For facing the challenges brought by large-scale renewable energy having access to the system and considering the key technologies of energy Internet,it is very necessary to put forward the location method of distribu...For facing the challenges brought by large-scale renewable energy having access to the system and considering the key technologies of energy Internet,it is very necessary to put forward the location method of distribution network equipment and capacity from the perspective of life cycle cost.Compared with the traditional energy network,the equipment capacity problem of energy interconnected distribution network which involves in electricity network,thermal energy network and natural gas network is comprehensively considered in this paper.On this basis,firstly,the operation architecture of energy interconnected distribution network is designed.Secondly,taking the grid connection location and configuration capacity of key equipment in the system as the control variables and the operation cost of system comprehensive planning in the whole life cycle as the goal,the equipment location and capacity optimization model of energy interconnected distribution network is established.Finally,an IEEE 33 bus energy mutual distribution grid system is taken for example analysis,and the improved chaotic particle swarmoptimization algorithm is used to solve it.The simulation results show that the method proposed in this paper is suitable for the equipment location and capacity planning of energy interconnected distribution network,and it can effectively improve the social and economic benefits of system operation.展开更多
基金The authors received specific funding for State Grid Corporation Headquarters Project Support,Key Technologies and Applications of Planning and Decision-Making Based on the Full Cost Chain of the Power Grid,Grant No.5205331800001.
文摘For facing the challenges brought by large-scale renewable energy having access to the system and considering the key technologies of energy Internet,it is very necessary to put forward the location method of distribution network equipment and capacity from the perspective of life cycle cost.Compared with the traditional energy network,the equipment capacity problem of energy interconnected distribution network which involves in electricity network,thermal energy network and natural gas network is comprehensively considered in this paper.On this basis,firstly,the operation architecture of energy interconnected distribution network is designed.Secondly,taking the grid connection location and configuration capacity of key equipment in the system as the control variables and the operation cost of system comprehensive planning in the whole life cycle as the goal,the equipment location and capacity optimization model of energy interconnected distribution network is established.Finally,an IEEE 33 bus energy mutual distribution grid system is taken for example analysis,and the improved chaotic particle swarmoptimization algorithm is used to solve it.The simulation results show that the method proposed in this paper is suitable for the equipment location and capacity planning of energy interconnected distribution network,and it can effectively improve the social and economic benefits of system operation.