The Lom Pangar dam, the largest reservoir in Cameroon with a storage capacity of 6 km3 and a 30 MW hydropower plant, primarily regulates the hydrologic regime of the Sanaga River to maintain hydropower efficiency duri...The Lom Pangar dam, the largest reservoir in Cameroon with a storage capacity of 6 km3 and a 30 MW hydropower plant, primarily regulates the hydrologic regime of the Sanaga River to maintain hydropower efficiency during dry seasons and enhance downstream hydropower plant performance. Understanding and managing sediments are crucial for the sustainability of dams, as indicated by numerous studies. This study assessed the granulometry of the sediments transported across the reservoir. For that purpose, 6 samples of fresh sediments were collected in the lacustrine and transitional sections of the reservoir using the standard method. Particles size was assessed using the laser diffusion technic after a 3 mm sieving. Various granulometric parameters were derived from the literature to analyze and characterize those sediments. Results show that silts are more than 70% of particles size and range between 2.19 - 60.26 µm. Size distribution also shows the same trend with D75 less than 51 µm. This is confirmed by the low values of Inman Skewness SkΦ (−0.168 to 0.303). The Sorting index S0 ranges from 0.31 to 0.53 µm, showing a very well-sorted sediments, aligning with low values of Krumbein index (0.906 - 1.683) that express the low heterometry of the particles. The consequence on the dam will be a quick clogging of the bottom of the reservoir. Their pH varies from 7.0 to 7.5. It also appears that the sandy fraction trend is higher in the right bank of the dam and reaches 22% on the right bank of Pangar River due to crystalline geology. Fraction greater than 3000 µm is negligible. The management of the dam has to keep attention to these results as siltation may close the safety outlet of the dam, damage turbines, and provoke recurrent technical and safety issues. Further, the clogging of the bottom of the reservoir may lead to an ecological problem with the limitation of hyporheic flow. Thus, water exchange with the underground water table and the natural purification of water reduce, while increasing sediments deposits change the biogeochemistry processes.展开更多
The Lom Pangar hydroelectric dam project located in the eastern region of Cameroon was implemented by Electricity Development Corporation (EDC). The impoundment of the Lom Pangar dam created a large reservoir with an ...The Lom Pangar hydroelectric dam project located in the eastern region of Cameroon was implemented by Electricity Development Corporation (EDC). The impoundment of the Lom Pangar dam created a large reservoir with an area ~590 km2 and a useful storage capacity ~6 billion m3. Thereby, this impoundment has created favourable conditions for the proliferation of fishery resources. However, a fisheries assessment study based on fishing activities is essential to attain reliable information for implementing a management plan to achieve rational and sustainable exploitation. This study was carried out on the ichtyofaunic inventory and the assessment of fish landings in Lom Pangar hydroelectric dam reservoir from April 2016 to September 30, 2016. Three main groups of fishing gear have been identified, among which gillnets, traps and longlines occupy major fishing activities. Indeed, the spatial and landing sites surveies were conducted on species composition, size composition, and quantities of fish landed during the study period. Moreover, 37 species of fish divided into 16 families were found in seven different selected fish landing sites. Carp (Cyprinus carpio) was the major fish species abundantly caught by these fishing gears which accounted for 81.60% of the total catch, and the least species was sardine (Sardinella aurita). A total of 623,229 Kg of fish were landed which were dominated by those of the Wami landing site with 480,773 Kg representing 76.96% of the total landed catches. The smallest species caught was the white carp (7 cm) while the longest one was the catfish (71 cm). In addition, the species of fish in the breeding season are carp, catfish, viper fish and red tail.展开更多
文摘The Lom Pangar dam, the largest reservoir in Cameroon with a storage capacity of 6 km3 and a 30 MW hydropower plant, primarily regulates the hydrologic regime of the Sanaga River to maintain hydropower efficiency during dry seasons and enhance downstream hydropower plant performance. Understanding and managing sediments are crucial for the sustainability of dams, as indicated by numerous studies. This study assessed the granulometry of the sediments transported across the reservoir. For that purpose, 6 samples of fresh sediments were collected in the lacustrine and transitional sections of the reservoir using the standard method. Particles size was assessed using the laser diffusion technic after a 3 mm sieving. Various granulometric parameters were derived from the literature to analyze and characterize those sediments. Results show that silts are more than 70% of particles size and range between 2.19 - 60.26 µm. Size distribution also shows the same trend with D75 less than 51 µm. This is confirmed by the low values of Inman Skewness SkΦ (−0.168 to 0.303). The Sorting index S0 ranges from 0.31 to 0.53 µm, showing a very well-sorted sediments, aligning with low values of Krumbein index (0.906 - 1.683) that express the low heterometry of the particles. The consequence on the dam will be a quick clogging of the bottom of the reservoir. Their pH varies from 7.0 to 7.5. It also appears that the sandy fraction trend is higher in the right bank of the dam and reaches 22% on the right bank of Pangar River due to crystalline geology. Fraction greater than 3000 µm is negligible. The management of the dam has to keep attention to these results as siltation may close the safety outlet of the dam, damage turbines, and provoke recurrent technical and safety issues. Further, the clogging of the bottom of the reservoir may lead to an ecological problem with the limitation of hyporheic flow. Thus, water exchange with the underground water table and the natural purification of water reduce, while increasing sediments deposits change the biogeochemistry processes.
文摘The Lom Pangar hydroelectric dam project located in the eastern region of Cameroon was implemented by Electricity Development Corporation (EDC). The impoundment of the Lom Pangar dam created a large reservoir with an area ~590 km2 and a useful storage capacity ~6 billion m3. Thereby, this impoundment has created favourable conditions for the proliferation of fishery resources. However, a fisheries assessment study based on fishing activities is essential to attain reliable information for implementing a management plan to achieve rational and sustainable exploitation. This study was carried out on the ichtyofaunic inventory and the assessment of fish landings in Lom Pangar hydroelectric dam reservoir from April 2016 to September 30, 2016. Three main groups of fishing gear have been identified, among which gillnets, traps and longlines occupy major fishing activities. Indeed, the spatial and landing sites surveies were conducted on species composition, size composition, and quantities of fish landed during the study period. Moreover, 37 species of fish divided into 16 families were found in seven different selected fish landing sites. Carp (Cyprinus carpio) was the major fish species abundantly caught by these fishing gears which accounted for 81.60% of the total catch, and the least species was sardine (Sardinella aurita). A total of 623,229 Kg of fish were landed which were dominated by those of the Wami landing site with 480,773 Kg representing 76.96% of the total landed catches. The smallest species caught was the white carp (7 cm) while the longest one was the catfish (71 cm). In addition, the species of fish in the breeding season are carp, catfish, viper fish and red tail.