-panels can effectively reduce the vibration response of the foundation panel and enhance the isolation performance of the foundation.The connection stiffness between sub-panels has a small effect on the isolation performance of the foundation.
基金supported by 2019 Science and Technology Project of Qingdao West Coast New Area(2019-8)。
文摘The development history of the offshore wind gravity foundation in Europe is briefly introduced.Sumnarized in which the equipment relates to offshore wind power installation,including ships and special equipment related to wind power installation.And the installation method and technology of gravity foundation are analyzed.The development trend of the offshore wind power gravity foundation is put forward.