期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Behavior of reinforced concrete structural walls with various opening locations: experiments and macro model
1
作者 Ji-yang WANG Masanobu SAKASHITA +2 位作者 Susumu KONO Hitoshi TANAKA Wen-juan LOU 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2010年第3期202-211,共10页
Two experimental tests of three-storied reinforced concrete structural walls having large openings were performed.Based on an original macro model,a multiple modified macro-model was proposed to develop a simple metho... Two experimental tests of three-storied reinforced concrete structural walls having large openings were performed.Based on an original macro model,a multiple modified macro-model was proposed to develop a simple method to design a reinforced concrete structural wall with large openings and various opening locations.The interaction between reinforcement ties and concrete struts formed along the perimeter of openings was neglected in the original model.However,the strut-and-tie node was proposed to take account of such interaction in the proposed model.The predicted behavior of two specimens using such a proposed model was compared with the experimental results.It is shown that the behavior of structural walls with large openings could be modeled well using the proposed model.Moreover,the study indicates that the proposed model is applicable even in cases of multi-story structural walls having large openings and various opening locations. 展开更多
关键词 Structural wall Shear behavior Multiple modified macro model Various opening locations Opening ratio
原文传递
Warehouse scheduling performance analysis considering LHRL 被引量:2
2
作者 Wen-Qiang Yang Li Deng +1 位作者 Qun Niu Min-Rui Fei 《Advances in Manufacturing》 SCIE CAS 2013年第2期136-142,共7页
Warehouse scheduling efficiency has to do with the length-height ratio of location (LHRL) to some extent, which hasn't been well investigated until now. In this paper a mathematic model is built by analyzing the re... Warehouse scheduling efficiency has to do with the length-height ratio of location (LHRL) to some extent, which hasn't been well investigated until now. In this paper a mathematic model is built by analyzing the relation between the travel time of the stacker and LHRL. Mean- while, warehouse scheduling strategy is studied combining with the project on the automatic production line of an enterprise, and a warehouse scheduling strategy is pro- posed based on index of quality (IoQ) parameters. Besides, the process of getting the value of IoQ is also simplified with the idea of sparse matrix. Finally, the IoQ scheduling strategy is compared with random strategy and First Come First Out strategy in different LHRLs. The simulation results show that the IoQ scheduling strategy not only improves the quality of the product effectively, but also improves the efficiency of the scheduling substantially. 展开更多
关键词 Warehouse scheduling Performance analysisIndex of quality (IoQ) Length-height ratio of location(LHRL) Sparse matrix
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部