期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Effects of freezing-thawing on the engineering performance of core wall soil materials of a dam in the process of construction 被引量:1
1
作者 REN Xiu-ling YU Qi-hao +4 位作者 ZHANG Gui-ke YUE Pan LIU En-long ZHANG Zhen-yu YOU Yan-hui 《Journal of Mountain Science》 SCIE CSCD 2020年第11期2840-2852,共13页
The construction of water conservancy projects in cold regions experiences freezing-thawing cycles,which can greatly change the engineering properties of soil and have a significant impact on the construction of proje... The construction of water conservancy projects in cold regions experiences freezing-thawing cycles,which can greatly change the engineering properties of soil and have a significant impact on the construction of projects.Lianghekou Hydropower Station(LHS),is a controlling station with the largest installed capacity among the 7 middle reach projects in the Yalong River,the secondary tributary of the Yangtze River.LHS is located in a seasonally frozen soil area.Based on the measured data of air and ground temperature in winter in the dam core wall,the freezing-thawing variation of gravelly soil and contact clay during the filling process of the core wall are compared and analyzed,then the main impact factors of the freezing-thawing variation of soils are discussed.The results show that under the influence of air temperature,soil freezes unidirectionally from ground surface downward and deepens gradually,and the thawing processes are different at the aspects of thawing direction and rate.Air temperature and physical properties of soil including soil type,moisture content and dry density affect the freezingthawing processes of soils.And the impact of engineering construction is more remarkable than natural factors.The engineering construction affects soil temperature and freezing-thawing process by controlling the initial temperature of soil,the speed and duration of the technological conversion of paving,compaction,and the length of placed duration at night.Due to the long placed duration of soil with the slow construction method,the initial temperature of soil gradually reduces,the heat transfer process inside soil is fast.Then the internal heat of soil releases,the decreasing rate of ground temperature of soil at different depths is fast and the frozen depth deepens.While due to the short placed duration of soil with the rapid construction process,the initial temperature of soil is high,high internal heat of soil is supplied every day,and the heat transfer process inside soil is slow.Then the decreasing rate of temperature of soil at different depths is slow,and the variation amplitude of frozen depth is small.This study provides useful guidance for the freezingthawing prevention during the construction process of core wall dams located at high altitude region in winter. 展开更多
关键词 lianghekou hydropower station(LHS) Gravelly soil Contact clay Freezing-thawing variation Impact factors
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部