期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
航空项目资源均衡优化问题的蚁群-模拟退火算法 被引量:2
1
作者 舒湘沅 杨铭 王延平 《航空制造技术》 2010年第13期77-81,共5页
为有效提高复杂航空项目资源利用率、节约项目成本,提出了一种求解大规模网络计划资源均衡优化问题的蚁群-模拟退火算法。该方法中,首先采用预处理方法对航空项目分级网络计划实施合并,并结合资源指数与搭接网络关系定义建立了资源优化... 为有效提高复杂航空项目资源利用率、节约项目成本,提出了一种求解大规模网络计划资源均衡优化问题的蚁群-模拟退火算法。该方法中,首先采用预处理方法对航空项目分级网络计划实施合并,并结合资源指数与搭接网络关系定义建立了资源优化目标函数。然后,探讨了以网络计划为基础的蚁群-模拟退火算法解空间构建方法,给出了算法的状态转移规则、信息素更新规则,提出了增加搜索效率的模拟退火局部搜索策略,并建立了详细的资源均衡优化方案求解步骤。最后,采用典型实例验证了方法的有效性。 展开更多
关键词 航空项目 资源均衡 蚁群算法 模拟 退火算法
下载PDF
Sensitivity analysis of project level MOVES running emission rates for light and heavy duty vehicles 被引量:8
2
作者 Zhuo Yao Heng Wei +2 位作者 Harikishan Peragu Hao Liu Zhixia Li 《Journal of Traffic and Transportation Engineering(English Edition)》 2014年第2期81-96,共16页
In order to understand how the uncertainties in the output can be apportioned to different sources of uncertainties in its inputs, it is critical to investigate the sensitivity of MOVES model. The MOVES model sensitiv... In order to understand how the uncertainties in the output can be apportioned to different sources of uncertainties in its inputs, it is critical to investigate the sensitivity of MOVES model. The MOVES model sensitivity for regional level has been well studied. However, the uncertainty analysis for project level running emissions has not been well understood. In this research, the MOVES model project level sensitivity tests on running emissions were conducted thru the analysis of vehicle specific power (VSP), scaled tractive power (STP), and MOVES emission rates versus speed curves. This study tested the speed, acceleration, and grade-three most critical variables for vehicle specific power for light duty vehicles and scaled tractive power for heavy duty vehicles. For the testing of STP, four regulatory classes of heavy duty vehicles including light heavy duty (LHD), medium heavy duty (MHD), heavy heavy duty (HHD) and bus were selected. MOVES project running emission rates were also tested for CO, PM2.5, NOx, and VOC versus the operating speeds. A Latin Hypercube (LH) sampling based on method for estimation of the "Sobal" sensitivity indices shows that the speed is the most critical variable among the three inputs for both VSP and STP. Acceleration and grades show lower response to the main effects and sensitivity indices. MOVES emission rates versus speeds curves for light duty vehicles show that highest emission occurs at lower speed range. No significant differences on emission rates among the regulatory classes of heavy duty vehicles are identified. 展开更多
关键词 MOVES model sensitivity analysis project level emission rates
原文传递
Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving the model with Benders decomposition
3
作者 Loghman Piri Vahidreza Ghezavati Ashkan Hafezalkotob 《Frontiers of Engineering Management》 2022年第1期117-134,共18页
Grand infrastructure projects,such as dam,power plant,petroleum,and gas industry projects,have several contractors working on them in several independent sub-projects.The concern of reducing the duration of these proj... Grand infrastructure projects,such as dam,power plant,petroleum,and gas industry projects,have several contractors working on them in several independent sub-projects.The concern of reducing the duration of these projects is one of the important issues among various aspects;thus,our aim is to fulfill the requirements by using the game theory approach.In this study,a mixed-integer programming model consisting of game theory and project scheduling is developed to reduce the duration of projects with a minimum increase in costs.In this model,two contractors in successive periods are entered into a step-by-step competition by the employer during dynamic games,considering an exchange in their limited resources.The optimum solution of the game in each stage are selected as the strategy,and the resources during the game are considered to be renewable and limited.The strategy of each contractor can be described as follows:1)share their resources with the other contractor and 2)not share the resources with the other contractor.This model can act dynamically in all circumstances during project implementation.If a player chooses a non-optimum strategy,then this strategy can immediately update itself at the succeeding time period.The proposed model is solved using the exact Benders decomposition method,which is coded in GAMS software.The results suggest the implementation of four step-by-step games between the contractors.Then,the results of our model are compared with those of the conventional models.The projects’duration in our model is reduced by 22.2%.The nominal revenue of both contractors has also reached a significant value of 46078 units compared with the relative value of zero units in the original model.Moreover,we observed in both projects the decreases of 19.5%,20.9%,and 19.7%in the total stagnation of resources of types 1,2,and 3,respectively. 展开更多
关键词 project scheduling resource leveling between projects constrained resources game theory Benders decomposition
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部